Laserfiche WebLink
<br />Industrial user cost recovery amounts shall be the sum of the <br /> <br />products obtained by multiplying the annual grant amount as <br /> <br />determined above by the percentage of Industrial Flow and BOD <br /> <br />during the billing period. <br /> <br />To calculate industrial unit cost recovery charges, divide the <br /> <br />recoverable amounts calculated above by the total industrial <br /> <br />Flow and BOD for the billing period. <br /> <br />The cost recovery charges to the individual industries shall be <br /> <br />calculated by multiplying the unit cost as determined above by <br /> <br />the industrial users actual Flow and BOD. <br /> <br />4. In addition to the charges provided for herein, the City may <br /> <br />impose a surcharge on any industrial user based on some other <br /> <br />pollutant loading factor which requires special treatment at <br /> <br />the Wastewater Treatment Plant. <br /> <br />Section 2:4Q - Measurements of Strength and Volume <br /> <br />1. When required by the City, each industrial user shall install <br /> <br />suitable measuring, sampling and analyzing devices. <br /> <br />2. The City shall not require installation of such devices where <br /> <br />the City determines that such industrial user has concentrations <br /> <br />of BOD, no greater than the concentration of such constituents <br /> <br />in the general municipal flow and a satisfactory method and <br /> <br />access exist for sampling and determining the total daily sewage <br /> <br />flow. In such cases, the charges to those industrial users shall <br /> <br />be based on the flow rate as determined and on BOD loads equal to <br /> <br />the average load of the general municipal flow. <br /> <br />3. Each industrial user required by the City to install and maintain <br /> <br />sewerage monitoring facilities shall submit to the City a monthly <br /> <br />report of daily flow and BOD on a form approved by the City. <br /> <br />This report shall be used for billing purposes and shall be <br /> <br />submitted prior to the 15th day of the subsequent month. <br /> <br />-9- <br />