Laserfiche WebLink
<br />I <br /> <br /> <br />4. The City shall have the right to periodically or continuously <br /> <br />inspect the monitoring facilities, to measure, sample and <br /> <br />analyze the user's flow and to analyze the samples obtained by <br /> <br />the industrial user. <br /> <br />In the event of any discrepancy between the flows or loads <br /> <br />determined by the City and the industrial user, the values <br /> <br />determined by the City shall be used for billing purposes. <br /> <br />Section 2:50 _ Charges for General Users - Domestic, Commercial," Institutional <br /> <br />and Government Users <br /> <br />1. The category B charge, user charge for operation and maintenance <br /> <br />shall be based on water meter records for the first quarter of <br /> <br />each year. The amount of Category B revenues that the City <br /> <br />determines is necessary for the annual operation" and maintenance <br /> <br />of the treatment facilities less the user fees collected from <br /> <br />other municipalities, contract users, and industrial users, this <br /> <br />diffe~ence divided by the total volume of water metered by <br /> <br />general users in the first quarter of the year shall be the <br /> <br />cost factor for the user charge. The cost factor for the user <br /> <br />charge multiplied by the user's water consumption volume as <br /> <br />determined by water meter readings in the first quarter of the <br /> <br />year shall be the annual user charge for the user. <br /> <br />2. The Category A cost, Debt Service for Wastewater Treatment <br /> <br />Facilities, shall be recovered by (1) a debt service connection <br /> <br />charge assessed against new building units and (~) a debt service <br /> <br />user charge based on water meter records for the first quarter of <br />\ <br /> <br />each year. <br /> <br /> <br />The Debt Service Connection Charge is to be paid at the time at <br /> <br />which a building permit or a sewer connection permit is issued for <br /> <br />all buildings to be constructed or connected to the sewer system <br /> <br />on or after the effective date of this ordinance. No charge <br /> <br />-10- <br /> <br />.... <br />