|
Electric
<br />16-1600
<br />26A
<br />PD-Precast Rough-In's
<br />Material
<br />$ 564.00
<br />$ -
<br />$ -
<br />$ 564.00
<br />$ 564.00
<br />$ 564.00
<br />100.00%
<br />Electric
<br />16-1600
<br />26A
<br />PD -Precast Rough-In's
<br />Labor
<br />$ 4,135.00
<br />$ -
<br />$ -
<br />$ 4,135.00
<br />$ 4,135.00
<br />$ 4,135.00
<br />100.00%
<br />Electric
<br />16-1600
<br />26A
<br />PD- Power/Devices/Receptacles
<br />Material
<br />$ 8,409.00
<br />$ -
<br />$ -
<br />$ 8,409.00
<br />$ 8,409.00
<br />$ 8,409.00
<br />100.00%
<br />Electric
<br />16-1600
<br />26A
<br />PD- Power/Devices/Receptacles
<br />Labor
<br />$ 17,640.00
<br />$ -
<br />$ -
<br />$ 17,640.00
<br />$ 17,640.00
<br />$ 17,640.00
<br />100.00%
<br />Electric
<br />16-1600
<br />26A
<br />PD-Unit Heaters
<br />Material
<br />$ 200.00
<br />$ -
<br />$ -
<br />$ 200.00
<br />$ 200.00
<br />$ 200.00
<br />100.00%
<br />Electric
<br />16-1600
<br />26A
<br />PD-Unit Heaters
<br />Labor
<br />$ 477.00
<br />$ -
<br />$ -
<br />$ 477.00
<br />$ 477.00
<br />$ 477.00
<br />100.00%
<br />Electric
<br />16-1600
<br />26A
<br />PD- Exhaust Fans
<br />Material
<br />$ 462.00
<br />$ -
<br />$ -
<br />$ 462.00
<br />$ 462.00
<br />$ 462.00
<br />100.00%
<br />Electric
<br />16-1600
<br />26A
<br />PD- Exhaust Fans
<br />Labor
<br />$ 1,132.00
<br />$ -
<br />$ -
<br />$ 1,132.00
<br />$ 1,132.00
<br />$ 1,132.00
<br />100.00%
<br />Electric
<br />16-1600
<br />26A
<br />PD- Boilers
<br />Material
<br />$ 196.00
<br />$ -
<br />$ -
<br />$ 196.00
<br />$ 196.00
<br />$ 196.00
<br />100.00%
<br />Electric
<br />16-1600
<br />26A
<br />PD- Boilers
<br />Labor
<br />$ 339.00
<br />$ -
<br />$ -
<br />$ 339.00
<br />$ 339.00
<br />$ 339.00
<br />100.00%
<br />Electric
<br />16-1600
<br />26A
<br />PD-Pumps
<br />Material
<br />$ 663.00
<br />$ -
<br />$ -
<br />$ 663.00
<br />$ 663.00
<br />$ 663.00
<br />100.00%
<br />Electric
<br />16-1600
<br />26A
<br />PD-Pumps
<br />Labor
<br />$ 2,583.00
<br />$ -
<br />$ -
<br />$ 2,583.00
<br />$ 2,583.00
<br />$ 2,583.00
<br />100.00%
<br />Electric
<br />16-1600
<br />26A
<br />PD-MAU
<br />Material
<br />$ 219.00
<br />$ -
<br />$ -
<br />$ 219.00
<br />$ 219.00
<br />$ 219.00
<br />100.00%
<br />Electric
<br />16-1600
<br />26A
<br />PD-MAU
<br />Labor
<br />$ 979.00
<br />$ -
<br />$ -
<br />$ 979.00
<br />$ 979.00
<br />$ 979.00
<br />100.00%
<br />Electric
<br />16-1600
<br />26A
<br />PD-RTU-1
<br />Material
<br />$ 492.00
<br />$ -
<br />$ -
<br />$ 492.00
<br />$ 492.00
<br />$ 492.00
<br />100.00%
<br />Electric
<br />16-1600
<br />26A
<br />PD-RTU-1
<br />Labor
<br />$ 530.00
<br />$ -
<br />$ -
<br />$ 530.00
<br />$ 530.00
<br />$ 530.00
<br />100.00%
<br />Electric
<br />16-1600
<br />26A
<br />PD-Audio Visual Rough-In's
<br />Material
<br />$ 1,146.00
<br />$ -
<br />$ -
<br />$ 1,146.00
<br />$ 1,146.00
<br />$ 1,146.00
<br />100.00%
<br />Electric
<br />16-1600
<br />26A
<br />PD-Audio Visual Rough-In's
<br />Labor
<br />$ 2,197.00
<br />$ -
<br />$ -
<br />$ 2,197.00
<br />$ 2,197.00
<br />$ 2,197.00
<br />100.00%
<br />Electric
<br />16-1600
<br />26A
<br />PD-Security Rough-In's
<br />Material
<br />$ 1,184.00
<br />$ -
<br />$ -
<br />$ 1,184.00
<br />$ 1,184.00
<br />$ 1,184.00
<br />100.00%
<br />Electric
<br />16-1600
<br />26A
<br />PD-Security Rough-In's
<br />Labor
<br />$ 3,376.00
<br />$ -
<br />$ -
<br />$ 3,376.00
<br />$ 3,376.00
<br />$ 3,376.00
<br />100.00%
<br />Electric
<br />16-1600
<br />26A
<br />PD-Fire Alarm Rough-In's
<br />Material
<br />$ 366.00
<br />$ -
<br />$ -
<br />$ 366.00
<br />$ 366.00
<br />$ 366.00
<br />100.00%
<br />Electric
<br />16-1600
<br />26A
<br />PD-Fire Alarm Rough-In's
<br />Labor
<br />$ 1,786.00
<br />$ -
<br />$ -
<br />$ 1,786.00
<br />$ 1,786.00
<br />$ 1,786.00
<br />100.00%
<br />Electric
<br />16-1600
<br />26A
<br />PD-DATA Rough-In's
<br />Material
<br />$ 676.00
<br />$ -
<br />$ -
<br />$ 676.00
<br />$ 676.00
<br />$ 676.00
<br />100.00%
<br />Electric
<br />16-1600
<br />26A
<br />PD-DATA Rough-In's
<br />Labor
<br />$ 1,752.00
<br />$ -
<br />$ -
<br />$ 1,752.00
<br />$ 1,752.00
<br />$ 1,752.00
<br />100.00%
<br />Electric
<br />16-1600
<br />26A
<br />CO#1 ASI#6
<br />$ -
<br />$ -
<br />$ 773.00
<br />$ 773.00
<br />$ 773.00
<br />$ 773.00
<br />100.00%
<br />Electric
<br />16-1600
<br />26A
<br />CO#2 Rough -in for future PD heat
<br />$ -
<br />$ -
<br />$ 2,612.00
<br />$ 2,612.00
<br />$ 2,612.00
<br />$ 2,612.00
<br />100.00%
<br />Electric
<br />16-1600
<br />26A
<br />CO#3 COR#27 PD Cabinet Lighting
<br />$ -
<br />$ -
<br />$ 965.00
<br />$ 965.00
<br />$ 965.00
<br />$ 965.00
<br />100.00%
<br />Electric
<br />16-1600
<br />26A
<br />CO#4 PR#04R
<br />$ -
<br />$ -
<br />$ 2,267.00
<br />$ 2,267.00
<br />$ 2,267.00
<br />$ 2,267.00
<br />100.00%
<br />Electric
<br />16-1600
<br />26A
<br />CO#5 PR#06R
<br />$ -
<br />$ -
<br />$ (1,050.00)
<br />$ (1,050.00)
<br />$ (1,050.00)
<br />$ (1,050.00)
<br />100.00%
<br />Electric
<br />16-1600
<br />26A
<br />CO#6 PR#11
<br />$ -
<br />$ -
<br />$ 713.00
<br />$ 713.00
<br />$ 713.00
<br />$ 713.00
<br />100.00%
<br />Electric
<br />16-1600
<br />26A
<br />CO#7 COR#32 Light Demo PD Level 2
<br />$ -
<br />$ -
<br />$ 360.00
<br />$ 360.00
<br />$ 360.00
<br />$ 360.00
<br />100.00%
<br />Electric
<br />16-1600
<br />26A
<br />CO#B PR#12
<br />$ -
<br />$ -
<br />$ 2,282.00
<br />$ 2,282.00
<br />$ 2,282.00
<br />$ 2,282.00
<br />100.00%
<br />Electric
<br />16-1600
<br />26A
<br />CO#9 Backcharge for Wall Tile (Non-OC $-150)
<br />$ -
<br />$ -
<br />$ (150.00)
<br />$ (150.00)
<br />$ (150.00)
<br />$ (150.00)
<br />100.00%
<br />Electric
<br />16-1600
<br />26A
<br />CO#10 ASI#12
<br />$ -
<br />$ -
<br />$ 1,992.00
<br />$ 1,992.00
<br />$ 1,992.00
<br />$ 1,992.00
<br />100.00%
<br />Electric
<br />16-1600
<br />26A
<br />CO#11 PR#15
<br />$ -
<br />$ -
<br />$ 176.00
<br />$ 176.00
<br />$ 176.00
<br />$ 176.00
<br />100.00%
<br />Electric
<br />16-1600
<br />26A
<br />CO#12 RFI#100
<br />$ -
<br />$ -
<br />$ 527.00
<br />$ 527.00
<br />$ 527.00
<br />$ 527.00
<br />100.00%
<br />Electric
<br />16-1600
<br />26A
<br />CO#13 PR#22
<br />$ -
<br />$ -
<br />$ 3,483.00
<br />$ 3,483.00
<br />$ 3,483.00
<br />$ 3,483.00
<br />100.00%
<br />Electric
<br />16-1600
<br />26A
<br />CO#14 PR#16
<br />$ -
<br />$ -
<br />$ 961.00
<br />$ 961.00
<br />$ 961.00
<br />$ 961.00
<br />100.00%
<br />Electric
<br />16-1600
<br />26A
<br />CO#15 ASI#14R
<br />$ -
<br />$ -
<br />$ 1,702.00
<br />$ 1,702.00
<br />$ 1,702.00
<br />$ 1,702.00
<br />100.00%
<br />Electric
<br />16-1600
<br />26A
<br />CO#16 PR#21
<br />$ -
<br />$ -
<br />$ 122.00
<br />$ 122.00
<br />$ 122.00
<br />$ 122.00
<br />100.00%
<br />Electric
<br />16-1600
<br />26A
<br />CO#17 ASI#16
<br />$ -
<br />$ -
<br />$ 312.00
<br />$ 312.00
<br />$ 312.00
<br />$ 312.00
<br />100.00%
<br />Electric
<br />16-1600
<br />26A
<br />CO#16 RFI#132
<br />$ -
<br />$ -
<br />$ 466.00
<br />$ 466.00
<br />$ 466.00
<br />$ 466.00
<br />100.00%
<br />Electric
<br />16-1600
<br />26A
<br />CO#19 PR#23
<br />$ -
<br />$ -
<br />$ 1,159.00
<br />$ 1,159.00
<br />$ 1,159.00
<br />$ 1,159.00
<br />100.00%
<br />Electric
<br />16-1600
<br />26A
<br />CO#20 PR#26 Floor Box/ Steam Generator
<br />$ -
<br />$ -
<br />$ 2,852.00
<br />$ 2,852.00
<br />$ 2,852.00
<br />$ 2,852.00
<br />100.00%
<br />Electric
<br />16-1600
<br />26A
<br />CO#21 RFI#142 Added MEP Demo
<br />$ -
<br />$ -
<br />$ 1,080.00
<br />$ 1,080.00
<br />$ 1,080.00
<br />$ 1,080.00
<br />100.00%
<br />Electric
<br />16-1600
<br />26A
<br />CO#22 T&M Underground Work at PD
<br />$ -
<br />$ -
<br />$ 1,206.00
<br />$ 1,206.00
<br />$ 1,206.00
<br />$ 1,206.00
<br />100.00%
<br />Electric
<br />16-1600
<br />26A
<br />CO#23 RFI#160 Power Disconnect at PD N Fan
<br />$ -
<br />$ -
<br />$ 263.00
<br />$ 263.00
<br />$ 263.00
<br />$ 263.00
<br />100.00%
<br />Electric
<br />16-1600
<br />26A
<br />CO#24 RFI#152 Added Demo & Cabinet Demo
<br />$ -
<br />$ -
<br />$ 2,000.00
<br />$ 2,000.00
<br />$ 2,000.00
<br />$ 2,000.00
<br />100.00%
<br />Electric
<br />16-1600
<br />26A
<br />CO#25 ASI#15 Update HP-1 Feed Location
<br />$ -
<br />$ -
<br />$ (377.00)
<br />$ (377.00)
<br />$ (377.00)
<br />$ (377.00)
<br />100.00%
<br />Electric
<br />16-1600
<br />26A
<br />CO#26 Replace Lights in Swat Bay 171
<br />$ -
<br />$ -
<br />$ 3,583.00
<br />$ 3,583.00
<br />$ 3,583.00
<br />$ 3,583.00
<br />100.00%
<br />Electric
<br />16-1600
<br />26A
<br />CO#27 Furinsh & Install 16' Light Pole at PD
<br />$ -
<br />$ -
<br />$ 1,990.00
<br />$ 1,990.00
<br />$ 1,990.00
<br />$ 1,990.00
<br />100.00%
<br />Electric
<br />16-1600
<br />26A
<br />CO#26 PR#29 Relocated Powerfor Air Compressor
<br />$ -
<br />$ -
<br />$ 2,539.00
<br />$ 2,539.00
<br />$ 2,539.00
<br />$ 2,539.00
<br />100.00%
<br />Electric
<br />16-1600
<br />26A
<br />CO#29 Add to Install Light in Mail Room 152
<br />$ -
<br />$ -
<br />$ 532.00
<br />$ 532.00
<br />$ 532.00
<br />$ 532.00
<br />100.00%
<br />Electric
<br />16-1600
<br />26A
<br />CO#30 PR#19 Electrical & Fire Alarm Changes
<br />$ -
<br />$ -
<br />$ 9,223.00
<br />$ 9,223.00
<br />$ -
<br />$ -
<br />0.00%
<br />Electric
<br />16-1600
<br />26A
<br />CO#31 PR#31 Upsize the SCBA Compressor
<br />$ -
<br />$ -
<br />$ 1,965.00
<br />$ 1,965.00
<br />$ 1,965.00
<br />$ 1,965.00
<br />100.00%
<br />Electric
<br />16-1600
<br />26A
<br />CO#32 RFI#166 Install Outlet in Office 106
<br />$ -
<br />$ -
<br />$ 256.00
<br />$ 256.00
<br />$ 256.00
<br />$ 256.00
<br />100.00%
<br />Electric
<br />16-1600
<br />26A
<br />CO#33 RFI#90 Provide Raceway for Garage Door
<br />$ -
<br />$ -
<br />$ 2,536.00
<br />$ 2,536.00
<br />$ 2,536.00
<br />$ 2,536.00
<br />100.00%
<br />Look
<br />31-1000
<br />31A
<br />Mobilization
<br />$ 27,400.00
<br />$ -
<br />$ -
<br />$ 27,400.00
<br />$ 27,400.00
<br />$ 27,400.00
<br />100.00%
<br />Look
<br />31-1000
<br />31A
<br />Locates, Permits, Surveys
<br />$ 17,380.00
<br />$ -
<br />$ -
<br />$ 17,380.00
<br />$ 17,380.00
<br />$ 17,380.00
<br />100.00%
<br />Look
<br />31-1000
<br />31A
<br />Erosion Control
<br />$ 4,840.00
<br />$ -
<br />$ -
<br />$ 4,840.00
<br />$ 4,840.00
<br />$ 4,840.00
<br />100.00%
<br />Look
<br />31-1000
<br />31A
<br />EC Materials
<br />$ 4,000.00
<br />$ -
<br />$ -
<br />$ 4,000.00
<br />$ 4,000.00
<br />$ 4,000.00
<br />100.00%
<br />Look
<br />31-1000
<br />31A
<br />Removals
<br />$ 15,750.00
<br />$ -
<br />$ -
<br />$ 15,750.00
<br />$ 15,750.00
<br />$ 15,750.00
<br />100.00%
<br />Look
<br />31-1000
<br />31A
<br />Temp Agg Base
<br />$ 6,350.00
<br />$ -
<br />$ -
<br />$ 6,350.00
<br />$ 6,350.00
<br />$ 6,350.00
<br />100.00%
<br />Look
<br />31-1000
<br />31A
<br />Grading
<br />$ 15,980.00
<br />$ -
<br />$ -
<br />$ 15,980.00
<br />$ 15,980.00
<br />$ 15,980.00
<br />100.00%
<br />29.20
<br />206.75
<br />420.45
<br />662.00
<br />10.00
<br />23.65
<br />24.10
<br />56.60
<br />9.60
<br />16.95
<br />44.15
<br />129.15
<br />10.95
<br />46.95
<br />24.60
<br />26.50
<br />57.30
<br />109.65
<br />59.20
<br />166.60
<br />16.40
<br />69.30
<br />33.90
<br />67.60
<br />36.65
<br />130.60
<br />46.25
<br />113.35
<br />35.65
<br />19.00
<br />114.10
<br />(7.50
<br />99.60
<br />6.90
<br />26.35
<br />174.15
<br />46.05
<br />65.10
<br />6.10
<br />15.60
<br />23.30
<br />57.95
<br />142.60
<br />54.00
<br />60.30
<br />14.15
<br />100.00
<br />5 179.15
<br />$ 99.50
<br />$ 126.95
<br />$ 26.60
<br />9,223.00 $ -
<br />$ 96.25
<br />$ 12.90
<br />$ 126.60
<br />- $ 1,370.00
<br />$ 669.00
<br />$ 242.00
<br />$ 200.00
<br />$ 767.50
<br />$ 317.50
<br />$ 799.00
<br />
|