16-1600
<br />26A
<br />Mobilization
<br />$ 17,328.00
<br />$ -
<br />$ -
<br />$ 17,328.00
<br />$ 17,328.00
<br />$ 17,328.00
<br />100.00%
<br />$ -
<br />$ 666.40
<br />16-1600
<br />26A
<br />Permit/Bond
<br />$ 4,500.00
<br />$ -
<br />$ -
<br />$ 4,500.00
<br />$ 4,500.00
<br />$ 4,500.00
<br />100.00%
<br />$ -
<br />$ 225.00
<br />16-1600
<br />26A
<br />Exterior Temp Services/ Job Trailer Temp Power
<br />$ 1,500.00
<br />$ -
<br />$ -
<br />$ 1,500.00
<br />$ 1,500.00
<br />$ 1,500.00
<br />100.00%
<br />$ -
<br />$ 75.00
<br />16-1600
<br />26A
<br />Switchgear/Panels/Border States Electric
<br />$ 4,737.00
<br />$ -
<br />$ -
<br />$ 4,737.00
<br />$ 4,737.00
<br />$ 4,737.00
<br />100.00%
<br />$ -
<br />$ 236.65
<br />16-1600
<br />26A
<br />Light Fixtures/Controls/Werener Electric Co.
<br />$ 109,114.00
<br />$ -
<br />$ -
<br />$ 109,114.00
<br />$ 109,114.00
<br />$ 109,114.00
<br />100.00%
<br />$ -
<br />$ 5,455.70
<br />16-1600
<br />26A
<br />Div 26/Fire Alarm/Twenty4Seven
<br />$ 22,667.00
<br />$ -
<br />$ -
<br />$ 22,667.00
<br />$ 22,667.00
<br />$ 22,667.00
<br />100.00%
<br />$ -
<br />$ 1,133.35
<br />16-1600
<br />26A
<br />FD- Demolition
<br />$ 2,197.00
<br />$ -
<br />$ -
<br />$ 2,197.00
<br />$ 2,197.00
<br />$ 2,197.00
<br />100.00%
<br />$ -
<br />$ 109.65
<br />16-1600
<br />26A
<br />FD-Temporary Power/Lights
<br />$ 1,146.00
<br />$ -
<br />$ -
<br />$ 1,146.00
<br />$ 1,146.00
<br />$ 1,146.00
<br />100.00%
<br />$ -
<br />$ 57.30
<br />16-1600
<br />26A
<br />FD-Site Underground
<br />Material
<br />$ 1,060.00
<br />$ -
<br />$ -
<br />$ 1,060.00
<br />$ 1,060.00
<br />$ 1,060.00
<br />100.00%
<br />$ -
<br />$ 53.00
<br />16-1600
<br />26A
<br />FD-Site Underground
<br />Labor
<br />$ 2,980.00
<br />$ -
<br />$ -
<br />$ 2,980.00
<br />$ 2,980.00
<br />$ 2,980.00
<br />100.00%
<br />$ -
<br />$ 149.00
<br />16-1600
<br />26A
<br />FD -Site Pole Base
<br />Material
<br />$ 922.00
<br />$ -
<br />$ -
<br />$ 922.00
<br />$ 922.00
<br />$ 922.00
<br />100.00%
<br />$ -
<br />$ 46.10
<br />16-1600
<br />26A
<br />FD -Site Pole Base
<br />Labor
<br />$ 617.00
<br />$ -
<br />$ -
<br />$ 617.00
<br />$ 617.00
<br />$ 617.00
<br />100.00%
<br />$ -
<br />$ 40.65
<br />16-1600
<br />26A
<br />FD -Site Set Parking Lot Poles
<br />$ 473.00
<br />$ -
<br />$ -
<br />$ 473.00
<br />$ 473.00
<br />$ 473.00
<br />100.00%
<br />$ -
<br />$ 23.65
<br />16-1600
<br />26A
<br />FD- Switchgear/Panels Install
<br />Material
<br />$ 1,127.00
<br />$ -
<br />$ -
<br />$ 1,127.00
<br />$ 1,127.00
<br />$ 1,127.00
<br />100.00%
<br />$ -
<br />$ 56.35
<br />16-1600
<br />26A
<br />FD- Switchgear/Panels Install
<br />Labor
<br />$ 1,666.00
<br />$ -
<br />$ -
<br />$ 1,666.00
<br />$ 1,666.00
<br />$ 1,666.00
<br />100.00%
<br />$ -
<br />$ 94.30
<br />16-1600
<br />26A
<br />FD - Light Fixture Install
<br />Material
<br />$ 4,298.00
<br />$ -
<br />$ -
<br />$ 4,298.00
<br />$ 4,084.00
<br />$ 4,084.00
<br />95.02%
<br />$ 214.00
<br />$ 204.20
<br />16-1600
<br />26A
<br />FD -Light Fixture Install
<br />Labor
<br />$ 13,351.00
<br />$ -
<br />$ -
<br />$ 13,351.00
<br />$ 12,684.00
<br />$ 12,684.00
<br />95.00%
<br />$ 667.00
<br />$ 634.20
<br />16-1600
<br />26A
<br />FD - Light Fixture Controll Install
<br />Material
<br />$ 1,012.00
<br />$ -
<br />$ -
<br />$ 1,012.00
<br />$ 1,012.00
<br />$ 1,012.00
<br />100.00%
<br />$ -
<br />$ 50.60
<br />16-1600
<br />26A
<br />FD- Light Fixture Controll Install
<br />Labor
<br />$ 2,875.00
<br />$ -
<br />$ -
<br />$ 2,875.00
<br />$ 2,875.00
<br />$ 2,875.00
<br />100.00%
<br />$ -
<br />$ 143.75
<br />16-1600
<br />26A
<br />FD- Precast Rough-In's
<br />Material
<br />$ 1,350.00
<br />$ -
<br />$ -
<br />$ 1,350.00
<br />$ 1,350.00
<br />$ 1,350.00
<br />100.00%
<br />$ -
<br />$ 67.50
<br />16-1600
<br />26A
<br />FD- Precast Rough-In's
<br />Labor
<br />$ 4,107.00
<br />$ -
<br />$ -
<br />$ 4,107.00
<br />$ 4,107.00
<br />$ 4,107.00
<br />100.00%
<br />$ -
<br />$ 205.35
<br />16-1600
<br />26A
<br />FD- Power/Devices/Receptcales
<br />Material
<br />$ 9,485.00
<br />$ -
<br />$ -
<br />$ 9,485.00
<br />$ 9,485.00
<br />$ 9,485.00
<br />100.00%
<br />$ -
<br />$ 474.25
<br />16-1600
<br />26A
<br />FD- Power/Devices/Receptcales
<br />Labor
<br />$ 16,038.00
<br />$ -
<br />$ -
<br />$ 16,038.00
<br />$ 16,038.00
<br />$ 16,038.00
<br />100.00%
<br />$ -
<br />$ 601.90
<br />16-1600
<br />26A
<br />FD-Unit Heaters
<br />Material
<br />$ 429.00
<br />$ -
<br />$ -
<br />$ 429.00
<br />$ 366.00
<br />$ 366.00
<br />69.96%
<br />$ 43.00
<br />$ 19.30
<br />16-1600
<br />26A
<br />FD-Unit Heaters
<br />Labor
<br />$ 1,256.00
<br />$ -
<br />$ -
<br />$ 1,256.00
<br />$ 1,005.00
<br />$ 1,005.00
<br />60.02%
<br />$ 251.00
<br />$ 50.25
<br />16-1600
<br />26A
<br />FD- Exhaust Fans
<br />Material
<br />$ 463.00
<br />$ -
<br />$ -
<br />$ 463.00
<br />$ 463.00
<br />$ 463.00
<br />100.00%
<br />$ -
<br />$ 23.15
<br />16-1600
<br />26A
<br />FD- Exhaust Fans
<br />Labor
<br />$ 950.00
<br />$ -
<br />$ -
<br />$ 950.00
<br />$ 950.00
<br />$ 950.00
<br />100.00%
<br />$ -
<br />$ 47.50
<br />16-1600
<br />26A
<br />FD-VAV's
<br />Material
<br />$ 291.00
<br />$ -
<br />$ -
<br />$ 291.00
<br />$ 291.00
<br />$ 291.00
<br />100.00%
<br />$ -
<br />$ 14.55
<br />16-1600
<br />26A
<br />FD-VAV's
<br />Labor
<br />$ 616.00
<br />$ -
<br />$ -
<br />$ 616.00
<br />$ 616.00
<br />$ 616.00
<br />100.00%
<br />$ -
<br />$ 40.60
<br />16-1600
<br />26A
<br />FD- Boilers
<br />Material
<br />$ 196.00
<br />$ -
<br />$ -
<br />$ 196.00
<br />$ 196.00
<br />$ 196.00
<br />100.00%
<br />$ -
<br />$ 9.60
<br />16-1600
<br />26A
<br />FD- Boilers
<br />Labor
<br />$ 339.00
<br />$ -
<br />$ -
<br />$ 339.00
<br />$ 339.00
<br />$ 339.00
<br />100.00%
<br />$ -
<br />$ 16.95
<br />16-1600
<br />26A
<br />FD-Pumps
<br />Material
<br />$ 754.00
<br />$ -
<br />$ -
<br />$ 754.00
<br />$ 754.00
<br />$ 754.00
<br />100.00%
<br />$ -
<br />$ 37.70
<br />16-1600
<br />26A
<br />FD-Pumps
<br />Labor
<br />$ 2,096.00
<br />$ -
<br />$ -
<br />$ 2,096.00
<br />$ 2,096.00
<br />$ 2,096.00
<br />100.00%
<br />$ -
<br />$ 104.60
<br />16-1600
<br />26A
<br />FD-MAU
<br />Material
<br />$ 219.00
<br />$ -
<br />$ -
<br />$ 219.00
<br />$ 219.00
<br />$ 219.00
<br />100.00%
<br />$ -
<br />$ 10.95
<br />16-1600
<br />26A
<br />FD-MAU
<br />Labor
<br />$ 797.00
<br />$ -
<br />$ -
<br />$ 797.00
<br />$ 797.00
<br />$ 797.00
<br />100.00%
<br />$ -
<br />$ 39.65
<br />16-1600
<br />26A
<br />FD-CU
<br />Material
<br />$ 764.00
<br />$ -
<br />$ -
<br />$ 764.00
<br />$ 764.00
<br />$ 764.00
<br />100.00%
<br />$ -
<br />$ 36.20
<br />16-1600
<br />26A
<br />FD-CU
<br />Labor
<br />$ 1,074.00
<br />$ -
<br />$ -
<br />$ 1,074.00
<br />$ 1,074.00
<br />$ 1,074.00
<br />100.00%
<br />$ -
<br />$ 53.70
<br />16-1600
<br />26A
<br />FD-AHU
<br />Material
<br />$ 174.00
<br />$ -
<br />$ -
<br />$ 174.00
<br />$ 174.00
<br />$ 174.00
<br />100.00%
<br />$ -
<br />$ 6.70
<br />16-1600
<br />26A
<br />FD-AHU
<br />Labor
<br />$ 616.00
<br />$ -
<br />$ -
<br />$ 616.00
<br />$ 616.00
<br />$ 616.00
<br />100.00%
<br />$ -
<br />$ 30.90
<br />16-1600
<br />26A
<br />FD -Steam Generator
<br />Material
<br />$ 669.00
<br />$ -
<br />$ -
<br />$ 669.00
<br />$ 669.00
<br />$ 669.00
<br />100.00%
<br />$ -
<br />$ 33.45
<br />16-1600
<br />26A
<br />FD-Steam Generator
<br />Labor
<br />$ 1,108.00
<br />$ -
<br />$ -
<br />$ 1,108.00
<br />$ 1,108.00
<br />$ 1,108.00
<br />100.00%
<br />$ -
<br />$ 55.40
<br />16-1600
<br />26A
<br />FD- Pressure Washers
<br />Material
<br />$ 244.00
<br />$ -
<br />$ -
<br />$ 244.00
<br />$ 244.00
<br />$ 244.00
<br />100.00%
<br />$ -
<br />$ 12.20
<br />16-1600
<br />26A
<br />FD- Pressure Washers
<br />Labor
<br />$ 666.00
<br />$ -
<br />$ -
<br />$ 666.00
<br />$ 666.00
<br />$ 666.00
<br />100.00%
<br />$ -
<br />$ 34.40
<br />16-1600
<br />26A
<br />FD -Audio Visual Rough-In's
<br />Material
<br />$ 640.00
<br />$ -
<br />$ -
<br />$ 640.00
<br />$ 640.00
<br />$ 640.00
<br />100.00%
<br />$ -
<br />$ 32.00
<br />16-1600
<br />26A
<br />FD -Audio Visual Rough-In's
<br />Labor
<br />$ 1,237.00
<br />$ -
<br />$ -
<br />$ 1,237.00
<br />$ 1,237.00
<br />$ 1,237.00
<br />100.00%
<br />$ -
<br />$ 61.65
<br />16-1600
<br />26A
<br />FD -Security Rough In's
<br />Material
<br />$ 664.00
<br />$ -
<br />$ -
<br />$ 664.00
<br />$ 664.00
<br />$ 664.00
<br />100.00%
<br />$ -
<br />$ 33.20
<br />16-1600
<br />26A
<br />FD -Security Rough In's
<br />Labor
<br />$ 1,900.00
<br />$ -
<br />$ -
<br />$ 1,900.00
<br />$ 1,900.00
<br />$ 1,900.00
<br />100.00%
<br />$ -
<br />$ 95.00
<br />16-1600
<br />26A
<br />FD- Fire Alarm Rough In's
<br />Material
<br />$ 205.00
<br />$ -
<br />$ -
<br />$ 205.00
<br />$ 205.00
<br />$ 205.00
<br />100.00%
<br />$ -
<br />$ 10.25
<br />16-1600
<br />26A
<br />FD- Fire Alarm Rough In's
<br />Labor
<br />$ 1,003.00
<br />$ -
<br />$ -
<br />$ 1,003.00
<br />$ 1,003.00
<br />$ 1,003.00
<br />100.00%
<br />$ -
<br />$ 50.15
<br />16-1600
<br />26A
<br />FD-DATA Rough-In's
<br />Material
<br />$ 377.00
<br />$ -
<br />$ -
<br />$ 377.00
<br />$ 377.00
<br />$ 377.00
<br />100.00%
<br />$ -
<br />$ 16.65
<br />16-1600
<br />26A
<br />FD-DATA Rough-In's
<br />Labor
<br />$ 966.00
<br />$ -
<br />$ -
<br />$ 966.00
<br />$ 966.00
<br />$ 966.00
<br />100.00%
<br />$ -
<br />$ 49.40
<br />16-1600
<br />26A
<br />PD- Demolition
<br />$ 3,916.00
<br />$ -
<br />$ -
<br />$ 3,916.00
<br />$ 3,916.00
<br />$ 3,916.00
<br />100.00%
<br />$ -
<br />$ 195.60
<br />16-1600
<br />26A
<br />PD- Temporary Power/Lights
<br />$ 2,053.00
<br />$ -
<br />$ -
<br />$ 2,053.00
<br />$ 2,053.00
<br />$ 2,053.00
<br />100.00%
<br />$ -
<br />$ 102.65
<br />16-1600
<br />26A
<br />PD-Site Underground
<br />Material
<br />$ 1,743.00
<br />$ -
<br />$ -
<br />$ 1,743.00
<br />$ 1,743.00
<br />$ 1,743.00
<br />100.00%
<br />$ -
<br />$ 67.15
<br />16-1600
<br />26A
<br />PD-Site Underground
<br />Labor
<br />$ 4,718.00
<br />$ -
<br />$ -
<br />$ 4,718.00
<br />$ 4,718.00
<br />$ 4,718.00
<br />100.00%
<br />$ -
<br />$ 235.90
<br />16-1600
<br />26A
<br />PD-Site Pole Base
<br />Material
<br />$ 2,464.00
<br />$ -
<br />$ -
<br />$ 2,464.00
<br />$ 2,464.00
<br />$ 2,464.00
<br />100.00%
<br />$ -
<br />$ 123.20
<br />16-1600
<br />26A
<br />PD-Site Pole Base
<br />Labor
<br />$ 2,177.00
<br />$ -
<br />$ -
<br />$ 2,177.00
<br />$ 2,177.00
<br />$ 2,177.00
<br />100.00%
<br />$ -
<br />$ 106.65
<br />16-1600
<br />26A
<br />PD - Site Set Parking Lot Poles
<br />$ 1,261.00
<br />$ -
<br />$ -
<br />$ 1,261.00
<br />$ 1,261.00
<br />$ 1,261.00
<br />100.0091,
<br />$ -
<br />$ 63.05
<br />16-1600
<br />26A
<br />PD- Switchgear/Panels Install
<br />Material
<br />$ 1,514.00
<br />$ -
<br />$ -
<br />$ 1,514.00
<br />$ 1,514.00
<br />$ 1,514.00
<br />100.00%
<br />$ -
<br />$ 75.70
<br />16-1600
<br />26A
<br />PD- Switchgear/Panels Install
<br />Labor
<br />$ 2,330.00
<br />$ -
<br />$ -
<br />$ 2,330.00
<br />$ 2,330.00
<br />$ 2,330.00
<br />100.00%
<br />$ -
<br />$ 116.50
<br />16-1600
<br />26A
<br />PD- Light Fixture Install
<br />Material
<br />$ 5,897.00
<br />$ -
<br />$ -
<br />$ 5,897.00
<br />$ 5,897.00
<br />$ 5,897.00
<br />100.00%
<br />$ -
<br />$ 294.65
<br />16-1600
<br />26A
<br />PD- Light Fixture Install
<br />Labor
<br />$ 18,365.00
<br />$ -
<br />$ -
<br />$ 18,365.00
<br />$ 18,365.00
<br />$ 18,365.00
<br />100.00%
<br />$ -
<br />$ 916.25
<br />16-1600
<br />26A
<br />PD- Light Fixture Control Install
<br />Material
<br />$ 2,664.00
<br />$ -
<br />$ -
<br />$ 2,664.00
<br />$ 2,664.00
<br />$ 2,664.00
<br />100.00%
<br />$ -
<br />$ 133.20
<br />16-1600
<br />26A
<br />PD- Light Fixture Control Install
<br />Labor
<br />$ 6,322.00
<br />$ -
<br />$ -
<br />$ 6,322.00
<br />$ 6,322.00
<br />$ 6,322.00
<br />100.00%
<br />$ -
<br />$ 316.10
<br />
|