|
Paul Uhlid"
<br />313123
<br />33A
<br />-- Main labor
<br />$ 20,000.00
<br />$ -
<br />$ -
<br />$ 20,000.00
<br />$ 20,000.00
<br />$ 20,000.00
<br />100.00%
<br />$ -
<br />$ l,000.00
<br />Paul Uhlid"
<br />313123
<br />33A
<br />W—Main Material
<br />$ 10,000.00
<br />$ -
<br />$ -
<br />$ 10,000.00
<br />$ lo,000.00
<br />$ 10,000.00
<br />loo.00%
<br />$ -
<br />$ 500.00
<br />Paul Uhlid"
<br />313123
<br />33A
<br />St —Sewer labor
<br />$ 2%000.00
<br />$ -
<br />$ -
<br />$ 29,000.00
<br />$ 29,000.00
<br />$ 29,000.00
<br />100.00%
<br />$ -
<br />$ 1,450.00
<br />Paul Uhlid"
<br />313123
<br />33A
<br />St —Sewer Material
<br />$ 25,000.00
<br />$ -
<br />$ -
<br />$ 25,000.00
<br />$ 25,000.00
<br />$ 25,000.00
<br />100.00%
<br />$ -
<br />$ 1,250.00
<br />Paul Uhlid"
<br />313123
<br />33A
<br />C3#1 PR#10
<br />$ -
<br />$ -
<br />$ 2,800.00
<br />$ 2,900.00
<br />$ 2,900.00
<br />$ 2,900.00
<br />loo.00%
<br />$ -
<br />$ 140.00
<br />Paul Uhlid"
<br />313123
<br />33A
<br />C3#2 PR#13 Storrs Sewer
<br />$ -
<br />$ -
<br />$ 5,560.00
<br />$ 5,560.00
<br />$ 5,560.00
<br />$ 5,560.00
<br />loo.00%$
<br />-
<br />$ 279.00
<br />Paul Uhlid"
<br />313123
<br />33A
<br />C3#3 Add to jet out foam storm line
<br />$ -
<br />$ -
<br />$ 1,650.00
<br />$ 1,650.00
<br />$ 1,650.00
<br />$ 1,650.00
<br />1oo.00%$
<br />-
<br />$ 82.50
<br />Paul Uhlid"
<br />313123
<br />33A
<br />C3#416" WM in Lieu of 8"
<br />$ -
<br />$ -
<br />$ 3,450.00
<br />$ 3,450.00
<br />$ 3,450.00
<br />$ 3,450.00
<br />too. 00%
<br />$ -
<br />$ 172.50
<br />Paul Uhlid"
<br />313123
<br />33A
<br />C3#5 PR#25 Storm Sewer
<br />$ -
<br />$ -
<br />$ 5,175.00
<br />$ 5,175.00
<br />$ 5,175.00
<br />$ 5,175.00
<br />loo.00%$
<br />-
<br />$ 258.75
<br />Paul Uhlid"
<br />313123
<br />33A
<br />C3#6 Vac Trull:
<br />$ -
<br />$ -
<br />$ 1,93-5
<br />$ 1,939.75
<br />$ 1,939.75
<br />$ 1,939.75
<br />1oo.00%
<br />$ -
<br />$ 96.94
<br />Paul Uhlid"
<br />313123
<br />33A
<br />C3#7 Deeper—,Coll-tion
<br />$ -
<br />$ -
<br />$ 3,679.00
<br />$ 3,679.00
<br />$ 3,679.00
<br />$ 3,679.00
<br />100.00%
<br />$ -
<br />$ 183.90
<br />GRAND TOTALS
<br />$ 6,290,219.0 0
<br />$ -
<br />$ 78,765.42
<br />$ 6,368,9W.42
<br />$ 6,014,681.07
<br />$ 271,649.34
<br />$ -
<br />$ 6,286,330.41
<br />1 98.70%
<br />$ 82,654.01
<br />$ 314,316.52
<br />
|