Laserfiche WebLink
Klein Electric <br />16-1600 <br />26A <br />CC#10 ASI#12 <br />$ - <br />$ - <br />$ 1,992.00 <br />$ 1,992.00 <br />$ 1,992.00 <br />$ 1,992.00 <br />Klein Electric <br />16-1600 <br />26A <br />CC#11 PR#15 <br />$ - <br />$ - <br />$ 178.00 <br />$ 179.00 <br />$ 179.00 <br />$ 179.00 <br />Klein Electric <br />16-1600 <br />26A <br />CC#12 RFI#100 <br />$ - <br />$ - <br />$ 527.00 <br />$ 527.00 <br />$ 527.00 <br />$ 527.00 <br />Klein Electric <br />16-1600 <br />26A <br />CC#13 PR#22 <br />$ - <br />$ - <br />$ 3,483.00 <br />$ 3,493.00 <br />$ 3,493.00 <br />$ 3,493.00 <br />Klein Electric <br />16-1600 <br />26A <br />CC#14 PR#18 <br />$ - <br />$ - <br />$ 961.00 <br />$ 961.00 <br />$ 122.00 <br />$ 839.00 <br />$ 961.00 <br />Klein Electric <br />16-1600 <br />26A <br />CC#15 ASI#14R <br />$ - <br />$ - <br />$ 1,702.00 <br />$ 1,702.00 <br />$ 1,702.00 <br />$ 1,702.00 <br />Klein Electric <br />16-1600 <br />26A <br />CC#16 PR#21 <br />$ - <br />$ - <br />$ 122.00 <br />$ 122.00 <br />$ - <br />$ 122.00 <br />$ 122.00 <br />Klein Electric <br />16-1600 <br />26A <br />CC#17 ASI#16 <br />$ - <br />$ - <br />$ 312.00 <br />$ 312.00 <br />$ 312.00 <br />$ 312.00 <br />Klein Electric <br />16-1600 <br />26A <br />CC#18 RFI#132 <br />$ - <br />$ - <br />$ 466.00 <br />$ 466.00 <br />$ 466.00 <br />$ 466.00 <br />Klein Electric <br />16-1600 <br />26A <br />CC#19 PR#23 <br />$ - <br />$ - <br />$ 1,159.00 <br />$ 1,159.00 <br />$ 1,159.00 <br />$ 1,159.00 <br />Klein Electric <br />16-1600 <br />26A <br />CC#20 PR#26 Floor Box/Steam Geneator <br />$ - <br />$ - <br />$ 2,952.00 <br />$ 2,952.00 <br />$ 2,952.00 <br />$ 2,952.00 <br />Klein Electric <br />16-1600 <br />26A <br />CC#21 RFI#142 Added MEP Demo <br />$ - <br />$ - <br />$ 1,080.00 <br />$ 1,080.00 <br />$ 1,080.00 <br />$ 1,080.00 <br />Klein Electric <br />16-1600 <br />26A <br />CC#22 T&M Underground Work at PC <br />$ - <br />$ - <br />$ 1,206.00 <br />$ 1,206.00 <br />$ 1,206.00 <br />$ 1,206.00 <br />Klein Electric <br />16-1600 <br />26A <br />CC#23 RFI#160 Power Di- nnect at PC N Fan <br />$ - <br />$ - <br />$ 283.00 <br />$ 283.00 <br />$ 283.00 <br />$ 283.00 <br />Klein Electric <br />16-1600 <br />26A <br />CC#24 RFI#152 Added Demo&C,binet Demo <br />$ - <br />$ - <br />$ 2,000.00 <br />$ 2,000.00 <br />$ 2,000.00 <br />$ 2,000.00 <br />Klein Electric <br />16-1600 <br />26A <br />CC#25 ASI#15 Update HP-1 Feed Location <br />$ - <br />$ - <br />$ (3JJ.00( <br />$ (3JJ.00( <br />$ (3JJ.00( <br />$ (3JJ.00 <br />Kl ein Electric <br />16-PASS <br />26A <br />CC#26 Replace Lights in Swat Bay 171 <br />$ - <br />$ - <br />$ 3,583.00 <br />$ 3,583.00 <br />$ 2, 08J.00 <br />$ 1,496.00 <br />$ 3593.00 <br />Klein Electric <br />16-1600 <br />26A <br />CC#27 Funnsh & Install 18' light Pole at PC <br />$ - <br />$ - <br />$ 1,990.So <br />$ 1,990.0o <br />1,990.00 <br />$ 1,990.00 <br />Klein Electric <br />16-1600 <br />26A <br />Co#28 PR#29 Relocated Power for Air Compressor <br />$ - <br />$ - <br />$ 2,539.00 <br />$ 2,539.00 <br />. <br />$ 2,539.00 <br />$ 2, 539.00 <br />Klein Electric <br />16-1600 <br />26A <br />CC#29 Add to lnstdI I light in Mail Room 152 <br />$ - <br />$ - <br />$ 53200 <br />$ 53200 <br />$ <br />$ 532.00 <br />$ 532.00 <br />Kl ein Electric <br />16-1600 <br />26A <br />CC#30 PR#19 Electrical& Fire Alarm Changes <br />$ - <br />$ - <br />$ 9,223.00 <br />$ 9,223.00 <br />$ - <br />$ - <br />Klein Electric <br />16-1600 <br />26A <br />CC#31 PR#31 Upsize the SCBA Compressor <br />$ - <br />$ - <br />$ 1,965.00 <br />$ 1,965.00 <br />$ 1,J69.00 <br />$ 196.00 <br />$ 1'965.00 <br />Klein Electric <br />16-1600 <br />26A <br />CC#32 RFI#1881nstall Outlet in Office 106 <br />$ - <br />$ - <br />$ 258.00 <br />$ 258.00 <br />$ 258.00 <br />$ 258.00 <br />Klein Electric <br />16-1600 <br />26A <br />CC#33 RFI#90 Provide Raceway for Gang, Door <br />$ - <br />$ - <br />$ 2,53 0o0 <br />$ 2,536.00 <br />$ 50J.00 <br />$ 2,029.00 <br />$ 2,536.00 <br />New Look <br />31-1000 <br />31A <br />Mobilization <br />$ 2J,400.00 <br />$ - <br />$ - <br />$ 2J,400.00 <br />$ 2J,400.00 <br />$ 2J,400.00 <br />New Look <br />31-1000 <br />31A <br />Locates, PI-L Surveys <br />$ 1J,380.00 <br />$ - <br />$ - <br />$ 1J,380.00 <br />$ 17310.00 <br />$ 1J,380.00 <br />New Look <br />31-1000 <br />31A <br />Erosion Control <br />$ 4,840.00 <br />$ - <br />$ - <br />$ 4, 10.00 <br />$ 4,10.00 <br />$ 4, 10.00 <br />New Look <br />31-1000 <br />31A <br />EC Materials <br />$ 4,000.00 <br />$ - <br />$ - <br />$ 4, 000.00 <br />$ 4, 000.00 <br />$ 4,000.00 <br />New Look <br />31-1000 <br />31A <br />Removals <br />$ 15,J50.00 <br />$ - <br />$ - <br />$ 15,J50.00 <br />$ 15,J50.00 <br />$ 15,J50.00 <br />New Look <br />31-1000 <br />31A <br />Temp Pgg Bare <br />$ 6,350.00 <br />$ - <br />$ - <br />$ 6,350.00 <br />$ 6,350. So <br />$ 6,350.00 <br />New Look <br />31-1000 <br />31A <br />Grading <br />$ 15,980.00 <br />$ - <br />$ - <br />$ 15,980.00 <br />$ 15,990.00 <br />$ 15,980.00 <br />New Look <br />31-1000 <br />31A <br />Sand Import <br />$ 2,332.00 <br />$ - <br />$ - <br />$ 2,33200 <br />$ 2,33200 <br />$ 2,33200 <br />New Look <br />31-1000 <br />31A <br />Soil Correction <br />$ 1J,885.00 <br />$ - <br />$ - <br />$ 1J, 885.00 <br />$ 1J,885.00 <br />$ 17,995.00 <br />New Look <br />31-1000 <br />31A <br />Struchrre Exc <br />$ 39,240.00 <br />$ - <br />$ - <br />$ 39,240.00 <br />$ 39,240.00 <br />$ 39,240.00 <br />New Look <br />31-1000 <br />31A <br />Topsoil <br />$ 14,300.00 <br />$ - <br />$ - <br />$ 14,300.00 <br />$ J,150.00 <br />$ J,150.00 <br />$ 14,300.00 <br />New Look <br />31-1000 <br />31A <br />Fine Grading <br />$ 11,943.00 <br />$ - <br />$ - <br />$ 11,943.00 <br />$ 5,9J2.00 <br />$ 5,9J1.00 <br />$ 11,943.00 <br />New Look <br />31-1000 <br />31A <br />CC#1 PR#2 R Grad e Prep <br />$ - <br />$ - <br />$ 290.J9 <br />$ 290.79 <br />$ 290.79 <br />$ 290.J9 <br />New Look <br />31-1000 <br />31A <br />GO 2 PR.3 <br />$ - <br />$ - <br />$ 4JJ.J9 <br />$ 4JJ.J9 <br />$ 477.79 <br />$ 4JJ.79 <br />New Look <br />31-1000 <br />31A <br />GO 3 ASI1 <br />$ - <br />$ - <br />$ 11,031.51 <br />$ 11,031.51 <br />$ 11,031.51 <br />$ 11,031.51 <br />New Look <br />31-1000 <br />31A <br />CC#4T& M Cass S Entan ces <br />$ - <br />$ - <br />$ 1,345.00 <br />$ 1,345.00 <br />$ 1,345.00 <br />$ 1,345.00 <br />New Look <br />31-1000 <br />31A <br />CC#5 Wellfield Excavation <br />$ - <br />$ - <br />$ 1,092.79 <br />$ 1,082.J9 <br />$ 1, 082.79 <br />$ 1,092.79 <br />New Look <br />31-1000 <br />31A <br />CC#6 Frost Removal <br />$ - <br />$ - <br />$ 1,55200 <br />$ 1,55200 <br />$ 1,55200 <br />$ 1,55200 <br />New Look <br />31-1000 <br />31A <br />CC#J PR#20 <br />$ - <br />$ - <br />$ 3,454.65 <br />$ 3,454.65 <br />$ 3,454.65 <br />$ 3,454.65 <br />New Look <br />31-1000 <br />31A <br />CC#8 Gate Ann Panel <br />$ - <br />$ - <br />$ 3,861.00 <br />$ 3, 861.00 <br />$ 3,861.00 <br />$ 3, 861.00 <br />C5 0000 <br />New Look <br />31-1000 <br />31A <br />C0#9 Add to Fu Mh Quazite Box <br />$ - <br />$ - <br />$ 850.00 <br />$ 850.00 <br />$ 850.00 <br />$ <br />Kel ter Fence <br />32L000 <br />32A <br />Fencing <br />. <br />$ 120,3J5.00 <br />$ - <br />$ (22,247.00) <br />$ 98,128.00 <br />$ 98,121.00 <br />$ 98,128.00 <br />Keller Fence <br />321000 <br />32A <br />CC#1 F&I Stop Go light PR#22 <br />$ <br />1,685.00 <br />$ 1, 685.00 <br />$ 1, 685.00 <br />$ 1,685.00 <br />Keller Fence <br />32A000 <br />32A <br />CC#2 PR#28 Demo&Restore County Fence <br />$ - <br />$ - <br />$ 3,424.00 <br />$ 3,424.00 <br />$ 3,424.00 <br />$ 3,424.00 <br />Keller Fence <br />324000 <br />32A <br />CC#3 Add to Modify PC Opeable Gate Per Owner Request <br />$ - <br />$ - <br />$ A, So <br />$ 8, 83J.00 <br />A—— Ridge <br />32-3291 <br />32B <br />Lands -ping <br />$ 42,990.00 <br />$ - <br />$ 3,673.56 <br />$ 46,653.56 <br />$ 46,653.56 <br />$ 46,653.56 <br />Bi Luminous Roadways <br />32-1216 <br />32C <br />Asphalt <br />$ 144,J40.00 <br />$ - <br />$ - <br />$ 144,J40.00 <br />$ 144,J40.00 <br />$ 144,J40.00 <br />Bituminous Roadways <br />32-1216 <br />32C <br />CC#1ASI1 <br />$ - <br />$ - <br />$ 3,110.00 <br />$ 3,110.00 <br />$ 3,110.00 <br />$ 3,110.00 <br />Bituminous Roadways <br />32-1216 <br />32C <br />CO#2 PR#20 <br />$ - <br />$ - <br />$ 7,650.00 <br />$ J,650.00 <br />$ 7,650.00 <br />$ J, 650.00 <br />Bituminous Roadways <br />32-1216 <br />32C <br />CO#3 Added temp Striping <br />$ - <br />$ - <br />$ J50.00 <br />$ J50.00 <br />$ J50.00 <br />$ J50.00 <br />Bitumi nous Ro adwa, <br />32-1216 <br />32C <br />CO. Add mill&overlay <br />$ - <br />$ - <br />$ 36, 600.00 <br />$ 36,600.00 <br />$ 36,600.00 <br />$ 36,600.00 <br />Bitumin ous Roadways <br />32-1216 <br />32C <br />CO#S Trai l Along Orono Parkway <br />$ - <br />$ - <br />$ J50.00 <br />$ J50.00 <br />$ J50.00 <br />$ 750.00 <br />Bituminous Roadways <br />32-1216 <br />32C <br />CO#6 Add Pavement Striping at PC Operable Gate <br />$ - <br />$ - <br />$ 400.00 <br />$ 400.00 <br />$ 400.00 <br />$ 400.So <br />99.60 <br />8.90 <br />26.35 <br />174.15 <br />48.05 <br />85.10 <br />6.10 <br />15.60 <br />23.30 <br />57.95 <br />142.60 <br />54.00 <br />60.30 <br />14.15 <br />100.00 <br />$ - $ (18.85( <br />9.15 <br />99.50 <br />126.95 <br />26.60 <br />$ 9,223.00 $ - <br />98.25 <br />2.90 <br />- $ 126.80 <br />$ - $ 1,3J0.00 <br />869.00 <br />242.00 <br />200.00 <br />J8J.50 <br />J.50 <br />J 99.00 <br />116.60 <br />894.25 <br />$ - $ 1,962.00 <br />J15.00 <br />597.15 <br />4.54 <br />2.89 <br />551.551 <br />$ $ 6J.25 <br />54.14 <br />J J.60 <br />172.73 <br />193.05 <br />42.50 <br />$ - $ 4,906.40 <br />84.25 <br />171.20 <br />$ 8,837.00 $ - <br />$ - $ 2,332.69 <br />$ - $ 7,237.00 <br />0 <br />38 .50 <br />37.50 <br />$ - $ 1, 830.00 <br />3 J.50 <br />20. So <br />