|
Klein Electric
<br />16-1600
<br />26A
<br />CC#10 ASI#12
<br />$ -
<br />$ -
<br />$ 1,992.00
<br />$ 1,992.00
<br />$ 1,992.00
<br />$ 1,992.00
<br />Klein Electric
<br />16-1600
<br />26A
<br />CC#11 PR#15
<br />$ -
<br />$ -
<br />$ 178.00
<br />$ 179.00
<br />$ 179.00
<br />$ 179.00
<br />Klein Electric
<br />16-1600
<br />26A
<br />CC#12 RFI#100
<br />$ -
<br />$ -
<br />$ 527.00
<br />$ 527.00
<br />$ 527.00
<br />$ 527.00
<br />Klein Electric
<br />16-1600
<br />26A
<br />CC#13 PR#22
<br />$ -
<br />$ -
<br />$ 3,483.00
<br />$ 3,493.00
<br />$ 3,493.00
<br />$ 3,493.00
<br />Klein Electric
<br />16-1600
<br />26A
<br />CC#14 PR#18
<br />$ -
<br />$ -
<br />$ 961.00
<br />$ 961.00
<br />$ 122.00
<br />$ 839.00
<br />$ 961.00
<br />Klein Electric
<br />16-1600
<br />26A
<br />CC#15 ASI#14R
<br />$ -
<br />$ -
<br />$ 1,702.00
<br />$ 1,702.00
<br />$ 1,702.00
<br />$ 1,702.00
<br />Klein Electric
<br />16-1600
<br />26A
<br />CC#16 PR#21
<br />$ -
<br />$ -
<br />$ 122.00
<br />$ 122.00
<br />$ -
<br />$ 122.00
<br />$ 122.00
<br />Klein Electric
<br />16-1600
<br />26A
<br />CC#17 ASI#16
<br />$ -
<br />$ -
<br />$ 312.00
<br />$ 312.00
<br />$ 312.00
<br />$ 312.00
<br />Klein Electric
<br />16-1600
<br />26A
<br />CC#18 RFI#132
<br />$ -
<br />$ -
<br />$ 466.00
<br />$ 466.00
<br />$ 466.00
<br />$ 466.00
<br />Klein Electric
<br />16-1600
<br />26A
<br />CC#19 PR#23
<br />$ -
<br />$ -
<br />$ 1,159.00
<br />$ 1,159.00
<br />$ 1,159.00
<br />$ 1,159.00
<br />Klein Electric
<br />16-1600
<br />26A
<br />CC#20 PR#26 Floor Box/Steam Geneator
<br />$ -
<br />$ -
<br />$ 2,952.00
<br />$ 2,952.00
<br />$ 2,952.00
<br />$ 2,952.00
<br />Klein Electric
<br />16-1600
<br />26A
<br />CC#21 RFI#142 Added MEP Demo
<br />$ -
<br />$ -
<br />$ 1,080.00
<br />$ 1,080.00
<br />$ 1,080.00
<br />$ 1,080.00
<br />Klein Electric
<br />16-1600
<br />26A
<br />CC#22 T&M Underground Work at PC
<br />$ -
<br />$ -
<br />$ 1,206.00
<br />$ 1,206.00
<br />$ 1,206.00
<br />$ 1,206.00
<br />Klein Electric
<br />16-1600
<br />26A
<br />CC#23 RFI#160 Power Di- nnect at PC N Fan
<br />$ -
<br />$ -
<br />$ 283.00
<br />$ 283.00
<br />$ 283.00
<br />$ 283.00
<br />Klein Electric
<br />16-1600
<br />26A
<br />CC#24 RFI#152 Added Demo&C,binet Demo
<br />$ -
<br />$ -
<br />$ 2,000.00
<br />$ 2,000.00
<br />$ 2,000.00
<br />$ 2,000.00
<br />Klein Electric
<br />16-1600
<br />26A
<br />CC#25 ASI#15 Update HP-1 Feed Location
<br />$ -
<br />$ -
<br />$ (3JJ.00(
<br />$ (3JJ.00(
<br />$ (3JJ.00(
<br />$ (3JJ.00
<br />Kl ein Electric
<br />16-PASS
<br />26A
<br />CC#26 Replace Lights in Swat Bay 171
<br />$ -
<br />$ -
<br />$ 3,583.00
<br />$ 3,583.00
<br />$ 2, 08J.00
<br />$ 1,496.00
<br />$ 3593.00
<br />Klein Electric
<br />16-1600
<br />26A
<br />CC#27 Funnsh & Install 18' light Pole at PC
<br />$ -
<br />$ -
<br />$ 1,990.So
<br />$ 1,990.0o
<br />1,990.00
<br />$ 1,990.00
<br />Klein Electric
<br />16-1600
<br />26A
<br />Co#28 PR#29 Relocated Power for Air Compressor
<br />$ -
<br />$ -
<br />$ 2,539.00
<br />$ 2,539.00
<br />.
<br />$ 2,539.00
<br />$ 2, 539.00
<br />Klein Electric
<br />16-1600
<br />26A
<br />CC#29 Add to lnstdI I light in Mail Room 152
<br />$ -
<br />$ -
<br />$ 53200
<br />$ 53200
<br />$
<br />$ 532.00
<br />$ 532.00
<br />Kl ein Electric
<br />16-1600
<br />26A
<br />CC#30 PR#19 Electrical& Fire Alarm Changes
<br />$ -
<br />$ -
<br />$ 9,223.00
<br />$ 9,223.00
<br />$ -
<br />$ -
<br />Klein Electric
<br />16-1600
<br />26A
<br />CC#31 PR#31 Upsize the SCBA Compressor
<br />$ -
<br />$ -
<br />$ 1,965.00
<br />$ 1,965.00
<br />$ 1,J69.00
<br />$ 196.00
<br />$ 1'965.00
<br />Klein Electric
<br />16-1600
<br />26A
<br />CC#32 RFI#1881nstall Outlet in Office 106
<br />$ -
<br />$ -
<br />$ 258.00
<br />$ 258.00
<br />$ 258.00
<br />$ 258.00
<br />Klein Electric
<br />16-1600
<br />26A
<br />CC#33 RFI#90 Provide Raceway for Gang, Door
<br />$ -
<br />$ -
<br />$ 2,53 0o0
<br />$ 2,536.00
<br />$ 50J.00
<br />$ 2,029.00
<br />$ 2,536.00
<br />New Look
<br />31-1000
<br />31A
<br />Mobilization
<br />$ 2J,400.00
<br />$ -
<br />$ -
<br />$ 2J,400.00
<br />$ 2J,400.00
<br />$ 2J,400.00
<br />New Look
<br />31-1000
<br />31A
<br />Locates, PI-L Surveys
<br />$ 1J,380.00
<br />$ -
<br />$ -
<br />$ 1J,380.00
<br />$ 17310.00
<br />$ 1J,380.00
<br />New Look
<br />31-1000
<br />31A
<br />Erosion Control
<br />$ 4,840.00
<br />$ -
<br />$ -
<br />$ 4, 10.00
<br />$ 4,10.00
<br />$ 4, 10.00
<br />New Look
<br />31-1000
<br />31A
<br />EC Materials
<br />$ 4,000.00
<br />$ -
<br />$ -
<br />$ 4, 000.00
<br />$ 4, 000.00
<br />$ 4,000.00
<br />New Look
<br />31-1000
<br />31A
<br />Removals
<br />$ 15,J50.00
<br />$ -
<br />$ -
<br />$ 15,J50.00
<br />$ 15,J50.00
<br />$ 15,J50.00
<br />New Look
<br />31-1000
<br />31A
<br />Temp Pgg Bare
<br />$ 6,350.00
<br />$ -
<br />$ -
<br />$ 6,350.00
<br />$ 6,350. So
<br />$ 6,350.00
<br />New Look
<br />31-1000
<br />31A
<br />Grading
<br />$ 15,980.00
<br />$ -
<br />$ -
<br />$ 15,980.00
<br />$ 15,990.00
<br />$ 15,980.00
<br />New Look
<br />31-1000
<br />31A
<br />Sand Import
<br />$ 2,332.00
<br />$ -
<br />$ -
<br />$ 2,33200
<br />$ 2,33200
<br />$ 2,33200
<br />New Look
<br />31-1000
<br />31A
<br />Soil Correction
<br />$ 1J,885.00
<br />$ -
<br />$ -
<br />$ 1J, 885.00
<br />$ 1J,885.00
<br />$ 17,995.00
<br />New Look
<br />31-1000
<br />31A
<br />Struchrre Exc
<br />$ 39,240.00
<br />$ -
<br />$ -
<br />$ 39,240.00
<br />$ 39,240.00
<br />$ 39,240.00
<br />New Look
<br />31-1000
<br />31A
<br />Topsoil
<br />$ 14,300.00
<br />$ -
<br />$ -
<br />$ 14,300.00
<br />$ J,150.00
<br />$ J,150.00
<br />$ 14,300.00
<br />New Look
<br />31-1000
<br />31A
<br />Fine Grading
<br />$ 11,943.00
<br />$ -
<br />$ -
<br />$ 11,943.00
<br />$ 5,9J2.00
<br />$ 5,9J1.00
<br />$ 11,943.00
<br />New Look
<br />31-1000
<br />31A
<br />CC#1 PR#2 R Grad e Prep
<br />$ -
<br />$ -
<br />$ 290.J9
<br />$ 290.79
<br />$ 290.79
<br />$ 290.J9
<br />New Look
<br />31-1000
<br />31A
<br />GO 2 PR.3
<br />$ -
<br />$ -
<br />$ 4JJ.J9
<br />$ 4JJ.J9
<br />$ 477.79
<br />$ 4JJ.79
<br />New Look
<br />31-1000
<br />31A
<br />GO 3 ASI1
<br />$ -
<br />$ -
<br />$ 11,031.51
<br />$ 11,031.51
<br />$ 11,031.51
<br />$ 11,031.51
<br />New Look
<br />31-1000
<br />31A
<br />CC#4T& M Cass S Entan ces
<br />$ -
<br />$ -
<br />$ 1,345.00
<br />$ 1,345.00
<br />$ 1,345.00
<br />$ 1,345.00
<br />New Look
<br />31-1000
<br />31A
<br />CC#5 Wellfield Excavation
<br />$ -
<br />$ -
<br />$ 1,092.79
<br />$ 1,082.J9
<br />$ 1, 082.79
<br />$ 1,092.79
<br />New Look
<br />31-1000
<br />31A
<br />CC#6 Frost Removal
<br />$ -
<br />$ -
<br />$ 1,55200
<br />$ 1,55200
<br />$ 1,55200
<br />$ 1,55200
<br />New Look
<br />31-1000
<br />31A
<br />CC#J PR#20
<br />$ -
<br />$ -
<br />$ 3,454.65
<br />$ 3,454.65
<br />$ 3,454.65
<br />$ 3,454.65
<br />New Look
<br />31-1000
<br />31A
<br />CC#8 Gate Ann Panel
<br />$ -
<br />$ -
<br />$ 3,861.00
<br />$ 3, 861.00
<br />$ 3,861.00
<br />$ 3, 861.00
<br />C5 0000
<br />New Look
<br />31-1000
<br />31A
<br />C0#9 Add to Fu Mh Quazite Box
<br />$ -
<br />$ -
<br />$ 850.00
<br />$ 850.00
<br />$ 850.00
<br />$
<br />Kel ter Fence
<br />32L000
<br />32A
<br />Fencing
<br />.
<br />$ 120,3J5.00
<br />$ -
<br />$ (22,247.00)
<br />$ 98,128.00
<br />$ 98,121.00
<br />$ 98,128.00
<br />Keller Fence
<br />321000
<br />32A
<br />CC#1 F&I Stop Go light PR#22
<br />$
<br />1,685.00
<br />$ 1, 685.00
<br />$ 1, 685.00
<br />$ 1,685.00
<br />Keller Fence
<br />32A000
<br />32A
<br />CC#2 PR#28 Demo&Restore County Fence
<br />$ -
<br />$ -
<br />$ 3,424.00
<br />$ 3,424.00
<br />$ 3,424.00
<br />$ 3,424.00
<br />Keller Fence
<br />324000
<br />32A
<br />CC#3 Add to Modify PC Opeable Gate Per Owner Request
<br />$ -
<br />$ -
<br />$ A, So
<br />$ 8, 83J.00
<br />A—— Ridge
<br />32-3291
<br />32B
<br />Lands -ping
<br />$ 42,990.00
<br />$ -
<br />$ 3,673.56
<br />$ 46,653.56
<br />$ 46,653.56
<br />$ 46,653.56
<br />Bi Luminous Roadways
<br />32-1216
<br />32C
<br />Asphalt
<br />$ 144,J40.00
<br />$ -
<br />$ -
<br />$ 144,J40.00
<br />$ 144,J40.00
<br />$ 144,J40.00
<br />Bituminous Roadways
<br />32-1216
<br />32C
<br />CC#1ASI1
<br />$ -
<br />$ -
<br />$ 3,110.00
<br />$ 3,110.00
<br />$ 3,110.00
<br />$ 3,110.00
<br />Bituminous Roadways
<br />32-1216
<br />32C
<br />CO#2 PR#20
<br />$ -
<br />$ -
<br />$ 7,650.00
<br />$ J,650.00
<br />$ 7,650.00
<br />$ J, 650.00
<br />Bituminous Roadways
<br />32-1216
<br />32C
<br />CO#3 Added temp Striping
<br />$ -
<br />$ -
<br />$ J50.00
<br />$ J50.00
<br />$ J50.00
<br />$ J50.00
<br />Bitumi nous Ro adwa,
<br />32-1216
<br />32C
<br />CO. Add mill&overlay
<br />$ -
<br />$ -
<br />$ 36, 600.00
<br />$ 36,600.00
<br />$ 36,600.00
<br />$ 36,600.00
<br />Bitumin ous Roadways
<br />32-1216
<br />32C
<br />CO#S Trai l Along Orono Parkway
<br />$ -
<br />$ -
<br />$ J50.00
<br />$ J50.00
<br />$ J50.00
<br />$ 750.00
<br />Bituminous Roadways
<br />32-1216
<br />32C
<br />CO#6 Add Pavement Striping at PC Operable Gate
<br />$ -
<br />$ -
<br />$ 400.00
<br />$ 400.00
<br />$ 400.00
<br />$ 400.So
<br />99.60
<br />8.90
<br />26.35
<br />174.15
<br />48.05
<br />85.10
<br />6.10
<br />15.60
<br />23.30
<br />57.95
<br />142.60
<br />54.00
<br />60.30
<br />14.15
<br />100.00
<br />$ - $ (18.85(
<br />9.15
<br />99.50
<br />126.95
<br />26.60
<br />$ 9,223.00 $ -
<br />98.25
<br />2.90
<br />- $ 126.80
<br />$ - $ 1,3J0.00
<br />869.00
<br />242.00
<br />200.00
<br />J8J.50
<br />J.50
<br />J 99.00
<br />116.60
<br />894.25
<br />$ - $ 1,962.00
<br />J15.00
<br />597.15
<br />4.54
<br />2.89
<br />551.551
<br />$ $ 6J.25
<br />54.14
<br />J J.60
<br />172.73
<br />193.05
<br />42.50
<br />$ - $ 4,906.40
<br />84.25
<br />171.20
<br />$ 8,837.00 $ -
<br />$ - $ 2,332.69
<br />$ - $ 7,237.00
<br />0
<br />38 .50
<br />37.50
<br />$ - $ 1, 830.00
<br />3 J.50
<br />20. So
<br />
|