My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
5.3 ERMUSR 12-12-2021
ElkRiver
>
City Government
>
Boards and Commissions
>
Utilities Commission
>
Packets
>
2014-2024
>
2021
>
12-12-2021
>
5.3 ERMUSR 12-12-2021
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/13/2021 3:36:02 PM
Creation date
12/13/2021 3:36:02 PM
Metadata
Fields
Template:
City Government
type
ERMUSR
date
12/12/2021
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
53
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
MORATORIUM EFFECTIVE FEBRUARY 14 7017 ON THE FOLLOWING LOAD CONTROL PROGRAMS <br /> Energy Management Program Rates <br /> ERMU shall provide: <br /> 1. All electric energy consumed by the ETS water heater at$0.048604€3 per kWh. <br /> 2. This equipment will be energized only for 8 off-peak hours daily. <br /> 3. A meter to measure electricity consumed by the ETS water heater. <br /> 4. A load control device and meter socket to accommodate the off-peak meter. <br /> Rate is subject to application of Power Cost Adjustment (PCA). <br /> Federal, state, and local taxes may apply. <br /> Adopted December 148,20210 <br /> Effective January 1, 20221 <br /> Page 3 of 3 <br /> 120 <br />
The URL can be used to link to this page
Your browser does not support the video tag.