My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
5.3 ERMUSR 12-12-2021
ElkRiver
>
City Government
>
Boards and Commissions
>
Utilities Commission
>
Packets
>
2014-2024
>
2021
>
12-12-2021
>
5.3 ERMUSR 12-12-2021
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/13/2021 3:36:02 PM
Creation date
12/13/2021 3:36:02 PM
Metadata
Fields
Template:
City Government
type
ERMUSR
date
12/12/2021
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
53
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Elk River ---- <br /> Municipal Utilities <br /> MORATORIUM EFFECTIVE FEBRUARY 14, 2017 ON THE FOLLOWING LOAD CONTROL PROGRAMS <br /> ENERGY MANAGEMENT PROGRAM RATES <br /> Available: Within Elk River Municipal Utilities (ERMU) established service territory. <br /> Applicable:To single family residences, non-demand and demand customers receiving service under <br /> another rate, who add a second meter for any of the following controlled loads: <br /> Dual Fuel Space Heating Rate: This Program is available to residential customers only. A dual fuel space <br /> heating system consists of an electric heating system and a secondary non-electric space heating system <br /> both capable of heating the living space at design conditions. Interruptions of the electric heating <br /> system will usually occur for up to 12 hours daily on peak winter days and a maximum of 400 hours per <br /> heating season. <br /> To qualify for the special rate, the customer shall provide: <br /> 1. An electric space heating system which can be interrupted by a single 5 amp rated relay. <br /> 2. A secondary non-electric space heating system capable of automatic start-up and continuous <br /> operation upon interruption of the electric heating system. <br /> 3. Obtain a load control device furnished by ERMU. <br /> 4. Accommodations for a meter and load control device and associated wiring installed according <br /> to the applicable electrical codes, and installed by a qualified electrician. <br /> 5. Inspection by a State certified electrical inspector and a representative of ERMU. <br /> 6. Radiant heat in the slab of the building qualifies for dual fuel, not electric thermal storage. <br /> 7. Dual Fuel is not allowed in garages, pole sheds, or any structure that does not confirm to the <br /> residential building code. <br /> 8. Exceptions by management approval only. <br /> ERMU shall provide: <br /> 1. All electric energy consumed by the primary electric heating system at $0.06320602 per kWh. I <br /> 2. During peak load conditions, ERMU will turn customer controlled electrical heat off for extended <br /> periods of time as stated above. <br /> 3. A meter to measure electricity consumed by the electric heating system. <br /> 4. A load control device and meter socket to accommodate the meter. <br /> Rate is subject to application of Power Cost Adjustment (PCA). <br /> Federal, state and local taxes may apply. <br /> Page 1 of 3 <br /> 118 <br />
The URL can be used to link to this page
Your browser does not support the video tag.