Laserfiche WebLink
Elk River -�--- <br /> Municipal Utilities <br /> TRANSMISSION TRANSFORMED SERVICE RATE <br /> Available: Within Elk River Municipal Utilities (ERMU) established service territory. <br /> Applicable:Available for new non-residential Customer accounts with projected demand greater than or <br /> equal to 10 MW. The Customer must maintain an annual load factor greater than or equal to 75%. A <br /> Customer account with a monthly billing demand of less than 10 MW for 12 consecutive months or an <br /> annual load factor less than 75% may be switched to another electric rate schedule (additional charges <br /> may apply to recover stranded costs). The Customer owned equipment must be in compliance with all <br /> policies, procedures, safety requirements, and applicable electrical codes. <br /> Character of Service: 3-Phase Transmission Transformed 7,200/12,470-volt, AC, 60 cycles. <br /> Special Conditions:The Customer must execute a contract with the utility that commits to a minimum <br /> term of service, identifies the annual peak demand and load factor, agrees to the requirements for <br /> registering generation with Midcontinent Independent System Operator(MISO) if applicable, and <br /> accepts the certain risks that include fluctuating market-based rates and prices established by MISO. <br /> The Customer must connect directly to the Utility's distribution substation(s) and provide the location <br /> suitable for the installation of the utility owned transformer(s) and metering equipment on the <br /> Customer's property. Customer will be responsible for providing suitable wire and connection in the <br /> utility owned metering equipment. The metering equipment shall be installed to service one class of <br /> business. If additional buildings are required for a given business, they shall be interconnected by the <br /> customer to maintain one metered account, unless an exception is approved by management. If <br /> additional meters and services are requested by the customer, each shall be treated as a separate <br /> customer and billed individually. <br /> ERMU equipment and metering must be accessible to ERMU 24 hours per day. <br /> Transmission Demand Charge: <br /> Transmission Demand charges are determined by monthly maximum metered 15-minute Customer <br /> demand, adjusted for applicable MISO zone transmission losses. All applicable MISO transmission <br /> charges, including but not limited to the below, shall apply to all transmission demand quantities: <br /> A. Schedule 1 <br /> B. Schedule 2 <br /> C. Schedule 9 <br /> D. Schedule 26 <br /> Page 1 of 3 <br /> 107 <br />