My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
5.3 ERMUSR 12-12-2021
ElkRiver
>
City Government
>
Boards and Commissions
>
Utilities Commission
>
Packets
>
2014-2024
>
2021
>
12-12-2021
>
5.3 ERMUSR 12-12-2021
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/13/2021 3:36:02 PM
Creation date
12/13/2021 3:36:02 PM
Metadata
Fields
Template:
City Government
type
ERMUSR
date
12/12/2021
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
53
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Large Industrial Demand Electric Service Rate <br /> Determination of Billing Demand:The billing demand shall be the highest measured demand (corrected <br /> for power factor if required) during any fifteen (15) minute period occurring in the current billing period. <br /> Fluctuating Loads: Customers operating equipment having a highly fluctuating or large instantaneous <br /> demand, such as welders and X-ray machines, shall be required to pay all non-betterment costs of <br /> isolating the load from the balance of ERMU's system so that the load will not unduly interfere with <br /> service on ERMU's lines. No motor larger than ten (10) HP (or 7.355 kW) will be allowed to be across- <br /> the-line started without notification and written authorization from ERMU. <br /> Power Factor Adjustment: Power factor adjustments may be made in the billing demand, when the <br /> power factor, as determined by test, at the time of the Customer's maximum use is less than 9895%. If <br /> the power factor, as measured by ERMU's electric department, is lower than 9895%,the monthly <br /> demand charge may be multiplied by the ratio 98-94 divided by the measured power factor, or at <br /> ERMU's option, the power factor may be corrected at the Customer's expense. <br /> Billing and Terms of Payment: See ERMU Service Policies Policy(Billing Due Dates, and Penalties and <br /> Delinquent Notices.) <br /> Terms and Conditions: <br /> 1. Usage may be fractionalized on the actual days of service for application of a change in rate. <br /> 2. Service will be furnished pursuant to ERMU's rules. <br /> 3. Extensions made for service under this schedule are subject to the provisions of ERMU's rules <br /> governing Extension of Service and Facilities. <br /> 4. The rates set forth herein may be modified by the amount of any governmental changes <br /> imposed and levied on transmission,distribution, production, or the sale of electrical power. <br /> 5. Exceptions by management approval only. <br /> Adopted December 148, 20210 <br /> Effective January 1, 20221 <br /> Page 2 of 2 <br /> 106 <br />
The URL can be used to link to this page
Your browser does not support the video tag.