My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
8.3 SR 10-18-2021
ElkRiver
>
City Government
>
City Council
>
Council Agenda Packets
>
2021 - 2030
>
2021
>
10-18-2021
>
8.3 SR 10-18-2021
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/15/2021 11:00:36 AM
Creation date
10/15/2021 10:59:15 AM
Metadata
Fields
Template:
City Government
type
SR
date
10/18/2021
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Mr. Zachary Carlton, Planning Manager <br />October 11, 2021 <br />Page 3 <br />Upon preliminary review from City staff, the Preliminary Plat will be submitted to the City for review <br />and approval and accompanied by the other necessary documents. <br />Deliverables: HAI will provide a hard copy and electronic copy (.pdf format) of the Preliminary Plat. <br />The Preliminary Plat will be included as a submittal item. <br />Estimated Cost: $4,800 <br />PRELIMINARY ENGINEERING SERVICES <br />HAI will prepare the preliminary engineering documents required for the preliminary plat application. <br />Specifically, we will prepare a preliminary grading plan, a preliminary street plan, and a preliminary <br />utility plan. We will provide constructiondetails such as preliminary pavement typical section, <br />preliminary stormwater details, storm sewer details, pedestrian access routes, etc. <br />We will also prepare a preliminary hydrologic stormwater model and determine the size and proposed <br />grading or locations of necessary stormwater BMPs. Our stormwater design will include determining <br />pre-project vs.post-projectrunoff rates for the 2-year, 10-year,and 100-year design storms as required <br />by the City of Elk River. We will also consider the volume control requirements of the jurisdictional <br />agencies and propose stormwater BMPs as appropriate. Our stormwater design will be summarized in <br />a Preliminary Stormwater Management Plan and will be submitted to the City as a submittal item. <br />Additionally, we will prepare a preliminary Turn Lane layoutfor the intersection of Business Center <br />Drive and Waco Street NW. <br />Deliverables: Our deliverables will bePreliminary Civil Construction Plans consisting of: Title Sheet, <br />Details, Preliminary Grading Plan, Preliminary Street Plan, Preliminary Utility Plan, Preliminary Turn <br />Lane Plan, and Preliminary Stormwater Management Plan. <br />Estimated Cost: $5,000 <br />WETLAND DELINEATION <br />HAI will field delineate the wetlandsand collect the points sothat the boundary can be accurately <br />depicted on the Preliminary Plat and Construction Plans. Wewill prepare a Wetland Delineation Report <br />and submit it to the LGU for review and approval. HAI will attend the Technical Evaluation Panel <br />meeting for concurrence of the wetland boundary and type. We assume that any review fees will be <br />paid by the Cityor may be paid by HAI as a reimbursable expense at an additional cost. <br />Deliverables: Wetland Delineation Report prepared by a certified wetland delineator. <br />Estimated Cost: $2,200 <br />
The URL can be used to link to this page
Your browser does not support the video tag.