Laserfiche WebLink
Wastewater & <br />Sewer Service <br />The City of Elk River owns and operates its sanitary sewer <br />collection and wastewater treatment system. This system <br />includes approximately 81 miles of sewer lines and 21 lift <br />stations that transport sewage to the treatment plant that <br />is located near the intersection of US Highways 10 and 169. <br />Evaluate the Potential Impact <br />of the Urban Service Expansion <br />Areas on Wastewater Services <br />Recognizing the important linkage between commu- <br />nity growth and the capacity to handle wastewater, the <br />city completed a Wastewater Treatment Facility Plan in <br />February 2013. This plan evaluated capacity of existing <br />facilities and the ability to reliably achieve regulatory <br />standards for wastewater discharge. The 2013 plan led to <br />the construction of a new plant in 2017, doubling the city's <br />treatment capacity from approximately 2.2 million gallons <br />per day (mgd) to 4.5 mgd. Currently, the plant is treating <br />1.35 mgd. The city's investment in upgrading treatment <br />capacity was based on estimates of 2035 daily flow and <br />projected areas of development. With further projected <br />expansion of the Urban Service Area, ongoing evaluation <br />of the projected daily flow will be necessary in order to <br />identify whether future expansion of the wastewater treat- <br />ment plant is needed. <br />The Wastewater S Sewer Service map highlights the areas <br />of the city for future wastewater service both within and <br />outside the current Urban Service Area as identified in the <br />Wastewater Treatment Facility Plan. In addition to these <br />areas, the map also highlights areas identified for waste- <br />water service expansion that will be included in the future <br />Urban Service Area, these are lands surrounding the Ranch <br />Road Corridor, the Twin Lakes Road corridor, and segments <br />of the Gravel Mining Area anticipated to be available for <br />development in the next 15 years. <br />Proposed Urban Service <br />Area Extensions <br />Future Development Areas <br />within Wastewater <br />Treatment Facility Plan U.S.A. <br />Future Development Areas <br />outside Wastewater <br />Treatment Facility Plan U.S.A. <br />While there appears to be sufficient capacity at the <br />treatment plant, wastewater services could potentially <br />be constrained by capacity of the pipeline system that <br />conveys wastewater to the plant. For instance, the city has <br />identified capacity concerns in the conveyance system in <br />northeastern Elk River. As that part of Elk River grows, the <br />collection system will likely need to be expanded in order <br />to meet the wastewater service demands. Similar studies <br />should be conducted for new growth areas so that the <br />collection system can be managed and maintained. <br />Elk River Comprehensive Plan • Infrastructure <br />07CL\arri]C1C11: WV IMAW] 01WO <br />99 <br />