Laserfiche WebLink
(d)Pressuretesting results for leachate transmission pipes; <br />(e)Narrative description of all as-built variances from the plans and/or <br />specifications; <br />(f)As-built cross-sections of the liner subgrade; <br />(g)As-built elevations for all pipe inlets and outlets and pump- <br />on/pump-off controls; <br />(h)Completed manufacturer warranties; <br />(i)All physical testing results for soils and other materials usedin the <br />construction <br />ERL must prepare detailed record drawings/documents of recirculation <br />drainfield construction, which are certified by an engineer. The drawings will <br />include survey measurements of the drainfield areas to document position within <br />the cell, suitable base contours and piping elevations. All construction must be <br />fully documented. <br />(10)Barrier Layer Construction Notification.Licensee shall notify the City at <br />least two (2) days in advance of liner barrier layer installation or final cover <br />barrier layer installation. Licensee shall assist the City in arranging inspection of <br />the site at any reasonable time the City requests. The Licensee shall keep the City <br />informed of ongoing construction progress and shall specifically notify the City of <br />significant changes encountered in the geological, hydrological, or construction <br />conditions. The City may reasonably require work, which is covered or otherwise <br />obscured prior to City inspection, to be re-excavated for City inspection. <br />(11)Temporary Fencing-On Site Litter Control. Litter control fences shall be <br />maintained around the working area(s) of the landfill to prevent the blowing of <br />paper or other litter on or off site. The Licensee shall assign employees to engage <br />in a regular and routine program to inspect the Landfill Site and clean up areas <br />where litter accumulates on the Landfill Site. <br />(12)Permanent Fencing. Licensee shall maintain a minimum six-foot high <br />fence around the perimeter of the Landfill property to address reasonable <br />concerns regarding public safety,trespassing or uncontrolled dumping. <br />(13)Sanitary Facilities. Adequate sanitary facilities and shelter shall be <br />provided for site personnel. <br />(14)Electrical Service. Adequate electrical service shall be provided at the site <br />for operations and repairs. <br />11 <br /> <br />