My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
05-13-2008 ERMU MIN
ElkRiver
>
City Government
>
Boards and Commissions
>
Utilities Commission
>
Minutes
>
2000-2009
>
2008
>
05-13-2008 ERMU MIN
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/16/2021 2:53:20 PM
Creation date
9/16/2021 2:53:20 PM
Metadata
Fields
Template:
City Government
type
ERMUMIN
date
5/13/2008
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page 2 <br /> Regular meeting of the Elk River Municipal Utilities Commission <br /> May 13,2008 <br /> David Berg reported hydrant repairs are in progress. Some of the hydrants were too low and <br /> needed to be raised. The Well#9 project is still in progress. The summer help is currently flushing <br /> hydrants. Almost all of the irrigation meters are installed and the 4th Street water main project is <br /> nearing completion. <br /> Troy Adams reported 14 security sales for the month of April. Underground locates have <br /> increased dramatically. Staff is preparing for the territory acquisition next week and will follow-up <br /> with meter upgrades. John Dietz questioned if the customers received any notification. Staff <br /> responded Connexus informs them and we send them a reminder along with our rates and special <br /> programs. <br /> 5.2 Review Country Crossings Water Consumption <br /> At the April 2008 Elk River Municipal Utilities Commission meeting,Jerry Olsen, <br /> representing Country Crossings Homeowners Association,expressed his concerns about the high <br /> cost of lawn sprinkling. He asked if someone from the utilities could attend their annual <br /> association meeting on April 28,2008. Jerry Gumphrey and Bryan Adams attended the meeting <br /> along with about 30 association members. They were showed a power point presentation on Elk <br /> River Water Resources along with some water conservation measures. Their past history and <br /> usage were reviewed. <br /> 5.3 Review Transmission Facilities Assignment Agreement <br /> At the April 2008 Elk River Municipal Utilities Commission meeting,authorization was given <br /> to execute the Transmission Facility Assignment Agreement contingent upon approval of <br /> Connexus and Great River Energy. Jerry Takle and Bryan Adams talked with both Connexus and <br /> Great River Energy about this agreement. They indicated there was no conflict of interest nor does <br /> it create a hardship or undesired consequences. Great River Energy was very encouraged that we <br /> are taking advantage of this opportunity. An executed copy of the agreement along with <br /> explanation of operational control was reviewed.In the definition portion of this agreement,the <br /> definition"City"will reflect Elk River Municipal Utilities. <br /> 5.4 Review Power Point on Energy Issues <br /> Bryan Adams showed a power point on energy issues and reducing usage. Statistics and <br /> comparisons of major countries were addressed. The United States is currently utilizing 25%of <br /> the world's oil. As China grows along with other countries,this percentage will be changing and <br /> availability and cost will become major issues. <br /> 5.5 Review Possible Incentives to Encourage ACH Payments <br /> Theresa Slominski conducted an informal survey of other utilities of similar size and larger <br /> and asked them what they did to offer ACH incentives to encourage customer participation. <br /> Strategies and viewpoints were discussed. Elk River Municipal Utilities ACH applications are on <br />
The URL can be used to link to this page
Your browser does not support the video tag.