My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
08-14-2007 ERMU MIN
ElkRiver
>
City Government
>
Boards and Commissions
>
Utilities Commission
>
Minutes
>
2000-2009
>
2007
>
08-14-2007 ERMU MIN
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/13/2021 2:02:23 PM
Creation date
9/13/2021 2:02:11 PM
Metadata
Fields
Template:
City Government
type
ERMUMIN
date
8/14/2007
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page 4 <br />Regular meeting of the Elk River Municipal Utilities Commission <br />August 14, 2007 <br />Jerry Gumphrey moved to award the Well #9 Earthwork to Kober Excavating, Inc. James <br />Tralle seconded the motion. Motion carried 3-0. <br />6.5 Review Proposed Wholesale Electric Rate Structure <br />Great River Energy's proposed 2008 rate structure was reviewed. ERMU is looking at a <br />possible 8.5% rate increase for 2008. GRE is looking into implementing a time of use rate <br />and critical peak pricing. James Tralle asked if the billing and metering system could handle <br />the time of use rate structure. Theresa replied it is possible but there would be programming <br />fees involved. James Tralle suggested educating students at an early age on the importance of <br />conservation. <br />Other Business <br />There was no other business. <br />The next regularly scheduled meeting of the Elk River Municipal Utilities Commission <br />will be Tuesday, September 11, 2007. <br />President Jerry Takle adjourned the regular meeting of the Elk River Municipal Utilities <br />Commission at 5:20 p.m. <br />��espectfull ubmitted, <br />Judy Mc padde <br />Recording Clerk <br />
The URL can be used to link to this page
Your browser does not support the video tag.