My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
08-14-2007 ERMU MIN
ElkRiver
>
City Government
>
Boards and Commissions
>
Utilities Commission
>
Minutes
>
2000-2009
>
2007
>
08-14-2007 ERMU MIN
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/13/2021 2:02:23 PM
Creation date
9/13/2021 2:02:11 PM
Metadata
Fields
Template:
City Government
type
ERMUMIN
date
8/14/2007
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page 3 <br />Regular meeting of the Elk River Municipal Utilities Commission <br />August 14, 2007 <br />hiking trail (old railroad bed). Bids were received August 6, 2007, staff recommends <br />awarding to Midwest Diversified Utilities, the lowest responsive bidder. <br />James Tralle moved to award Midwest Diversified Utilities, the Area 21 electric distribution <br />rebuild. Jerry Gumphrey seconded the motion. Motion carried 3-0. <br />6.2 Review 2008 Budget Schedule <br />Staff has started the process of assembling the year 2008 budget. The proposed schedule <br />for the budgeting process was reviewed. Discussion followed regarding the travel and training <br />budget, personnel projections, and CIP spending requirements for the future. Travel and <br />training budget reflects a $5200 increase from 2007. No additional personnel is requested for <br />2008. Legislative changes enacted in 2007 will drastically affect the CIP programs starting in <br />2010. Jerry Gumphrey suggested getting a group together to come up with some new ideas <br />for rebates. Jerry Takle's suggestion was a rebate for customers if their electric usage is lower <br />than previous year. James Tralle questioned if fees for on-line classes on conservation would <br />be considered for rebates, and the possibility of supplying water heater blankets to customers. <br />6.3 Review DNR Water Appropriations <br />The DNR regulates the annual amount and rate of which we can utilize ground water for <br />our municipal water system. In April of this year we requested an increase in ground water <br />appropriations from 875 million gallons to 1400 million gallons per year. In 2006 we <br />submitted a revised Water Conservation and Emergency Management plan in anticipation of <br />future water appropriation requests. <br />In July of 2007 the DNR responded to our request with approval of the Conservation and <br />Emergency Management Plan, and amended our Water Appropriation Permit for a 10 year <br />period to 1650 million gallons per year. They are pre -approving the addition of five 1000 <br />gpm wells. The stipulations on the water appropriation are to continue with the Emergency <br />and Conservation Plan, and have an observation well. We will be utilizing the Twin Lakes <br />Elementary irrigation well for this. Staff remains hopeful of the positive outcome with ISD <br />9728 use of irrigation wells. <br />6.4 Review Bid Tabulation for Well #9 Site Work <br />The 2007 water budget contained a $400,000 item to construct Well 99. Due to changes <br />because of water quality issues, the cost has escalated to the $650,000 range. All of the <br />necessary approvals have been secured for the Twin Lakes location. Location, construction <br />schedule, and costs were discussed at previous meetings. <br />Bids for the earthwork portion of this project were received on August 9, 2007. A bid <br />tabulation was reviewed with staff recommending award of this project to the lowest <br />responsive bidder, Kober Excavating, Inc. <br />
The URL can be used to link to this page
Your browser does not support the video tag.