My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
4.3 SR 09-07-2021
ElkRiver
>
City Government
>
City Council
>
Council Agenda Packets
>
2021 - 2030
>
2021
>
09-07-2021
>
4.3 SR 09-07-2021
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/2/2021 11:53:54 AM
Creation date
9/2/2021 7:40:31 AM
Metadata
Fields
Template:
City Government
type
SR
date
9/7/2021
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SCHEDULE OF UNIT PRICES CHANGE ORDER 2 <br />2021 STREET IMPROVEMENTS PROJECT <br />CITY OF ELK RIVER, MN <br />R13.121582 <br />SAP 204-104-008, SAP 204-118-001, SAP 204-132-005, SAP 204-133-006, SAP 204-136-001, SAP 204-144-001, SAP 204-146-001, SAP 204-156-001 <br />CONTRACTOR agrees to perform all of the work described in the CONTRACT DOCUMENTS for the following unit prices <br />NOTE: PRICES include sales tax and all applicable taxes and fees. <br />CY (LV) = Cubic Yards, Loose Volume <br />CY (CV) = Cubic Yards, Compacted Volume (Measured in Place) <br />(P)=Planned Quantity Basis of Measurement <br />ITEM <br />MNDOT <br />APPROX. <br />UNIT <br />NO. <br />SPEC NO. <br />ITEM <br />QUANT. <br />UNIT <br />PRICE <br />AMOUNT <br />CO-2.2.13 <br />2563.601 <br />TRAFFIC CONTROL <br />1.0 <br />LUMPSUM <br />$1,515.91 <br />$1,515.91 <br />CO-2.2.14 <br />2574.507 <br />COMMON TOPSOIL BORROW (LV) <br />200 <br />CU YD <br />$37.45 <br />$7,490.00 <br />CO-2.2.15 <br />2574.508 <br />FERTILIZER TYPE <br />75 <br />POUND <br />$1.00 <br />$75.00 <br />CO-2.2.16 <br />2575.505 <br />SEEDING <br />0.2 <br />ACRE <br />$871.88 <br />$174.38 <br />CO-2.2.17 <br />2575.508 <br />SEED MIXTURE 25-151 <br />15 <br />POUND <br />$7.72 <br />$115.80 <br />CO-2.2.18 <br />2575.508 <br />HYDRALUIC BONDED FIBER MATRIX <br />400 <br />POUND <br />$1.67 <br />$668.00 <br />CO-2.2.19 <br />2582.503 <br />4" SOLID LINE MULTI-COMPONENET (WHITE) <br />2,210 <br />LIN FT <br />$0.27 <br />$596.70 <br />CO-2.2.20 <br />2582.503 <br />4" SOLID LINE MULTI-COMPONENET (YELLOW) <br />2,090 <br />LIN FT <br />$0.27 <br />$564.30 <br />CO-2.2.21 <br />2582.503 <br />4" BROKEN LINE MULTI-COMPONENT(YELLOW) <br />450 <br />LIN FT <br />$0.27 <br />$121.50 <br />CO-2.2.22 <br />2582.503 <br />4" DOUBLE SOLID LINE MULTI -COMPONENT (YELLOW) <br />300 <br />LIN FT <br />$0.54 <br />$162.00 <br />CO-2.2.23 <br />2582.518 <br />PAVEMENT MESSAGE MULTI -COMPONENT <br />150 <br />SO, FT <br />$6.28 <br />$942.00 <br />CO-2.1 SUBTOTAL <br />$ <br />$144,236.64 <br />TOTAL BID (CO-2.1 + CO-2.2): <br />$ <br />$322,158.92 <br />EJCDC@ C 410, Bid Form for Construction Contract. <br />Copyright© 2018 National Society of Professional Engineers, American Council of Engineering Companies, <br />and American Society of Civil Engineers. All rights reserved. <br />Pages 6-8 <br />
The URL can be used to link to this page
Your browser does not support the video tag.