My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
4.3 SR 09-07-2021
ElkRiver
>
City Government
>
City Council
>
Council Agenda Packets
>
2021 - 2030
>
2021
>
09-07-2021
>
4.3 SR 09-07-2021
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/2/2021 11:53:54 AM
Creation date
9/2/2021 7:40:31 AM
Metadata
Fields
Template:
City Government
type
SR
date
9/7/2021
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SCHEDULE OF UNIT PRICES CHANGE ORDER 2 <br />2021 STREET IMPROVEMENTS PROJECT <br />CITY OF ELK RIVER, MN <br />R13.121582 <br />SAP 204-104-008, SAP 204-118-001, SAP 204-132-005, SAP 204-133-006, SAP 204-136-001, SAP 204-144-001, SAP 204-146-001, SAP 204-156-001 <br />CONTRACTOR agrees to perform all of the work described in the CONTRACT DOCUMENTS for the following unit prices: <br />NOTE: PRICES include sales tax and all applicable taxes and fees. <br />CY (LV) = Cubic Yards, Loose Volume <br />CY (CV) = Cubic Yards, Compacted Volume (Measured in Place) <br />(P)=Planned Quantity Basis of Measurement <br />ITEM MNDOT APPROX. UNIT <br />NO. SPEC NO. ITEM QUANT. UNIT PRICE AMOUNT <br />CO-2.1 LIONS PARK TRAIL IMPROVEMENTS <br />CO-2.1.1 <br />2021.501 <br />MOBILIZATION <br />CO-2.1.2 <br />2105.504 <br />GEOTEXTILE FABRIC TYPE 5 <br />CO-2.1.3 <br />2105.507 <br />COMMON EXCAVATION (P) (EV) <br />CO-2.1.4 <br />2105.607 <br />SALVAGED AGGREGATE FROM STOCKPILE (CV) <br />CO-2.1.5 <br />2215.504 <br />FULL DEPTH RECLAMATION (8") <br />CO-2.1.6 <br />2360.509 <br />TYPE SP 9.5 WEARING COURSE MIXTURE (2,C) <br />CO-2.1.7 <br />2563.601 <br />TRAFFIC CONTROL <br />CO-2.1.8 <br />2573.502 <br />STORM DRAIN INLET PROTECTION <br />CO-2.1.9 <br />2573.503 <br />SILT FENCE, TYPE MS <br />CO-2.1.10 <br />2574.507 <br />COMMON TOPSOIL BORROW (LV) <br />CO-2.1.11 <br />2574.508 <br />FERTILIZER TYPE 3 <br />CO-2.1.12 <br />2575.505 <br />SEEDING <br />CO-2.1.13 <br />2575.508 <br />SEED MIXTURE 25-151 <br />CO-2.1.14 <br />2575.508 <br />HYDRALUIC BONDED FIBER MATRIX <br />CO-2.2 FREEPORT STREET IMPROVEMENTS <br />CO-2.2.1 2021.501 MOBILIZATION <br />CO-2.2.2 <br />2104.503 <br />REMOVE CURB & GUTTER <br />CO-2.2.3 <br />2104.518 <br />REMOVE CONCRETE PAVEMENT <br />CO-2.2.4 <br />2104.602 <br />RELOCATE SPRINKLER SYSTEM (PER HEAD) <br />CO-2.2.5 <br />2231.604 <br />BITUMINOUS PATCH SPECIAL (STREET) <br />CO-2.2.6 <br />2232.504 <br />MILL BITUMINOUS SURFACE (1.5") <br />CO-2.2.7 <br />2360.509 <br />TYPE SP 9.5 WEARING COURSE MIXTURE (2,C) <br />CO-2.2.8 <br />2521.518 <br />4" CONCRETE WALK <br />CO-2.2.9 <br />2521.518 <br />7" CONCRETE WALK <br />CO-2.2.10 <br />2531.503 <br />CONCRETE CURB & GUTTER DESIGN B618 <br />CO-2.2.11 <br />2531.618 <br />7" CONCRETE VALLEY GUTTER <br />CO-2.2.12 <br />2531.618 <br />TRUNCATED DOMES <br />1 <br />LUMPSUM <br />$57,098.70 <br />$57,098.70 <br />2,835 <br />SQYD <br />$3.95 <br />$11,198.25 <br />630 <br />CU YD <br />$15.41 <br />$9,708.30 <br />630 <br />CU YD <br />$19.35 <br />$12,190.50 <br />5,000 <br />SQ YD <br />$4.21 <br />$21,050.00 <br />735 <br />TON <br />$58.58 <br />$43,056.30 <br />1 <br />LUMPSUM <br />$974.52 <br />$974.52 <br />6.0 <br />EACH <br />$101.65 <br />$609.90 <br />2,675 <br />LIN FT <br />$3.74 <br />$10,004.50 <br />160 <br />CU YD <br />$53.25 <br />$8,520.00 <br />120 <br />POUND <br />$1.00 <br />$120.00 <br />0.4 <br />ACRE <br />$871.88 <br />$348.75 <br />48 <br />POUND <br />$7.72 <br />$370.56 <br />1,600 <br />POUND <br />$1.67 <br />$2,672.00 <br />CO-2.1 SUBTOTAL <br />$ <br />$177,922.28 <br />1 <br />LUMPSUM <br />$33,154.00 <br />$33,154.00 <br />670 <br />LIN FT <br />$7.05 <br />$4,723.50 <br />2,000 <br />SQ FT <br />$1.05 <br />$2,100.00 <br />5 <br />EACH <br />$53.50 <br />$267.50 <br />35 <br />SQYD <br />$32.81 <br />$1,148.35 <br />7,680 <br />SQYD <br />$1.25 <br />$9,600.00 <br />680 <br />TON <br />$58.58 <br />$39,834.40 <br />1,530 <br />SQ FT <br />$5.89 <br />$9,011.70 <br />480 <br />SQ FT <br />$7.49 <br />$3,595.20 <br />670 <br />LIN FT <br />$27.82 <br />$18,639.40 <br />300 <br />SQ FT <br />$7.49 <br />$2,247.00 <br />70 <br />SQ FT <br />$107.00 <br />$7,490.00 <br />EJCDC@ C 410, Bid Form for Construction Contract. <br />Copyright© 2018 National Society of Professional Engineers, American Council of Engineering Companies, <br />and American Society of Civil Engineers. All rights reserved. <br />Pages 6-8 <br />
The URL can be used to link to this page
Your browser does not support the video tag.