Laserfiche WebLink
<br />SECTION 3. CONSTRUCTION TIMETABLE <br /> <br />Rite Cable shall construct all areas of the initial <br />service area which contain dwelling units within fifteen <br />months of the granting of the State Certificate of Confirma- <br />tion. Delays in construc~ion shall result in penalties <br />provided by the franchis~. <br /> <br />SECTION 4. CONSTRUCTION STANDARDS' <br /> <br />Rite Cable shall comply with all construction standards <br />of the franchise as well as all applicable laws, ordinances, <br />rules, regulations and codes, federal, state and local. <br /> <br />SECTION 5. CONDITIONS ON USE <br /> <br />Rite Cable shall not, in its construction of the System, <br />interfere with any gas, electric or television fixture, <br />water hydrant or main, or sewer line. Section 5 also pro- <br />vides procedures for the raising and lowering of lines, <br />trimming of trees, and- the recognition of potential <br />liability for persons damaging Rite Cable capabilities. <br /> <br />ARTICLE VI. SYSTEM OPERATIONS <br /> <br />SECTION 1. INFORMATION AVAILABILITY <br /> <br />City shall have the right of reasohable access to Rite <br />Cable's records. <br /> <br />SECTION 2. SERVICE CONTRACT <br /> <br />If Rite Cable maintains a service contract with sub- <br />scribers, the form of said contract is detailed in Section <br />2. <br /> <br />SECTION 3. SUBSCRIBER PRACTICES <br /> <br />There shall be no charge for disconnection of any <br />installation, service, or outlet. Section 3 also details <br />Rite Cable's right to disconnect for failure to pay the <br />monthly subscriber fees. <br /> <br />SECTION 4. FRANCHISE FEES, RATES, CHARGES, CHANGES IN FEES <br />AND PROCEDURES <br /> <br />Throughout the term of the franchise, Rite Cable shall <br />pay to City an annual fee of 3% of all gross revenues. The <br />rates provided in the franchise shall be guaranteed for 2 <br />years after the franchise is certified by the Board or until <br /> <br />- 5 - <br />