My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
5.1. PCSR 08-24-2021
ElkRiver
>
City Government
>
Boards and Commissions
>
Planning Commission
>
Planning Packets
>
2021-2030
>
2021
>
08-24-2021
>
5.1. PCSR 08-24-2021
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/27/2021 10:16:43 AM
Creation date
8/20/2021 9:23:13 AM
Metadata
Fields
Template:
City Government
type
PCSR
date
8/24/2021
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
177
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
R <br /> t <br /> 1-1 — Light Industrial District AR —Agricultural Research Overlay Zoning Districts <br /> This district is intended to serve as a District <br /> transition between more industrial uses SWF— Solid Waste Facility <br /> and other business uses.These areas are This district is intended to preserve and <br /> maintain the use of land for agricultural Overlay District <br /> intended for industrial uses that are clean, research. The purpose of this overlay district is <br /> quiet,and free of hazardous elements and <br /> nuisances. to protect the public health,safety,and <br /> CRT— Commercial Reserve general welfare by providing specific land <br /> area for the establishment and operation <br /> 1-2 — Medium Industrial District Transitional District of solid waste facilities. <br /> This district is intended to accommodate This district is intended to allow existing <br /> more intense manufacturing uses that uses to remain conforming until redevel- ME—Mineral Excavation Overlay <br /> may generate nominal off-site impacts. opment aligns with the Comprehensive <br /> Plan,at which time the City will consider District <br /> changing the zoning designation. The purpose of this district is to protect <br /> 1-3 — General Industrial District the public health,safety,and general <br /> This district is intended for industrialwelfare by establishing specific land for <br /> development not requiring municipal M U-ERP— Mixed Use Elk River mineral excavation operations and related <br /> sewer and water.These industries are Plaza District facilities. <br /> meant to be compatible with surrounding The purpose of this district is to codify the <br /> landuses. planned unit development into a single AT—Antenna Town Overlay <br /> zoning district with three subsections: <br /> commercial,single-family,and multi- District <br /> BP— Business Park District family. This overlay district is intended to accom- <br /> This district is intended to encourage modate the telecommunication needs of <br /> a planned,integrated environment for residents and businesses by providing a <br /> certain industrial,office,and commercial Focus Area Study (FAST) specific district for the establishment and <br /> uses,which are compatible and comple- This district is intended to establish the operation of wireless telecommunication <br /> mentary to each other and surrounding land use,architectural,and bulk regula- towers. <br /> uses. tions of the 900 acre area included in the <br /> district from the 171st Focused Area Study. <br /> PUD — Planned Unit <br /> Development District <br /> The purpose of this district is to provide <br /> opportunities for design flexibility and <br /> creative development.PUDs are developed <br /> in accordance with a concept plan and <br /> development plan and must be consistent <br /> with the City Comprehensive Plan. <br /> 20 Community Context Elk River Comprehensive Plan <br /> DRAFT FOR REVIEW ONLY <br />
The URL can be used to link to this page
Your browser does not support the video tag.