My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
4.1. PCSR 07-27-2021
ElkRiver
>
City Government
>
Boards and Commissions
>
Planning Commission
>
Planning Packets
>
2021-2030
>
2021
>
07-27-2021
>
4.1. PCSR 07-27-2021
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/23/2021 9:43:29 AM
Creation date
7/23/2021 8:34:10 AM
Metadata
Fields
Template:
City Government
type
PCSR
date
7/27/2021
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
20
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
8. Approval of an updated landscape plan <br /> 9. Adjacent homes shall not be the same color. <br /> 10. Provide a trail connection from the end of the private cul-de-sac to the trail along the west side of <br /> Twin Lakes Road or to the development to the north. <br /> 11. No more than two of the same facade design/details shall be adjacent to one another. <br /> 12. Mailboxes shall be clustered and located on the private street. <br /> 13. Construct a sidewalk from the south side of the entrance to Tall Pines PUD second addition to <br /> the south side of this project area. <br /> Recommend,by motion, approval of the Preliminary Plat of Tall Pines Third Addition P.U.D <br /> 1. Council approval of the related Zone Change (ZC 21-03) and Conditional Use Permit (CU 21-08). <br /> Background/Discussion <br /> The applicant,Roger Derrick with the Tall Pines 2,LLC,is proposing to develop 2.5 acres along Line <br /> Ave with 14 residential townhomes. The project will be similar to the previous two Tall Pines <br /> subdivisions, also developed by Roger Derrick, south along 183Td Circle, and immediately to the north of <br /> this site. The Planning Commission and City Council both reviewed a concept for this project earlier in <br /> the year and generally supported the proposed townhome project. The property is currently zoned <br /> Business Park (BP), and a zone change to support the proposed Planned Unit Development is required. <br /> Comprehensive Plan <br /> The Comprehensive Plan guides this area as Mixed Use which allows a mixture of housing, jobs and/or <br /> retail services uses within close proximity to each other. The area also provides another setting for high <br /> density residential land uses. The proposed use and rezoning to a residential PUD is supported by the <br /> comprehensive plan. <br /> Site Plan <br /> The 14 townhome lots are laid out along a single private street with access from the west to Line Ave. <br /> Each home will have driveway access to the private street, and no additional access points to public <br /> rights-of-way are proposed. The street design meets townhome standards for a private drive,but the city <br /> will verify the fire department access. <br /> There is an existing wetland in the center of the project area. The applicant submitted an application to <br /> the city,which includes reviews from the state,to fill the wetland. Approval of that permit is included as a <br /> condition of approval for this project. <br /> The existing drainage pond east of the site will be utilized for stormwater management. City ordinances <br /> also require a 45-foot minimum setback for structures around wet stormwater ponds to facilitate water <br /> quality best management practices. <br /> Engineering and Utilities <br /> Properties are graded to direct runoff to the private streets,which collect stormwater via catch basins, and <br /> to the rear of the property. Stormwater collected in the streets is directed to the proposed stormwater <br /> pond. All homes will be served by city sewer and water. <br />
The URL can be used to link to this page
Your browser does not support the video tag.