My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
6.1. & 6.2. SR 08-15-2005
ElkRiver
>
City Government
>
City Council
>
Council Agenda Packets
>
2000 - 2010
>
2005
>
08/15/2005
>
6.1. & 6.2. SR 08-15-2005
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/21/2008 8:35:23 AM
Creation date
8/12/2005 10:45:17 AM
Metadata
Fields
Template:
City Government
type
SR
date
8/15/2005
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
79
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> <br />13065 Orono Parkway <br />Elk River, MN 55330 <br /> <br />July 21, 2005 <br /> <br />File: 226-077P <br /> <br />Mr. Scott Harlicker, Senior Planner <br />City of Elk River <br />13065 Orono Parkway <br />Elk River :MN 55330 <br /> <br />RE: PINEWOOD ESTATES SECOND ADDITION <br /> <br />Dear Mr. Harlicker: <br /> <br />As requested, we have reviewed the revised submittal for the proposed Pinewood Estates <br />Second Addition. The submittal was prepared by Pioneer Engineering and consisted of a <br />preliminary plat, existing conditions, preliminary site plan, preliminary grading and erosion <br />control plan, and storm sewer calculations. The plan set had a revision date of July 13, 2005. <br />Based on our review, comments received at the staff review meeting, and meeting with the <br />developer's engineer, we would offer the following comments: <br /> <br />1. This proposal is to redevelop the Pinewood Golf Course into 54 residential lots. The <br />newly created lots are proposed to be served by City sanitary sewer and water services. <br />The proposed new development will surround the existing Pinewood Addition, which <br />contains 23 residential lots with on-site sanitary sewer and water facilities. <br /> <br />2. Sanitary sewer and water facilities will be provided by extending them down Waco Street <br />to the realigned entrance into 182nd Avenue and the proposed new entrance of Street C. <br />It is our understanding that the sanitary sewer will be constructed deep enough to <br />provide sewer service to the 23 existing lots sometime in the future. Generally, all of the <br />watermain will be looped; a portion of it will be looped along existing Yankton Street <br />and 182nd Avenue. <br /> <br />3. The storm sewer system will consist of a storm sewer pipe system in the streets draining <br />to a pond to be constructed in the location of the existing club house adjacent to Waco <br />Street. We have not fully completed review of the drainage calculations, however, the <br />proposed concept is to limit the discharge from the pond in a 100-year event to less than <br />one cubic foot per second. In general, this concept is acceptable for the development of <br />this area. <br /> <br />Phone: 763.635.1000 <br />Fax: 763.635.1090 <br /> <br />www.cLelk-river.mn.us <br />
The URL can be used to link to this page
Your browser does not support the video tag.