My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
6.1. PCSR 06-22-2021
ElkRiver
>
City Government
>
Boards and Commissions
>
Planning Commission
>
Planning Packets
>
2021-2030
>
2021
>
06-22-2021
>
6.1. PCSR 06-22-2021
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/18/2021 7:58:47 AM
Creation date
6/18/2021 7:42:57 AM
Metadata
Fields
Template:
City Government
type
PCSR
date
6/22/2021
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
60
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
7. Replace 12” CMP with 12” RCP across Business Center Dr. <br />8. Stormwater management needs to meet NPDES and city stormwater ordinance. <br />9. Filtration basin 2 would be city owned and requires access for maintenance. Other basins <br />will be privately owned and maintained. <br />10. Ensure all EOF elevations are correct. Basin 1 appears to be a typo. <br />11. Freeboards between EOFs and low floors must be at minimum 1 foot. <br />12. Add catch basins just outside of private street entrance to gather storm water for treatment <br />on site. <br />13. Grades must be less than or equal to 3:1. <br />14. Wetland delineation approved in 2020 and shown on site plan. Road extension on north <br />shown as wetland impacts. Wetland impacts have not yet been applied for or reviewed <br />by the TEP via Wetland Conservation Act (WCA) requirement. All structures must <br />meet the 45’ wetland setback and this area should be within a D&U easement (at least first <br />25’ setback). Currently only wetland boundary is within D&U. Stormwater ponds may not be <br />located within delineated wetlands. <br />15. There are two dead end watermains shown in the utility plan: one in the parking lot circle <br />and another in the cul-de-sac; no dead-end mains shall be constructed, all watermains shall <br />be looped. <br /> <br />If we need additional information, we will let you know. <br /> <br />Let me know if you have any questions. <br /> <br />Sincerely, <br /> Zack Carlton, Planning Manager <br />Ph: 763.635.1035 <br />zcarlton@ElkRiverMN.gov
The URL can be used to link to this page
Your browser does not support the video tag.