Laserfiche WebLink
Terra Terra Project Number2U7U5 <br />Elk R <br />Elk River Fire Station to <br />CONSTRUCTION City of Elk River <br />CONTINUATION SHEET AIA DOCUMENT G703 <br />AIA Document G702, APPLICATION AND CERTIFICATION FOR PAYMENT, containing APPLICATION NO: 4 <br />Contractor's signed certification is attached. APPLICATION DATE: 5/31/21 <br />In tabulations below, amounts are stated to the nearest dollar. PERIOD TO: 5/31/21 <br />Use Column I on Contracts where variable retainage for line items may apply. <br />A <br />A.1 <br />B <br />C <br />CA <br />C.2 <br />C.3 <br />D E <br />F <br />G <br />H <br />I <br />SUBCONTRACTOR <br />ITEM <br />BID <br />DESCRIPTION OF WORK <br />SCHEDULED <br />CHANGE <br />BUDGET <br />REVISED <br />WORKCOMPLETED <br />MATERIALS <br />TOTAL <br />% <br />BALANCE <br />RETAINAGE <br />VENDOR <br />NO. <br />PACK <br />VALUE <br />ORDERS <br />REVISION / <br />SCHEDULED <br />FROM PREVIOUS <br />THIS PERIOD <br />PRESENTLY <br />COMPLETED <br />(G +C) <br />TO FINISH <br />(IF VARIABLE <br />EMPLOYEE <br />NO. <br />CONTINGENCY <br />VALUE <br />APPLICATION <br />STORED <br />AND STORED <br />(C -G) <br />RATE) <br />COST <br />TRANSFER <br />(D+E) <br />(NOT IN <br />TO DATE <br />CODE <br />D OR E) <br />(D+E+F) <br />Century Construction <br />06-6100 <br />6A <br />Install In Wall Blocking <br />$ 8,000.00 <br />$ - <br />$ - <br />$ 8,000.00 <br />$ - <br />$ - <br />0.00% <br />$ 8,000.00 <br />$ - <br />Century Construction <br />06-6100 <br />6A <br />Cabinets and Millwork <br />$ 8,500.00 <br />$ - <br />$ - <br />$ 8,500.00 <br />$ - <br />$ - <br />0.00% <br />$ 8,500.00 <br />$ <br />Century Construction <br />06-6100 <br />6A <br />Specialties <br />$ 32,000.00 <br />$ - <br />$ - <br />$ 32,000.00 <br />$ - <br />$ - <br />0.00% <br />$ 32,000.00 <br />$ - <br />Century Construction <br />06-6100 <br />6A <br />Temp Enclosures <br />$ 6,000.00 <br />$ - <br />$ - <br />$ 6,000.00 <br />$ - <br />$ - <br />0.00% <br />$ 6,000.00 <br />$ - <br />Century Construction <br />06-6100 <br />6A <br />Doors & Hardware <br />$ 17,000.00 <br />$ - <br />$ - <br />$ 17,000.00 <br />$ - <br />$ - <br />0.00% <br />$ 17,000.00 <br />$ - <br />Northern Woodwork <br />06-6400 <br />6B <br />Architectural Millwork <br />$ 45,900.00 <br />$ - <br />$ - <br />$ 45,900.00 <br />$ - <br />$ - <br />0.00% <br />$ 45,900.00 <br />$ - <br />Herzog Coatings <br />07-7210 <br />7C <br />Fluid Applied Air Barrier <br />$ 38,600.00 <br />$ - <br />$ - <br />$ 38,600.00 <br />$ - <br />$ - <br />0.00% <br />$ 38,600.00 <br />$ - <br />Horizon Roofing <br />07-7520 <br />7A & 7B <br />Roofing& Metal Wall Panels <br />$ 385,124.00 <br />$ - <br />$ - <br />$ 385,124.00 <br />$ - <br />$ - <br />0.00% <br />$ 385,124.00 <br />$ - <br />Sunrise Speciality <br />07-7900 <br />7D <br />Joint Sealants <br />$ 45,470.00 <br />$ - <br />$ - <br />$ 45,470.00 <br />$ - <br />$ - <br />0.00% <br />$ 45,470.00 <br />$ - <br />Sunrise Speciality <br />07-7900 <br />7D <br />CO#1 PR#2R Clerestory Head Detail <br />$ - <br />$ - <br />$ 35.00 <br />$ 35.00 <br />$ - <br />$ - <br />0.00% <br />$ 35.00 <br />$ - <br />Mid -Central Door <br />08-6200 <br />SA <br />Doors & Frames <br />$ 41,875.33 <br />$ - <br />$ - <br />$ 41,875.33 <br />$ - <br />$ - <br />0.00% <br />$ 41,875.33 <br />$ - <br />Mid -Central Door <br />08-6200 <br />SA <br />Wood Doors <br />$ 7,727.00 <br />$ - <br />$ - <br />$ 7,727.00 <br />$ - <br />$ - <br />0.00% <br />$ 7,727.00 <br />$ - <br />Mid -Central Door <br />08-6200 <br />SA <br />Stainless Steel Doors & Frames <br />$ 3,133.00 <br />$ - <br />$ - <br />$ 3,133.00 <br />$ - <br />$ - <br />0.00% <br />$ 3,133.00 <br />$ - <br />Mid -Central Door <br />08-6200 <br />SA <br />Hardware <br />$ 41,653.67 <br />$ - <br />$ - <br />$ 41,653.67 <br />$ - <br />$ - <br />0.00% <br />$ 41,653.67 <br />$ - <br />American Door Works <br />08-6361 <br />SB <br />Sectional Overhead Doors <br />$ 170,570.00 <br />$ - <br />$ - <br />$ 170,570.00 <br />$ - <br />$ - <br />0.00% <br />$ 170,570.00 <br />$ - <br />American Door Works <br />08-6361 <br />SB <br />CO#1 PR#2 Overhead Doors & Circuiting <br />$ - <br />$ - <br />$ (37,217.00) <br />$ (37,217.00) <br />$ - <br />$ - <br />0.00% <br />$ (37,217.00) <br />$ - <br />Hallmark Glass <br />08-8800 <br />SC <br />Glass & Glazing <br />$ 163,500.00 <br />$ - <br />$ - <br />$ 163,500.00 <br />$ - <br />$ - <br />0.00% <br />$ 163,500.00 <br />$ - <br />Niemela Design and Construction <br />09-9250 <br />9A <br />Framing - Material <br />$ 19,873.00 <br />$ - <br />$ - <br />$ 19,873.00 <br />$ 19,873.00 <br />$ 19,873.00 <br />100.00% <br />$ - <br />$ 993.65 <br />Niemela Design and Construction <br />09-9250 <br />9A <br />Insulation - Material <br />$ 5,063.00 <br />$ - <br />$ - <br />$ 5,063.00 <br />$ 2,000.00 <br />$ 2,000.00 <br />39.50% <br />$ 3,063.00 <br />$ 100.00 <br />Niemela Design and Construction <br />09-9250 <br />9A <br />Drywall - Material <br />$ 20,024.00 <br />$ - <br />$ - <br />$ 20,024.00 <br />$ - <br />$ - <br />0.00% <br />$ 20,024.00 <br />$ - <br />NiemelaDes ignand Construction <br />09-9250 <br />9A <br />Taping/Finishing- Material <br />$ 2,930.00 <br />$ - <br />$ - <br />$ 2,930.00 <br />$ - <br />$ - <br />0.00% <br />$ 2,930.00 <br />$ - <br />NiemelaDesignandConstruction <br />09-9250 <br />9A <br />Sealants/Acoustical - Material <br />$ 2,500.00 <br />$ - <br />$ - <br />$ 2,500.00 <br />$ - <br />$ - <br />0.00% <br />$ 2,500.00 <br />$ - <br />NiemelaDesignandConstruction <br />09-9250 <br />9A <br />FRP- Material <br />$ 606.00 <br />$ - <br />$ - <br />$ 606.00 <br />$ - <br />$ - <br />0.00% <br />$ 606.00 <br />$ - <br />Niemela Design and Construction <br />09-9250 <br />9A <br />Framing- Labor <br />$ 33,795.00 <br />$ - <br />$ - <br />$ 33,795.00 <br />$ - <br />$ - <br />0.00% <br />$ 33,795.00 <br />$ - <br />Niemela Design and Construction <br />09-9250 <br />9A <br />Insulation - Labor <br />$ 6,500.00 <br />$ - <br />$ - <br />$ 6,500.00 <br />$ - <br />$ - <br />0.00% <br />$ 6,500.00 <br />$ - <br />NiemelaDesignandConstruction <br />09-9250 <br />9A <br />Drywall - Labor <br />$ 22,810.00 <br />$ - <br />$ - <br />$ 22,810.00 <br />$ - <br />$ - <br />0.00% <br />$ 22,810.00 <br />$ - <br />NiemelaDesignandConstruction <br />09-9250 <br />9A <br />Taping/Finishing - Labor <br />$ 23,301.00 <br />$ - <br />$ - <br />$ 23,301.00 <br />$ - <br />$ - <br />0.00% <br />$ 23,301.00 <br />$ - <br />NiemelaDesignandConstruction <br />09-9250 <br />9A <br />Sealants/Acoustical - Labor <br />$ 3,000.00 <br />$ - <br />$ - <br />$ 3,000.00 <br />$ - <br />$ - <br />0.00% <br />$ 3,000.00 <br />$ - <br />Niemela Design and Construction <br />09-9250 <br />9A <br />FRP - Labor <br />$ 630.00 <br />$ - <br />$ - <br />$ 630.00 <br />$ - <br />$ - <br />0.00% <br />$ 630.00 <br />$ - <br />NiemelaDesignandConstruction <br />09-9250 <br />9A <br />Equipment - Lift <br />$ 7,500.00 <br />$ - <br />$ - <br />$ 7,500.00 <br />$ - <br />$ - <br />0.00% <br />$ 7,500.00 <br />$ - <br />Niemela Design and Construction <br />09-9250 <br />9A <br />Mobilization <br />$ 5,000.00 <br />$ - <br />$ - <br />$ 5,000.00 <br />$ - <br />$ - <br />0.00% <br />$ 5,000.00 <br />$ - <br />Niemela Design and Construction <br />09-9250 <br />9A <br />Bonding <br />$ 2,915.00 <br />$ - <br />$ - <br />$ 2,915.00 <br />$ - <br />$ - <br />0.00% <br />$ 2,915.00 <br />$ - <br />Niemela Design and Construction <br />09-9250 <br />9A <br />Allowance (Terra Directed) <br />$ 5,000.00 <br />$ - <br />$ - <br />$ 5,000.00 <br />$ - <br />$ - <br />0.00% <br />$ 5,000.00 <br />$ - <br />Niemela Design and Construction <br />09-9250 <br />9A <br />Allowance -Access Panels <br />$ 2,000.00 <br />$ - <br />$ - <br />$ 2,000.00 <br />$ - <br />$ - <br />0.00% <br />$ 2,000.00 <br />$ - <br />Niemela Design and Construction <br />09-9250 <br />9A <br />CO#1 PR#2R Clerestory Head Detail <br />$ - <br />$ - <br />$ 4,963.35 <br />$ 4,963.35 <br />$ - <br />$ - <br />0.00% <br />$ 4,963.35 <br />$ - <br />Niemela Design and Construction <br />09-9250 <br />9A <br />CO#2 PR#3R <br />$ - <br />$ - <br />$ (357.00) <br />$ (357.00) <br />$ - <br />$ - <br />0.00% <br />$ (357.00) <br />$ - <br />Tim's Construction Group <br />09-9300 <br />9B <br />Labor <br />$ 23,450.00 <br />$ - <br />$ - <br />$ 23,450.00 <br />$ - <br />$ - <br />0.00% <br />$ 23,450.00 <br />$ - <br />Page 2/6 <br />