Laserfiche WebLink
Terra Terra Project Number2U7U5 <br />Elk R <br />Elk River Fire Station to <br />CONSTRUCTION City of Elk River <br />CONTINUATION SHEET AIA DOCUMENT G703 <br />AIA Document G702, APPLICATION AND CERTIFICATION FOR PAYMENT, containing APPLICATION NO: 4 <br />Contractor's signed certification is attached. APPLICATION DATE: 5/31/21 <br />In tabulations below, amounts are stated to the nearest dollar. PERIOD TO: 5/31/21 <br />Use Column I on Contracts where variable retainage for line items may apply. <br />A <br />A.1 <br />B <br />C <br />CA <br />C.2 <br />C.3 <br />D E <br />F <br />G <br />H <br />I <br />SUBCONTRACTOR <br />ITEM <br />BID <br />DESCRIPTION OF WORK <br />SCHEDULED <br />CHANGE <br />BUDGET <br />REVISED <br />WORKCOMPLETED <br />MATERIALS <br />TOTAL <br />% <br />BALANCE <br />RETAINAGE <br />VENDOR <br />NO. <br />PACK <br />VALUE <br />ORDERS <br />REVISION / <br />SCHEDULED <br />FROM PREVIOUS <br />THIS PERIOD <br />PRESENTLY <br />COMPLETED <br />(G +C) <br />TO FINISH <br />(IF VARIABLE <br />EMPLOYEE <br />NO. <br />CONTINGENCY <br />VALUE <br />APPLICATION <br />STORED <br />AND STORED <br />(C -G) <br />RATE) <br />COST <br />TRANSFER <br />(D+E) <br />(NOT IN <br />TO DATE <br />CODE <br />D OR E) <br />(D+E+F) <br />Preconstruction <br />01-0002 <br />Preconstruction <br />$ 10,000.00 <br />$ 10,000.00 <br />$ 10,000.00 <br />$ - <br />$ 10,000.00 <br />100.00% <br />$ - <br />$ 500.00 <br />Bonds & Insurance <br />01-0100 <br />Bonds & Insurance <br />$ 76,368.00 <br />$ 76,368.00 <br />$ 55,927.00 <br />$ 2,044.00 <br />$ 57,971.00 <br />75.91% <br />$ 18,397.00 <br />$ 2,898.55 <br />Permit <br />01-0110 <br />Permit <br />$ 400.00 <br />$ 1,033.46 <br />$ 1,433.46 <br />$ 1,433.46 <br />$ - <br />$ 1,433.46 <br />100.00% <br />$ - <br />$ 71.67 <br />CM General Requirements <br />01-0120 <br />CM General Requirements <br />$ 724,061.00 <br />$ - <br />$ (4,246.61) <br />$ 719,814.39 <br />$ 60,676.65 <br />$ 43,507.93 <br />$ 104,184.58 <br />14A7% <br />$ 615,629.81 <br />$ 5,209.23 <br />CM Contingency <br />01-0130 <br />CM Contingency <br />$ 233,000.00 <br />$ (55,266.97) <br />$ 177,733.03 <br />$ - <br />$ - <br />$ - <br />0.00% <br />$ 177,733.03 <br />$ - <br />CM Fee <br />01-0150 <br />CM Fee <br />$ 101,734.00 <br />$ 101,734.00 <br />$ 5,840.61 <br />$ 1,825.00 <br />$ 7,665.61 <br />7.53% <br />$ 94,068.39 <br />$ 363.26 <br />Thomsen Construction Services <br />03-3300 <br />3A <br />Footings/Pads <br />$ 22,000.00 <br />$ - <br />$ - <br />$ 22,000.00 <br />$ - <br />$ - <br />0.00% <br />$ 22,000.00 <br />$ - <br />Thomsen Construction Services <br />03-3300 <br />3A <br />Footings Labor <br />$ 32,000.00 <br />$ - <br />$ - <br />$ 32,000.00 <br />$ - <br />$ - <br />0.00% <br />$ 32,000.00 <br />$ - <br />Thomsen Construction Services <br />03-3300 <br />3A <br />Walls Material <br />$ 14,000.00 <br />$ - <br />$ - <br />$ 14,000.00 <br />$ - <br />$ - <br />0.00% <br />$ 14,000.00 <br />$ - <br />Thomsen Construction Services <br />03-3300 <br />3A <br />Walls Labor <br />$ 60,000.00 <br />$ - <br />$ - <br />$ 60,000.00 <br />$ - <br />$ - <br />0.00% <br />$ 60,000.00 <br />$ - <br />Thomsen Construction Services <br />03-3300 <br />3A <br />Slab on Grade Material <br />$ 73,000.00 <br />$ - <br />$ - <br />$ 73,000.00 <br />$ - <br />$ - <br />0.00% <br />$ 73,000.00 <br />$ - <br />Thomsen Construction Services <br />03-3300 <br />3A <br />Slab on Grade Labor <br />$ 112,900.00 <br />$ - <br />$ - <br />$ 112,900.00 <br />$ - <br />$ - <br />0.00% <br />$ 112,900.00 <br />$ - <br />Thomsen Construction Services <br />03-3300 <br />3A <br />Reinforcing Material <br />$ 35,000.00 <br />$ - <br />$ - <br />$ 35,000.00 <br />$ - <br />$ - <br />0.00% <br />$ 35,000.00 <br />$ - <br />Thomsen Construction Services <br />03-3300 <br />3A <br />CO#1 PR#4 Stepped Footings <br />$ - <br />$ - <br />$ 2,500.00 <br />$ 2,500.00 <br />$ - <br />$ - <br />0.00% <br />$ 2,500.00 <br />$ - <br />Concrete Treatments <br />03-3350 <br />3B & 9E <br />Polished Concrete and Resinous Flooring <br />$ 73,189.00 <br />$ - <br />$ - <br />$ 73,189.00 <br />$ - <br />$ - <br />0.00% <br />$ 73,189.00 <br />$ - <br />Ultra Concrete <br />03-3390 <br />32D <br />Bond <br />$ 2,400.00 <br />$ - <br />$ - <br />$ 2,400.00 <br />$ - <br />$ - <br />0.00% <br />$ 2,400.00 <br />$ <br />Ultra Concrete <br />03-3390 <br />32D <br />Curb <br />$ 37,000.00 <br />$ - <br />$ - <br />$ 37,000.00 <br />$ - <br />$ - <br />0.00% <br />$ 37,000.00 <br />$ - <br />Ultra Concrete <br />03-3390 <br />32D <br />Bollards/Flag Pole Footings <br />$ 9,800.00 <br />$ - <br />$ - <br />$ 9,800.00 <br />$ - <br />$ - <br />0.00% <br />$ 9,800.00 <br />$ <br />Ultra Concrete <br />03-3390 <br />32D <br />Sidewalks/Paving <br />$ 170,800.00 <br />$ - <br />$ - <br />$ 170,800.00 <br />$ - <br />$ - <br />0.00% <br />$ 170,800.00 <br />$ - <br />Ultra Concrete <br />03-3390 <br />32D <br />CO#1 PR#7 Water Service <br />$ - <br />$ - <br />$ (994.93) <br />$ (994.93) <br />$ - <br />$ - <br />0.00% <br />$ (994.93) <br />$ - <br />Camco Construction <br />04-4200 <br />4A <br />Masonry <br />$ 1,115,000.00 <br />$ - <br />$ - <br />$ 1,115,000.00 <br />$ - <br />$ - <br />0.00% <br />$1,115,000.00 <br />$ - <br />Distinctive Iron <br />05-5120 <br />5A <br />Structural Steel Material-Startup/Shop Drawings <br />$ 38,200.00 <br />$ - <br />$ - <br />$ 38,200.00 <br />$ 38,200.00 <br />$ 38,200.00 <br />100.00% <br />$ - <br />$ 1,910.00 <br />Distinctive Iron <br />05-5120 <br />5A <br />Structural Steel Material <br />$ 75,000.00 <br />$ - <br />$ - <br />$ 75,000.00 <br />$ - <br />$ - <br />0.00% <br />$ 75,000.00 <br />$ - <br />Distinctive Iron <br />05-5120 <br />5A <br />Structural Steel Material <br />$ 115,553.75 <br />$ - <br />$ 87,196.25 <br />$ 202,750.00 <br />$ - <br />$ - <br />0.00% <br />$ 202,750.00 <br />$ - <br />Distinctive Iron <br />05-5120 <br />5A <br />Structural Steel Material <br />$ 67,006.25 <br />$ - <br />$ - <br />$ 67,006.25 <br />$ - <br />$ - <br />0.00% <br />$ 67,006.25 <br />$ - <br />Distinctive Iron <br />05-5120 <br />5A <br />CO#1 Salvaged Steel Bollards <br />$ - <br />$ - <br />$ (1,232.00) <br />$ (1,232.00) <br />$ - <br />$ - <br />0.00% <br />$ (1,232.00) <br />$ - <br />Distinctive Iron <br />05-5120 <br />5A <br />CO#2 Increased RTU Loads <br />$ - <br />$ - <br />$ 1,305.28 <br />$ 1,305.28 <br />$ - <br />$ - <br />0.00% <br />$ 1,305.28 <br />$ - <br />Patriot Erectors <br />05-5121 <br />5B <br />Structural Steel Erection <br />$ 58,000.00 <br />$ - <br />$ - <br />$ 58,000.00 <br />$ - <br />$ - <br />0.00% <br />$ 58,000.00 <br />$ - <br />Patriot Erectors <br />05-5121 <br />5B <br />Joists & Decking <br />$ 29,575.00 <br />$ - <br />$ - <br />$ 29,575.00 <br />$ - <br />$ - <br />0.00% <br />$ 29,575.00 <br />$ - <br />Patriot Erectors <br />05-5121 <br />5B <br />Metal Fabrications <br />$ 26,175.00 <br />$ - <br />$ - <br />$ 26,175.00 <br />$ - <br />$ - <br />0.00% <br />$ 26,175.00 <br />$ - <br />Patriot Erectors <br />05-5121 <br />5B <br />Bond <br />$ 4,000.00 <br />$ - <br />$ - <br />$ 4,000.00 <br />$ 4,000.00 <br />$ 4,000.00 <br />100.00% <br />$ - <br />$ 200.00 <br />Patriot Erectors <br />05-5121 <br />5B <br />CO#1 PR#2R Clerestory Head Detail <br />$ - <br />$ - <br />$ 6,784.00 <br />$ 6,784.00 <br />$ - <br />$ - <br />0.00% <br />$ 6,784.00 <br />$ - <br />Century Construction <br />06-6100 <br />6A <br />Performance & Payment Bond <br />$ 6,400.00 <br />$ - <br />$ - <br />$ 6,400.00 <br />$ 6,400.00 <br />$ 6,400.00 <br />100.00% <br />$ - <br />$ 320.00 <br />Century Construction <br />06-6100 <br />6A <br />Allowance <br />$ 10,000.00 <br />$ - <br />$ - <br />$ 10,000.00 <br />$ - <br />$ - <br />0.00% <br />$ 10,000.00 <br />$ - <br />Century Construction <br />06-6100 <br />6A <br />Mobilization <br />$ 3,100.00 <br />$ - <br />$ - <br />$ 3,100.00 <br />$ - <br />$ - <br />0.00% <br />$ 3,100.00 <br />$ - <br />Century Construction <br />06-6100 <br />6A <br />Materials <br />$ 97,000.00 <br />$ - <br />$ - <br />$ 97,000.00 <br />$ - <br />$ - <br />0.00% <br />$ 97,000.00 <br />$ - <br />Century Construction <br />06-6100 <br />6A <br />Material Blocking <br />$ 12,000.00 <br />$ - <br />$ - <br />$ 12,000.00 <br />$ - <br />$ - <br />0.00% <br />$ 12,000.00 <br />$ - <br />Century Construction <br />06-6100 <br />6A <br />Install Roof Blocking <br />$ 43,000.00 <br />$ - <br />$ - <br />$ 43,000.00 <br />$ - <br />$ - <br />0.00% <br />$ 43,000.00 <br />$ - <br />Pagel / 6 <br />