My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
4.3 SR 05-17-2021
ElkRiver
>
City Government
>
City Council
>
Council Agenda Packets
>
2021 - 2030
>
2021
>
05-17-2021
>
4.3 SR 05-17-2021
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/28/2021 4:22:15 PM
Creation date
5/14/2021 9:57:35 AM
Metadata
Fields
Template:
City Government
type
SR
date
5/17/2021
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
19
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Mr. Justin Femrite, Public Works Director <br />March 11, 2021 <br />Page 6 <br />BIDDING <br />During the bidding phase, we will answer questions from interested Contractors, clarify the plans and <br />specifications, and issue addendums as necessary. We will also attend the bid opening or coordinate <br />an online bid opening, tabulate the bids, and review the bids for any errors or omissions. Upon <br />determination of an apparent low bidder, we will perform investigations as necessary to determine the <br />Contractor's ability to perform the work and provide a recommendation of award to the City. <br />Deliverables: Bid Tabulation and Recommendation for Award of a Construction Contract. <br />Estimated Cost: $1,600 <br />CONSTRUCTION STAKING <br />This phase consists of staking the proposed improvements during construction. It is assumed that <br />construction staking will be necessary for: silt fence, removals, rough grading, storm sewer, sanitary <br />sewer, watermain, curb and gutter, blue -topping of gravel and/or centerline finished grade stakes. Our <br />estimated cost includes one set of stakes, however, re -staking can be provided at an additional cost. <br />Estimated Cost: $18,500 <br />CONSTRUCTION OBSERVATION AND ADMINISTRATION <br />This phase consists of observing the construction to ensure that all work conforms to the approved plans <br />and specifications. The Project Manager will be available for clarifications or for interpretation of the <br />plans and specifications and will make weekly site visits. We will record actual quantities of work and <br />evaluate change order requests, if necessary. We will also prepare Pay Applications and other pertinent <br />items in administering the construction contract. It is proposed that no more than eight weeks be <br />allowed for the construction of the project. <br />Estimated Cost: $49,300 <br />RECORD DRAWINGS <br />Upon completion of the construction project, HAI will assemble pertinent data as necessary to prepare <br />the "as -built" or record drawings. The record drawings will reflect any changes between the "design <br />plans" and the "as -built" condition. <br />Deliverables: Record Drawings in .pdf and AutoCAD format. <br />Estimated Cost: $1,900 <br />Hakanson <br />■■ Anderson <br />
The URL can be used to link to this page
Your browser does not support the video tag.