Laserfiche WebLink
Minnesota / Wisconsin Playground 03/21/2021 <br />5101 Highway 55, Suite 6000 Quote #100737-02-08 <br />Golden Valley, Minnesota 55422 <br />Ph. 800-622-5425 1 763-546-7787 <br />Fax 763-546-5050 1 tim@mnwiplay.com <br />CONSULTANT: TIM NEWGARD <br />City of Elk River- Orono Park- Parkaire Activity Center Additions to <br />Installation - D10441 T1 <br />INSTALL Install - Items added to the Concrete and Footing Work Construction and Installation - <br />Concrete Work to Include: <br />- Install new 126 Inft 24"x12" concrete strip/spread below fountaion wall footing w/ 245 rebar <br />continuous <br />Install six course, 8" CMU foundation with cores @ 4" O.C. and continuous bond beam <br />Install 690 sgft, 4" t interior concrete slab w/ wire mesh <br />Install 3549 sqft, 4"t exterior concrete slab w/ wire mesh and 8"x12" thickened edge @ <br />perimeter of sidewalk <br />- Auger and install (6) 30" diameter x 4' deep concrete post hole footings w/ rebar cage <br />4000PSI Concrete for: <br />(2) 3'-4"x5'4"x1' footing pads for piers w/ rebar <br />(4) 3'-4"x9'4"x1' footing pads for piers w/rebar <br />8" CMU for Column Piers: <br />(2) 2'x4' w/rebar and core fills <br />(4) 2'x8' w/rebar and core fills <br />Note: pads and pieres above are based on an estimate and are subject to chnage due to final <br />engineereding drawings to be provided by GC or Owner. <br />Lake Tahoe Cultured Stone (flats and corners)_ <br />(188SF) installed upon building <br />(200SF) install upon column bases <br />Stone accessories; 301b felt, metal lath, scratch coat and bedding mortar <br />Provide and Install Precast: <br />(961-F) 6"x4" sill atop of stone @ shelter <br />(2) 2'3"x4'3"x4" column caps <br />(4) 2'3"x8'3"x4" column caps <br />Note: precast is based on either a sandblast or acid etch finish in one standard color, ($6,400.00 <br />allowance) <br />Site work includes: <br />excavating for new footings / foundation <br />backfill and compact foundation <br />prep for new exterior concrete <br />rough grade disturbed soils <br />Quote good for 90 days. <br />- does not include final grading or finish grading, landscaping, paving outside the shelter, or <br />disposal or haul away of existing soils. Owner must prepare the site via rough grading and <br />prepare the site area close to the intended elevation so site work can be done my MWP <br />construction as outlined above. <br />Excludes: Gutters or downspouts, Sodding, seeding or site restoration. <br />INSTALL Install - 4000PS1 Concrete for: (2) 3'4"x5'4"x1' Footing pad for piers w/rebar (2) 3'4"x9'4"x1' <br />Footing pad for piers w/rebar <br />Page 2 of 5 <br />