My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
8.4 SR 04-05-2021
ElkRiver
>
City Government
>
City Council
>
Council Agenda Packets
>
2021 - 2030
>
2021
>
04-05-2021
>
8.4 SR 04-05-2021
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/6/2021 8:59:58 AM
Creation date
4/2/2021 10:01:26 AM
Metadata
Fields
Template:
City Government
type
SR
date
4/5/2021
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
48
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Minnesota / Wisconsin Playground 03/21/2021 <br />5101 Highway 55, Suite 6000 Quote #100737-02-08 <br />Golden Valley, Minnesota 55422 <br />Ph. 800-622-5425 1 763-546-7787 <br />Fax 763-546-5050 1 tim@mnwiplay.com <br />CONSULTANT: TIM NEWGARD <br />City of Elk River- Orono Park- Parkaire Activity Center Additions to <br />Installation - D10441 T1 <br />City of Elk River Ship to Zip 55330 <br />Attn: Michael Hecker <br />13065 Orono Parkway <br />Elk River, MN 55330 <br />Phone: 763-635-1150 <br />mhecker@elkrivermn.gov <br />INSTALL Install - Items added to the install and Assembly of Orono Park - Parkaire Activity Center $161,485.00 $161,485.00 <br />Shelter - <br />Shelter Assembly and Construction to Include: <br />Unloading of shelter <br />Complete construction of all shelter framing, roofing, assembly of uprights, beams and joists <br />for 2 tier structure with T&G. <br />Construction of porch per design <br />Installation of sign <br />Electrical work is included, materials and labor included for complete electrical hook ups, <br />wiring and connections. <br />- Plumbing work is included, materials and labor included for complete plumbing hook ups and <br />connections. <br />Includes (1) 30yd dumpster for packaging material disposal. <br />All main components for shelter construction to be provided by supplier (refer to material <br />quote). Included but not limited to, timber walls, doors, hardware, windows, trusses, ceiling T&G, <br />bathroom fixtures, electrical components, facia trim, vents, dura rock for walls, shingels, <br />fasterners. <br />Excludes: Gutters or downspouts, sodding, seeding or site restoration. <br />Bond <br />Other - <br />Performance Bond <br />Permit <br />Other - <br />City Permit <br />INSTALL <br />Install - <br />First Plumbing bid <br />INSTALL <br />Install - <br />Addition plumbing for added urinals <br />INSTALL <br />Install - <br />Electrician <br />INSTALL <br />Install - <br />Tile backerboard and tile setting <br />INSTALL <br />Install - <br />Installation of electric vents and timer <br />INSTALL <br />Install - <br />T&G ceiling install missed in first bid <br />INSTALL <br />Install - <br />Additional mileage <br />INSTALL <br />Install - <br />Porch not included in first bid <br />Page 1 of 5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.