My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
3.1. PCSR 03-04-2021
ElkRiver
>
City Government
>
Boards and Commissions
>
Planning Commission
>
Planning Packets
>
2021-2030
>
2021
>
03-04-2021 Special
>
3.1. PCSR 03-04-2021
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/2/2021 8:01:55 AM
Creation date
3/1/2021 10:41:54 AM
Metadata
Fields
Template:
City Government
type
PCSR
date
3/4/2021
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
2. Lots 4 and 5: <br />a. The minimum size of water service line and corporation when the water service <br />line exceeds 200-feet shall be 1½” <br />b. Hydrants shall be spaced so that all portions of a building or residence to be <br />protected are within a 250 foot radius of a hydrant <br /> <br />Environmental <br />1. The wetland delineation for this site was approved on 10/8/2020. There is one small <br />basin on the south side and tributary/ditch running through the site. Both are within an <br />easement, wetland/stormwater pond should be within an outlot if possible. The entire <br />parcel is within the Shoreland Management District (from the tributary) and maximum <br />hardcover per parcel is 25%. <br /> <br />Department of Natural Resources <br />1. This plat is along public water course M-065-001 and shows an existing bituminous <br />driveway crossing the public water course. If this existing bituminous driveway was to be <br />removed in the public water course a public water work permit will be required. <br />2. Per Sec. 30-2021 (3) Lot widths along a listed Stream need to be 80 feet in width <br /> <br />Engineering <br />1. Will need full stormwater report in accordance with city ordinance. <br />2. Soil borings for proposed infiltration basins. <br />3. Full construction/development plans with driveway grades. <br />4. Ensure positive drainage with removal of temporary cul-de-sac. <br />5. Adjust existing south temporary CB to match finished grade. <br />6. Existing stormwater pond to be outlot instead of D&U. <br />7. Keep dual perimeter control around entire pond. <br />8. Adjust lot 6 driveway to avoid D&U. <br />9. More detail on grading for swale east of lot 9. <br />10. Include note that City will not maintain proposed retaining wall(s). <br /> <br />Please submit revised the drawing(s) and other requested information, as indicated above, by <br />January 19, 2021. If city staff does not receive the requested information by January 19, 2021, <br />we will postpone your application. <br /> <br />Please let me know if you have any questions. <br /> <br /> <br />Sincerely, <br /> Chris Leeseberg, Senior Planner <br />Ph: 763.635.1033 <br />cleeseberg@ElkRiverMN.gov
The URL can be used to link to this page
Your browser does not support the video tag.