My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
3.1. PCSR 03-04-2021
ElkRiver
>
City Government
>
Boards and Commissions
>
Planning Commission
>
Planning Packets
>
2021-2030
>
2021
>
03-04-2021 Special
>
3.1. PCSR 03-04-2021
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/2/2021 8:01:55 AM
Creation date
3/1/2021 10:41:54 AM
Metadata
Fields
Template:
City Government
type
PCSR
date
3/4/2021
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />Phone: 763.635.1000 <br /> <br />www.ElkRiverMN.gov <br /> <br />January 8, 2021 <br /> <br />Bill Christian VIA EMAIL: bill@billchristian.com <br />21000 Rogers Drive <br />Rogers, MN 55374 <br /> <br />RE: Complete Application Notice and Comments for Preliminary and Final Plat Applications <br /> <br />Dear Mr. Christian, <br /> <br />Thank you for your application for a Preliminary and Final Plat. I will be reviewing your <br />applications and preparing the staffs report for the Planning Commission and City Council. <br /> <br />On December 29, 2020, the city received your application for the above use. Per state statute <br />462.358 Subdivision 3b, the city is required to decide within 120 days of receipt of the completed <br />preliminary plat application. Subdivision 3 of that section requires the city to notify an applicant <br />within 15 business days if information is missing, delaying the start of the 120-day review period. <br /> <br />With the receipt of the required materials on December 29, 2020, the applications for a Preliminary <br />and Final Plat have been deemed complete, and the 120-day review period starts. This application <br />has been assigned Case Number P 21-01 and is scheduled to be reviewed by the Planning <br />Commission on January 26, 2021, at 6:30 p.m. at the Elk River City Hall, 13065 Orono Parkway. <br />With a Planning Commission recommendation, the City Council will review your application no <br />earlier than February 16, 2021 (Tuesday). <br /> <br />Staff conducted a thorough site plan review on January 4, 2021 and has the following comments: <br /> <br />Sherburne County <br />1. The proposed improvements will not be approved by Sherburne County Public Works <br />Engineering. Lots 4 and 5 are shown to directly access CSAH 1. They do not meet their <br />required access spacing guidelines of 660’ from an adjacent intersection. <br /> <br />Water Department <br />1. No dead-end mains shall be constructed. All watermains shall be looped. There is a <br />watermain stub on 196th Lane that can be utilized to create a loop. <br />
The URL can be used to link to this page
Your browser does not support the video tag.