Laserfiche WebLink
Terra Fraject Numbs 20. <br />ATerra Elk River PUblicsofery BuildiItg Expos <br />OO W 8N 0TCT I O N My Of Elk 9'7 <br />CONTINUATION SHEET AIADOCUMENT6703 <br />AIA Document G702, APPLICATION AND CERTIFICATION FOR PAYMENT, containing APPLICATION NO: 4 <br />Contractor's signed certification is attached. APPLICATION DATE: 1/1/21 <br />In tabulations below, amounts are stated to the nearest dollar. PERIOD TO: 1/31/21 <br />A <br />A.1 <br />B <br />C <br />C.1 <br />-C.2 <br />C.3 <br />D E <br />F <br />G <br />H <br />SUBCONTRACTOR <br />ITEM <br />BID <br />DESCRIPTION OF WORK <br />SCHEDULED <br />CHANGE <br />BUDGET <br />REVISED <br />WORKCOMPLETED <br />MATERIALS <br />TOTAL <br />% <br />BALANCE <br />RETAINAGE <br />VENDOR <br />NO. <br />PACK <br />VALUE <br />ORDERS <br />REVISION/ <br />SCHEDULED <br />PRESENTLY <br />COMPLETED <br />(G. ) <br />TO FINISH <br />FROM PREVIOUS <br />THISPERIOD <br />EMPLOYEE <br />NO. <br />CONTINGENCY <br />VALUE <br />APPLICATION <br />STORED <br />AND STORED <br />(C -G) <br />COST <br />TRANSFER <br />(D+E) <br />(NOT IN <br />TO DATE <br />CODE <br />D OR E) <br />(D+E+F) <br />Crawford Doors <br />08-8361 <br />8B <br />OH Doors <br />$ 124,800.00 <br />$ - <br />$ - <br />$ 124,SOD.00 <br />$ - <br />$ <br />0.00% <br />$ 124,800.00 <br />$ - <br />Crawford Doors <br />08-8361 <br />8B <br />00g1 High Speed Door VE Option Nl <br />$ - <br />$ - <br />$ (6,1D0.00) <br />$ (6,100.00) <br />$ - <br />$ <br />0.00% <br />$ (6,100.00) <br />$ - <br />Heartland Glass <br />08-9800 <br />8C <br />Aluminum, Glass and Glazing-PD Material <br />$ 7,462.00 <br />$ - <br />$ - <br />$ 7,462.00 <br />$ - <br />$ - <br />0.00% <br />$ 7,462.00 <br />$ - <br />HeartlandGlass <br />06-BWD <br />SC <br />Aluminum, Glass and Glazing-PD Labor/GC's <br />S 11,810.D0 <br />$ - <br />$ - <br />$ 11,810.00 <br />$ 1,S35.00 <br />$ 1,535.00 <br />13.009E <br />$ 10,275.00 <br />$ 76.75 <br />Heartland Glass <br />08-8800 <br />8C <br />'Aluminum, Glass and Glazing -Fire Material <br />$ 31,920.00 <br />$ - <br />$ - <br />$ 31,920.00 <br />$ <br />$ - <br />0.00% <br />$ 31,920.DD <br />$ - <br />Heartland Glass <br />08-88M <br />SC <br />Aluminum, Glass and Glazing -Fire Labor/GC's <br />$ 16,742.00 <br />$ - <br />$ - <br />$ 16,742.00 <br />$ <br />$ - <br />0.00% <br />$ 16,742.00 <br />$ - <br />Quality Drywall <br />09-9250 <br />9A <br />Mobilization <br />00 <br />$ 5,0.00 <br />$ - <br />$ - <br />$ 5,000.00 <br />$ 5,000.00 <br />$ 5,0D0.D0 <br />100.00% <br />$ - <br />$ 250.00 <br />ality Drywall <br />09-9250 <br />9A <br />Metal Framing <br />Material <br />$ 12,000.00 <br />$ - <br />$ - <br />$ 12,0130.00 <br />$ 4,200.00 <br />$ 4,200.00 <br />35.00% <br />$ 7,800.00 <br />$ 210.00 <br />Quality Drywall <br />09-9250 <br />9A <br />Drywall <br />Material <br />$ 20,000.00 <br />$ - <br />$ - <br />$ 20,000.00 <br />$ - <br />$ 7,000.00 <br />S 7,000.00 <br />35.00% <br />$ 13,000.00 <br />$ 350.00 <br />Quality Drywall <br />D9-9250 <br />9A <br />Taping <br />Material <br />$ 4,000.00 <br />$ - <br />$ - <br />$ 4,000.00 <br />$ - <br />$ 1,400.00 <br />$ 1,400.00 <br />35.00% <br />$ 2,600.00 <br />$ 70.00 <br />Quality Drywall <br />09-92SO <br />9A <br />EIFS <br />.Material <br />$ 8,000.00 <br />$ - <br />$ - <br />$ 8,000.00 <br />$ - <br />$ - <br />0.00% <br />$ 81000.00 <br />$ - <br />Quality Drywall <br />09-9250 <br />9A <br />Metal Framing <br />Labor <br />$ 45,000.00 <br />S - <br />$ - <br />$ 45,000.00 <br />$ 25,750.0-0 <br />$ 15,750.00 <br />35.D0% <br />S 29,250.00 <br />$ 787.50 <br />Quality Drywall <br />09-9250 <br />9A <br />Drywall <br />Labor <br />$ 60,D00.00 <br />$ <br />$ - <br />$ 60,000.00 <br />$ - <br />$ 21,000.00 <br />$ 21,000.00 <br />35.00% <br />$ 39,000.DO <br />$ 1,050.00 <br />Quality Drywall <br />09-9250 <br />9A <br />Taping <br />Labor <br />$ 20,000.00 <br />$ <br />$ - <br />$ 20,000.00 <br />$ - <br />$ 7,000.00 <br />$ 7,000.00 <br />35.00% <br />$ 13,000.00 <br />$ 350.00 <br />Quality Drywall <br />09-9250 <br />9A <br />EIFS <br />Labor <br />$ 15,000.00 <br />$ <br />$ - <br />$ 15,000.00 <br />$ - <br />$ - <br />0.00% <br />$ 15,000.00 <br />$ - <br />QualityDrywall <br />09-92SO <br />9A <br />Allowance <br />$ 7,000.00 <br />$ <br />$ - <br />$ 7,000.00 <br />$ - <br />$ - <br />0.00% <br />$ 7,000.00 <br />$ - <br />Quality Drywall <br />09-9250 <br />9A <br />COg1 <br />$ - <br />$ <br />$ - <br />$ - <br />$ - <br />$ - <br />RDIV/0! <br />$ - <br />$ - <br />Quality Drywall <br />09-9250 <br />9A <br />COg2 Demo and Patch RI PD Upper Leyel <br />$ - <br />$ <br />$ 2,775.00 <br />$ 2,775.00 <br />$ - <br />$ <br />0.00% <br />$ 2,775.00 <br />$ - <br />Mid -State Tile <br />09-9300 <br />9B <br />Tile Labor <br />$ 19,311.00 <br />$ <br />9 - <br />$ 19,311.00 <br />$ - <br />$ - <br />0.00% <br />$ 19,31L00 <br />$ - <br />Mid -State Tile <br />09-9300 <br />9B <br />Tile Materials <br />$ 17,693.D0 <br />$ <br />$ - <br />$ 17,693.00 <br />S - <br />$ - <br />O.DO% <br />$ 17,693.00 <br />$ - <br />Mid -State Tile <br />09-9300 <br />9B <br />Bond <br />$ g00.00 <br />$ <br />$ - <br />$ 800.00 <br />$ - <br />$ - <br />0.00% <br />$ a0D.00 <br />$ - <br />Mid -State Tile <br />09-9300 <br />9B <br />Area B - Upper (212, 220, 221) <br />Labor <br />$ 8,307.00 <br />S <br />S - <br />$ 8,307.00 <br />$ - <br />$ - <br />0.00% <br />$ 8,307.DO <br />$ - <br />Mid -State Tile <br />09-9300 <br />9B <br />Area B- Lower (1SO) <br />Material <br />$ 300.00 <br />$ <br />$ - <br />$ 300.00 <br />$ - <br />$ - <br />0.00% <br />$ 300.00 <br />$ - <br />Mid -State Tile <br />09-9300 <br />96 <br />00ff1 ASI 211 TL 8-11 Change <br />$ - <br />$ <br />$ 7,472.00 <br />$ 7,472.00 <br />$ - <br />$ - <br />0.00% <br />$ 7,472.00 <br />$ - <br />Twin City Acoustics <br />09-9510 <br />9C <br />ACT <br />$ 34,700.00 <br />$ <br />$ - <br />S 34,7DO.00 <br />S - <br />$ - <br />0.00% <br />$ 34,700.00 <br />S - <br />-win City Acoustics <br />09-9520 <br />9C <br />COg1 Change ACT-1 & 2 <br />$ - <br />$ <br />$ 6,829.00 <br />$ 6,829.00 <br />$ - <br />$ - <br />0.00% <br />$ 6,629.00 <br />$ - <br />Carpet& Resilient(TOD) <br />09-9680 <br />9D <br />Flooring <br />$ 52,125.DD <br />$ - <br />$ - <br />$ 52,125.00 <br />$ - <br />$ - <br />0.DO% <br />$ 52,125.00 <br />$ - <br />Surface Pro's <br />09.9671 <br />9E <br />Resinous Flooring <br />$ 98,912.50 <br />$ - <br />$ - <br />$ 98,912.50 <br />$ - <br />$ <br />0.00% <br />$ 98,912.50 <br />$ - <br />Virnig Painting <br />09-9900 <br />9F <br />Painting <br />$ 107,444.00 <br />$ - <br />$ <br />$ 107,444.00 <br />$ - <br />$ - <br />0.00% <br />$ 107,444.00 <br />$ - <br />Precise Heating <br />15-2500 <br />22A <br />Performance Bond HVAC <br />$ 5,596.00 <br />$ - <br />$ - <br />S 5,596.00 <br />$ 5,596.00 <br />$ 5,596.00 <br />100.00% <br />S - <br />$ 279.80 <br />Precise Heating <br />15-1500 <br />22A <br />Performance Bond Plumbing <br />$ 2,143.00 <br />$ - <br />$ - <br />$ 2,143.00 <br />S 2,143.00 <br />$ 2,143.00 <br />100.00% <br />$ - <br />$ 107.15 <br />Precise Heating <br />15-1500 <br />22A <br />PD HVAC <br />Labor <br />$ 103,400.00 <br />$ - <br />$ - <br />$ 103,40D.00 <br />$ - <br />S 14,000.00 <br />$ 14,DDO.00 <br />13.54% <br />$ 89,400.00 <br />$ 700.00 <br />'redse Heating <br />15-15DO <br />22A <br />PD HVAC <br />Material <br />$ 317,077.00 <br />$ - <br />$ - <br />$ 317,077.00 <br />$ - <br />$ 40,000.DO <br />$ 40,000.00 <br />12.62% <br />S 277,077.00 <br />$ 2,000.00 <br />Precise Heating <br />15-1500 <br />22A <br />FD HVAC <br />Labor <br />$ 79,400.00 <br />$ - <br />$ - <br />$ 79,400.00 <br />S 15,261.00 <br />$ 15,26L00 <br />19.22% <br />$ 64,139.00 <br />$ 763.05 <br />'rease Heating <br />15-1500 <br />22A <br />FD HVAC <br />Material <br />$ 240,627.OD <br />$ - <br />$ - <br />$ 240,627.00 <br />$ - <br />$ - <br />0.00% <br />$ 240,627.00 <br />$ - <br />'recise Heating <br />15.1500 <br />22A <br />PD Plumbing <br />Labor <br />$ 47,650.00 <br />$ - <br />$ - <br />$ 47,650.00 <br />$ 18,000.00 <br />$ 31DO0.00 <br />$ 21,000.00 <br />44.07% <br />$ 26,650.130 <br />$ 1,050.DO <br />'recise Heating <br />15-1500 <br />22A <br />PD Plumbing <br />Material <br />$ 83,618.00 <br />$ - <br />$ - <br />$ 83,618.00 <br />$ 22,000.00 <br />$ 3,000.00 <br />S 25,000.00 <br />29.90% <br />$ 59,618.00 <br />$ 1,250.00 <br />Precise Heating <br />15-1500 <br />22A <br />FD Plumbing <br />labor <br />$ 58,780.00 <br />$ - <br />$ - <br />$ 58,780.00 <br />$ - <br />$ - <br />0.00% <br />S 58,780.00 <br />S - <br />)mcise Heating <br />15-1500 <br />22A <br />FD Plumbing <br />Material <br />$ 93,549.00 <br />$ - <br />$ - <br />S 93,549.00 <br />$ - <br />$ - <br />0.00% <br />$ 93,549.00 <br />$ - <br />'recise Heating <br />15-1500 <br />22A <br />ADD Alt#3 RTU Replacement <br />Labor <br />$ 21800.00 <br />$ - <br />$ - <br />$ 2,SDO.00 <br />$ - <br />$ - <br />0.00% <br />$ 2,800.00 <br />S - <br />Page 3 / 6 SPC East Tower - Terre Pay App <br />