Laserfiche WebLink
Terra Project Number 20.704 <br />Terra Elk River PWNic Safety Building Expensi <br />V ONOTRUCTION M r - _ <br />CONTINUATION SHEET AIADOCUMENTS703 <br />AIA Document G702, APPLICATION AND CERTIFICATION FOR PAYMENT, containing APPLICATION NO: 4 <br />Contractor's signed certification Is attached. APPLICATION DATE: 1/1/21 <br />In tabulations below, amounts are stated to the nearest dollar. PERIOD TO: 1/31/21 <br />SUBCONTRACTOR <br />VENDOR <br />A <br />REM <br />NO. <br />I A.1 <br />BID <br />PACK <br />B <br />DESCRIPTION OF WORK <br />C <br />SCHEDULED <br />VALUE <br />C.1 <br />CHANGE <br />ORDERS <br />C.2 <br />BUDGET <br />REVISION / <br />C.3 <br />REVISED <br />SCHEDULED <br />D E <br />WORKCOMPLETED <br />F <br />MATERIALS <br />PRESENTLY <br />G <br />TOTAL <br />COMPLETED <br />% <br />(G+C) <br />H <br />BALANCE <br />TO FINISH <br />I <br />RETAINAGE <br />FROM PREVIOUS <br />THIS PERIOD <br />EMPLOYEE <br />NO. <br />CONTINGENCY <br />VALUE <br />APPLICATION <br />STORED <br />ANDSTORED <br />(C -G) <br />COST <br />TRANSFER <br />(D+E) <br />(NOTIN <br />TO DATE <br />CODE <br />_ <br />D OR El <br />(D+E+F( <br />Ben's Structural Fab <br />OS-5120 <br />5A <br />Steel Supplier -Joist <br />$ 53,937.50 <br />$ <br />$ - <br />$ 53,937.50 <br />$ - <br />$ 53,937.50 <br />$ 53,937.50 <br />100.001A <br />$ - <br />$ 2,696.88 <br />Ben's Structural Fab <br />05-5120 <br />SA <br />Steel Supplier -Deck <br />S 23,732.50 <br />$ - <br />$ - <br />$ 23,732.50 <br />$ - <br />$ 23,732.50 <br />$ 23,732.50 <br />100.00% <br />$ - <br />$ 1,186.63 <br />Ben's Structural Fab <br />05-5120 <br />SA <br />Steel Supplier -Metal Fabrication <br />$ 26,11&12 <br />$ <br />$ - <br />$ 26,118.12 <br />$ - <br />$ - <br />0.00% <br />S 26,118.12 <br />$ - <br />Patriot Erectors <br />05-5121 <br />5B <br />PD- Structural Steel <br />Labor <br />$ 8,362.00 <br />$ - <br />$ - <br />$ 8,362.00 <br />$ - <br />$ <br />0.00% <br />$ 8,362.00 <br />$ <br />Patriot Erectors <br />05-S121 <br />5B <br />PD - Steel Joist <br />Labor <br />S 6,500.00 <br />$ - <br />$ - <br />$ 6,500.00 <br />$ <br />$ <br />0.00% <br />$ 6,500.00 <br />S - <br />Patriot Erectors <br />05-5121 <br />5B <br />PD-Steel Roof Deck <br />Labor <br />$ 71500.00 <br />S - <br />$ - <br />S 7,500.00 <br />$ <br />$ <br />0.00% <br />$ 7500.00 <br />$ <br />Patriot Erectors <br />05-5121 <br />SB <br />PD - Metal Fab <br />Labor <br />S 4,500.00 <br />$ <br />$ - <br />S 4,500.00 <br />$ - <br />$ <br />0.00% <br />$ 4,500.00 <br />$ <br />Patriot Erectors <br />05-5121 <br />5B <br />FD- Structural Steel <br />Lobar <br />$ 2,780.00 <br />$ <br />$ - <br />$ 2,700.00 <br />$ - <br />$ 500.DO <br />$ SDO.00 <br />17.99% <br />$ 2,290.00 <br />$ 25.DO <br />Patriot Erectors <br />05-5121 <br />5B <br />FD - Steel Joist <br />'labor <br />$ 2,000.00 <br />$ <br />$ - <br />$ 2,000.00 <br />$ - <br />$ 2,000.00 <br />$ 2,000.00 <br />100.00% <br />$ - <br />S 100.00 <br />Patriot Erectors <br />05-5121 <br />56 <br />FD-Steel Roof Deck <br />Labor <br />$ 4,000.00 <br />$ <br />$ - <br />S 4,D00.DO <br />$ - <br />$ 4,000.00 <br />$ 4,000.DO <br />100.00% <br />$ - <br />5 200.00 <br />Patriot Erectors <br />05-5221 <br />56 <br />FD-Metal Fab <br />Labor <br />$ 1,750.00 <br />$ <br />$ - <br />$ 1,750.00 <br />$ <br />$ <br />0.00% <br />$ 1,750.00 <br />$ <br />Patriot Erectors <br />05-5121 <br />5B <br />FD - Metal Stairs <br />Labor <br />$ 1,600.00 <br />$ <br />$ - <br />$ 1,600.00 <br />$ <br />$ - <br />0.00% <br />$ 1,600.00 <br />$ <br />Patriot Erectors <br />05-5121 <br />5B <br />FD-Pipe&Tube Railings <br />Labor <br />$ 1,500.00 <br />$ <br />$ - <br />$ 1,500.00 <br />5 - <br />$ - <br />0.00% <br />$ 1500.00 <br />$ <br />Patriot Erectors <br />05-5121 <br />5B <br />Bond <br />$ 658.00 <br />$ <br />$ - <br />$ 658.00 <br />$ - <br />$ 658.00 <br />$ 658.00 <br />100.D0% <br />$ - <br />$ 32.90 <br />Century Construction <br />06-6100 <br />6A <br />Area A FD Addition Envelop <br />$ 11,D00.00 <br />$ - <br />$ - <br />$ 13,000.00 <br />$ 5,500.00 <br />$ 2,530.00 <br />$ 8,030.00 <br />73.00% <br />S 2,970.00 <br />$ 401.50 <br />Century Construction <br />06-6100 <br />6A <br />Area A FD Addition Interior <br />$ 10,200.00 <br />$ - <br />$ - <br />S 10,200.00 <br />$ - <br />$ <br />0.00% <br />$ 10,2DO.00 <br />$ - <br />Century Construction <br />06-6100 <br />6A <br />Area A FD Renovation <br />$ 17,000.00 <br />$ - <br />$ - <br />$ 17,000.00 <br />$ - <br />$ <br />0.00% <br />S 17,000.00 <br />$ - <br />Century Construction <br />06-6100 <br />6A <br />Area C PD Addition Envelope <br />$ 18,000.00 <br />S - <br />$ - <br />$ 18,000.DO <br />$ - <br />$ 2,520.00 <br />$ 2,520.DO <br />14.00% <br />$ 15,480.00 <br />$ 126.00 <br />Century Construction <br />06-6100 <br />6A <br />Area C PD Addition Interior <br />$ 3,ODO.00 <br />$ - <br />$ - <br />$ 3,ODO.00 <br />$ - <br />$ <br />0.00% <br />$ 3,000.00 <br />$ - <br />Century Construction <br />06-6100 <br />6A <br />Area C PD Renovation <br />$ 10,300.00 <br />$ - <br />$ - <br />$ 10,300.00 <br />$ - <br />$ <br />0.00% <br />$ 10,300.00 <br />$ - <br />Century Construction <br />06-6100 <br />6A <br />Area B PD Phase 1 <br />$ 15,000.00 <br />$ - <br />$ - <br />S 15,000.00 <br />$ - <br />$ 5,025.00 <br />$ 5,025.00 <br />33.50% <br />$ 9,975.00 <br />$ 251.25 <br />Century Construction <br />06-6100 <br />6A <br />Area B PD Phase 2 <br />$ 14,000.00 <br />$ - <br />$ - <br />$ 14,000.00 <br />S - <br />$ - <br />0.00% <br />$ 14,000.00 <br />$ - <br />Century Construction <br />05-6100 <br />6A <br />Alternate #1-LL Are.B <br />$ 2,000.00 <br />$ - <br />$ - <br />$ 21000.00 <br />$ - <br />$ - <br />0.00% <br />$ 2,000.00 <br />$ <br />Century Construction <br />06-5100 <br />6A <br />Performance and Payment Bond <br />$ 4,500.00 <br />$ - <br />$ - <br />$ 4500.00 <br />$ 4,50O.D0 <br />$ 4,500.00 <br />100.00% <br />$ - <br />$ 225.00 <br />Century Construction <br />06-6100 <br />6A <br />Allowance <br />$ 10,D00.00 <br />$ - <br />$ - <br />$ 10,000.00 <br />$ <br />$ - <br />0.00% <br />$ 10,000.00 <br />$ - <br />Century Construction <br />06-6100 <br />6A <br />Area A Materials <br />$ 12,500.00 <br />$ - <br />$ - <br />$ 12,5DO.00 <br />$ 5,000.00 <br />$ 5,ODO.00 <br />40.00% <br />S 7,500.00 <br />$ 250.00 <br />Cent ry Construction <br />06-6100 <br />6A <br />Area B Materials <br />$ 14,000.00 <br />$ - <br />$ - <br />$ 14,000.00 <br />$ - <br />$ 2,100.00 <br />$ 2,100.00 <br />15.00% <br />S 11,900.DO <br />$ 105.00 <br />Century Construction <br />06-6100 <br />6A <br />Area C Materials <br />$ 12,500.00 <br />$ - <br />$ - <br />$ 12,500.00 <br />$ - <br />$ - <br />0.00% <br />S 12,500.00 <br />$ <br />Century Construction <br />06.6100 <br />6A <br />CO#1 ASI#1 Toilet Partition <br />$ - <br />$ - <br />$ 1,816.28 <br />$ 1,816.28 <br />$ - <br />$ - <br />0.00% <br />$ 1,916.28 <br />$ - <br />Ron's Cabinets <br />06-6200 <br />6B <br />Casework <br />$ 83,750.00 <br />$ - <br />$ - <br />$ 83,750.00 <br />$ <br />$ - <br />0.00% <br />$ 93,750.00 <br />S - <br />Structural Applicators <br />07-7210 <br />7C <br />Fluid Applied Air Barriers <br />$ 14,696.00 <br />$ - <br />$ <br />$ 14,695.00 <br />$ <br />$ - <br />0.00% <br />$ 14,696.00 <br />$ - <br />,ohn ADalsin <br />07-7510 <br />7A <br />Roofing <br />$ 236,246.00 <br />$ - <br />$ <br />$ 236,246.00 <br />$ - <br />$ - <br />0.00% <br />S 236,246.00 <br />$ - <br />Lake Area Roofing <br />07-7412 <br />7B <br />Metal Wall Panels <br />$ 17,881.00 <br />$ - <br />$ <br />$ 17,881.DO <br />$ - <br />$ - <br />0.00% <br />S 17,881.00 <br />$ <br />Waumadee Creek <br />07-79DO <br />7D <br />Sealants <br />$ 39,684.00 <br />$ - <br />$ - <br />$ 39,684.00 <br />$ - <br />$ - <br />0.00% <br />$ 39,684.00 <br />$ <br />Waumadee Creek <br />07-7900 <br />7D <br />CO#1 PR#2R Caulk Patching <br />$ - <br />S - <br />$ 190.00 <br />$ 190.00 <br />$ - <br />$ - <br />O.DD% <br />$ 190.00 <br />$ - <br />Mid -Central Door <br />084200 <br />8A <br />Hardware Material <br />$ 36,623.D0 <br />5 - <br />$ - <br />$ 36,623.00 <br />S - <br />$ - <br />0.00% <br />$ 36,623.00 <br />$ - <br />Mid -Central Door <br />08-8200 <br />8A <br />HM Door Material <br />$ 11,098.00 <br />$ - <br />$ - <br />$ 11,09&00 <br />S - <br />$ - <br />0.00% <br />$ 11,09&00 <br />$ - <br />Mid -Central Door <br />08-8200 <br />8A <br />HM Frame Material <br />$ 22,122.00 <br />$ - <br />$ - <br />$ 22,122.00 <br />S 11,697.32 <br />$ 11,697.32 <br />52.88% <br />$ 10,424.68 <br />$ 564.87 <br />Mid -Central Door <br />M8200 <br />SA <br />Specialty Material <br />$ 3,541.00 <br />$ - <br />$ - <br />$ 3,541.00 <br />$ <br />$ - <br />0.00% <br />$ 3,54J.00 <br />$ <br />Mid -Central Door <br />08-9200 <br />8A <br />WD Door Material <br />$ 12,861.00 <br />$ - <br />$ - <br />$ 12,861.00 <br />$ <br />$ - <br />0.00% <br />$ 12,861.00 <br />$ - <br />Mid -Central Door <br />08-8200 <br />BA <br />00#1 <br />$ - <br />$ - <br />$ 1,294.50 <br />$ 1,294.50 <br />$ 1,294.50$ <br />1,29450 <br />300.00% <br />$ - <br />$ 64.73 <br />Page 2 / 6 SPC East Tower -Term Pay App <br />