Laserfiche WebLink
Phase 2, Floor 1 - Fire Station fit 1 Install Starting Approx Ist 2021 "Confirm- <br />Neutral Posture: 24/7-Task Chalr <br />Mid Back, large Seat, Swing Arms, Muhl -tilt mechanism, 5- Cylinder Slide, Weight rated to 35O Ibs. <br />Task Chair <br />FlN6N: Ballistic Blad(Upholstery), Black(Frame/Base) <br />101, Say, 1OS, 11B <br />a*0 <br />FLOORING: Carpet, Hard Casters _ SwMN lap• <br />1. i`wumh <br />5 <br />$699.13 <br />$3,495.65 <br />hxk <br />'zTs i mNpedadenteM rent ang erpk <br />AM <br />• H4t did.us(fawNd tix-stop <br />SHsllder <br />Neutial Posture: 24/7 -Task Chair <br />Mid Back, Large Seat, Swing Arms, Mehl -tilt mechanism, 5" CVIlnder Slide, Weight rated to 3501b,. <br />Task Chair <br />103 <br />FINISH: Ballistic Black (Upholstery), Black(Frame/Base) ^ <br />FLOORING: 11 -1, SeR _ nhauWA <br />Casters Pnaritmtk:tew l+'Dr't <br />2 <br />$699.13 <br />$1,398.26 <br />Indepmdsmil-1 n9k <br />'fib i kdePmdarasealanp4 <br />• Men eead}uu ldwatddh xreP <br />3 i <br />Seat Ykkr <br />Safeco: Stool <br />Task Master a Deluxe Workbench Chairwith T-Pad Arm Rests with Foot Ring, Seat Height Range: 19" - 27", Glides. <br />Task Stool <br />FINISH: Black <br />11%113 <br />�• awe wi•nx�ie <br />FLOORING: <br />2 <br />$622.20 <br />$1,264.40 <br />Mooreco: Cork Board <br />Cork Boats <br />* T <br />e "grii <br />48•1­1 x 72RW Natural Add -Cork Tackboard with Aluminum Trim, Wall Mounted <br />FINISH: Aluminum Trim, Natural Cork Board <br />110 <br />1 <br />$123.70 <br />$123.70 <br />St. Timothy: Recliner <br />Recliner Lounge Chair, with Brass Nail Trim, 38H x 35W x 37D x 62 Open. Weight Limit (300-325His) <br />FINISH: Faux loather, Uaraleatherj Orginal-5hittake <br />Day Room <br />114 <br />■ <br />4 <br />$1,980.00 <br />$7,920.00 <br />Haworth <br />Very Wire Stacker, Plastic Seat, Plastic Back Armless <br />FINISH: Tomnoe (Plastic Seat/Backl, Chrome (Legs) <br />Day Room <br />114 <br />12 <br />$102.96 <br />$1,234.32 <br />Phase 2, Floor l - Fire Station#2 SUBTOTAL: $15,416.33 <br />FURNITURE TOTAL <br />$142,139.40 <br />$7,106.97 <br />Estimated Freleht4Tarlffs <br />-subject to change hosed on jnol quantities. <br />$35O.W <br />$5,200.00 <br />FLUID SPECIFICATION, 3D RENDERINGS, INSTALLATION PAWS AND DESIGN <br />PHASE 1, FLOOR 2-Public Sakrx <br />NON -UNION LABOR TO RECEIVE,DELIVER, AND INSTALL BASED ON REGULAR HOURS, ITRIP <br />$15,676.70 <br />•NWT Asw,nr aMmoWna ornnwwla7edsmepAmluexYbe dmebyOryayEpaNw-mrEMd MhMs <br />PHASE 2, FLOOR 1- Public Salley 46 lire Station #2 <br />NON -UNION LABOR TO RECEIVE,DELIVER, AND INSTALL BASED ON REGULAR HOURS, I TRIP <br />$5,353.50 <br />YNJIF: Avumas agmoM,Owrtnsaeaa7attvNpNmewe w•gbe eon by LYy nyfaaAw roeMMNerrbi. <br />Sales Tax -Tax Exempt <br />$0.00 <br />$175,826.57 <br />GRANDTOT <br />TERMS AND CONDITIONS <br />Site Conditions: Installation pricing is based on non -union, single-phase installation during regular business; hours (6:00 a. in. —2:00 p.m.), with product shipping to Fluid warehouse. Pricing assumes the space is free and clear, with exclusive access to dock <br />end freight elava[or(s) — no eteir carry. All data, electrical work, and panel to panel connections to be completed by others. Any deviations from the terms outlined herein may result in an increase in price. <br />Design: Design estimate is based on current scope of work Any revisions to scope will be billed at $100/hour. <br />Pricing: Pricing is valid for 30 days. Pricing does not include freight, installation or sales tax. Any unforeseen tan# charges will be subject to a change order and Invoiced separately. This document is for budgeting only. Once all product is finel¢ad a formal <br />quote will be issaued. A customer setup form, W9, and 50% deposit are required to process orders. <br />Lead 71mes: Lead times begin after formal quote and purchase order has been procsssed. Lead lime does not Include ship time to destinagon. <br />