Laserfiche WebLink
Phase 2, Floor 1 - Public Safety Building I Install Starting Approx. <br />Neutral Pasta re: 24/7 -Task Chair <br />Mid Back, large Seat, Swing Arms, Multi -tilt mechanism, 5" Cylinder Slide, Weight rated to 350lb,. <br />Task Chair <br />FINISH: BaIIInN Black (Upholstery), Black (Frame/Base) <br />Reports: <br />151, 16Z 163,164 <br />L <br />^-C AuvtRlel <br />FLOORING: Carpet, Hard Casters 1 — :36p�11-*tladepIn <br />4 <br />$699.73 <br />$2,796.52 <br />"j SsdeperMderuygk <br />. Seatratrendon <br />- <br />- klfnhe adjust knvard tihcrop <br />Sat Ader <br />Tull <br />Neutral Posture: Optional Cylinder <br />gliner <br />7" Dual Stage Minder available, approximate seat height range will be 20.98-27.00 <br />4 <br />$27.33 <br />$109.32 <br />Neutral Posture: Ccal, Mid Back <br />Mid Back, large Seat, Swing Arms, S" Cylinder, Weight rated W 2501bs. <br />FINISH: 5pardling. Black (Vinyl), Black (Frame/Base) <br />Curl Room <br />FLOORING: Carpet Forwardptw SinsciwRl <br />12 <br />$604.72 <br />$7,255.64 <br />159 <br />Y <br />�i - Swivelail <br />I <br />{� ` • Prw•r 11 seal height <br />ly <br />• Sat fill tension <br />T.�s'; <br />Backangk <br />Sextant. <br />• Brckaosea[dh.2:1 <br />• Antl-kickult-lock <br />OFS <br />Intemrls Conference Table S4"a 168' <br />2-Plece Top, Woodgraln Laminate Top and Slab Bases. <br />cord Room <br />159 <br />FINISH: Slenna JHPL- Top &easel <br />1 <br />$2,979.10 <br />52,979.10 <br />NOTES: Price includes (1) Held Cuts for AV Vendor's table technology device- installed by AV Vendor. <br />Haworth <br />live, 24" T 66", Post Leg, laminate Top, 3mm Edgeband, Painted Base, Casters <br />Roll Call Table <br />FINISH: -Patterned Linen Classic, H-P2 (Laminate Top), Patterned Linen Classic, HP-P2(Edgeband), Metallic Silver, TR-LE <br />265 <br />1 <br />(Painted Base) <br />a <br />$286.99 <br />$2,295.92 <br />l <br />TO <br />Nucleus Multi -Purpose Chair, Armless, Hard Oster(HNG-N-H-IM-NTSO) .Al <br />wl <br />FINISH: Gid A, NT10, Black <br />Roll Call chair <br />165 <br />FLOORING: Carpet <br />1 <br />14 <br />$350.00 <br />$4,900.00 <br />NOTES: Ofent has (2) edsNnp choirs - addfng (14f new to room. <br />N110 <br />Phase 2, Floor l- Public Safety SUBTOTAL: $20,237.50 <br />