Laserfiche WebLink
04-Nov-20 <br />14-Oct-20 <br />City of Elk River <br />Public Safety & FS3 <br />Draft Soft Cost <br />Item <br />Budget Comments <br />1 <br />CM Pre Construction <br />$0 <br />In construction cost <br />2 <br />Architect Fees <br />A/E Fees paid under separate budget <br />3 <br />Architect Reimbursable Fees <br />4 <br />Bonding <br />Covered in bonding <br />6 <br />Commissioning <br />$60,000 <br />Both facilities <br />7 <br />Construction & Design Contingency <br />$0 <br />In estimate <br />8 <br />Owner Misc. Contingency (fiber relocate PSB) <br />$50,000 <br />Includes $150/mo for inpound storage <br />9 <br />Survey <br />$0 <br />In BKV services <br />10 <br />Storm Water Design <br />$0 <br />In BKV services <br />11 <br />Wetlands <br />$0 <br />In BKV services <br />12 <br />Furniture <br />$300,000 <br />Fluid to confirm by 10/15/2020 <br />13 <br />Special Inspections <br />$70,000 <br />14 <br />Geotech report <br />$9,420 <br />Actual cost <br />15 <br />Interior signage for offices only <br />$5,000 <br />By City <br />16 <br />Appliances <br />$50,000 <br />To be verified <br />17 <br />Legal <br />$4,000 <br />18 <br />Moving <br />$0 <br />NOT APPLICABLE <br />19 <br />Remediation (soil, bldg., r.a.p.) <br />$0 <br />not required <br />20 <br />SAC, surcharge, permitting (Fire Statin 3 only, PSB savings) <br />$104,035 <br />21 <br />22 <br />23 <br />Low voltage, AV, card readers and cameras <br />$250,000 <br />for both buildings <br />24 <br />$0 <br />25 <br />Telephone equip/system <br />1 $5,000 <br />10 phones at FS3 <br />26 <br />Exercise Equipment <br />$01 <br />not required <br />