My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
8.2. SR 02-01-2021
ElkRiver
>
City Government
>
City Council
>
Council Agenda Packets
>
2021 - 2030
>
2021
>
02-01-2021
>
8.2. SR 02-01-2021
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/2/2021 11:05:08 AM
Creation date
1/29/2021 10:18:08 AM
Metadata
Fields
Template:
City Government
type
SR
date
2/1/2021
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
75
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
BKV <br />G R O U P <br />Date: January 07, 2021 <br />TO: Prospective Bidders <br />FROM: Michael Healy, AIA <br />BKV Group <br />222 North 2nd St Suite 101 <br />Minneapolis, MN 55401 <br />ADDENDUM #2 <br />For: Specifications and Drawings for Construction of: <br />Project: ELK RIVER FIRE STATION No. 3 <br />BKV Group Project Number: 2368.01 <br />This addendum forms a part of the Contract Documents and modifies the original Bidding Documents dated December 16, 2020 <br />as noted below. The Bidder shall acknowledge receipt of this Addendum in the space provided on the Bid Form. Failure to do so <br />may subject the Bidder to disqualification. <br />This Addendum consists of a total of (786) pages which includes this narrative, and related attachments. <br />1) GENERAL INFORMATION <br />a) Questions & Answers <br />1. Question #1: Are combined bids for more than one bid category acceptable? <br />(1) Answer #1: No. Please submit each bid for one corresponding bid category. If you wish to bid multiple bid <br />categories, submit a separate bid in a sealed envelope for each individual bid category you choose to bid. <br />2. Question #2: Is this project Tax Exempt? <br />(1) Answer #2: No. Taxes are to be included in the base bid. However there is a line item on the bid form to <br />identify the amount of taxes that are included in the base bid. <br />3. Question #3: Are prevailing wages required? <br />(1) Answer #3: No <br />4. Question #4: Who will be responsible for construction staking & surveying? <br />(1) Answer #4: The Construction Manager will retain the services of a professional surveyor to complete the <br />construction staking and surveying required. <br />5. Question #5: Can we email our bids to you? <br />(1) Answer #5: No. Bids must be submitted in sealed envelopes, using the bid form in section 00 4113 and <br />delivered to the location identified in Section 00 1113 Advertisement for Bids. <br />Architecture Interior Design Landscape Architecture Engineering <br />Phone: 6 12.339.3752 Fax: 612.339.6212 www.bkvgroup.com <br />Enriching Lives and Strengthening Communities <br />1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.