Laserfiche WebLink
Terra Prq ect Number 20.700 <br />Terra <br />Elk River Public Safety Building Expansion <br />Ml <br />_0rJ5Tnt.`'-T 0. City of Elk River <br />CONTINUATION SHEET AIA DOCUMENT G 703 <br />AIA Document G702, APPLICATION AND CERTIFICATION FOR PAYMENT, containing APPLICATION NO: 2 <br />Contractor's signed certification is attached. APPLICATION DATE: 10/14/20 <br />In tabulations below, amounts are stated to the nearest dollar. PERIOD TO: 11/30/20 <br />A_F <br />A.1 <br />B <br />C <br />CA <br />G2 <br />G3 <br />D E <br />F <br />G <br />H <br />I <br />SUBCONTRACTOR <br />ITEM <br />BID <br />DESCRIPTION OF WORK <br />SCHEDULED <br />CHANGE <br />BUDGET <br />REVISED <br />WORK COMPLETED <br />MATERIALS <br />TOTAL <br />% <br />BALANCE <br />RETAINAGE <br />VENDOR <br />NO. <br />PACK <br />VALUE <br />ORDERS <br />REVISION/ <br />SCHEDULED <br />PRESENTLY <br />COMPLETED <br />(G=C) <br />TO FINISH <br />FROM PREVIOUS <br />THIS PERIOD <br />EMPLOYEE <br />NO. <br />CONTINGENCY <br />VALUE <br />APPLICATION <br />STORED <br />AND STORED <br />(C -G) <br />COST <br />TRANSFER <br />(D+E) <br />(NOT IN <br />TO DATE <br />CODE <br />DOR E) <br />(D+E+F) <br />Quality Drywall <br />09-9250 <br />9A <br />Metal Framing <br />Labor <br />$ 45,000.00 <br />$ - <br />$ - <br />$ 45,000.00 <br />$ - <br />$ - <br />$ - <br />0.00% <br />$ 45,000.00 <br />$ <br />Quality Drywall <br />09-9250 <br />9A <br />Metal Framing <br />Material <br />$ 12,000.00 <br />$ - <br />$ - <br />$ 12,000.00 <br />$ - <br />$ - <br />$ - <br />0.00% <br />$ 12,000.00 <br />$ <br />Quality Drywall <br />09-9250 <br />9A <br />Drywall <br />Labor <br />$ 60,000.00 <br />$ - <br />$ - <br />$ 60,000.00 <br />$ - <br />$ - <br />$ - <br />0.00% <br />$ 60,000.00 <br />$ <br />Quality Drywall <br />09-9250 <br />9A <br />Drywall <br />Material <br />$ 20,000.00 <br />$ - <br />$ - <br />$ 20,000.00 <br />$ - <br />$ - <br />$ - <br />0.00% <br />$ 20,000.00 <br />$ <br />Quality Drywall <br />09-9250 <br />9A <br />Taping <br />Labor <br />$ 20,000.00 <br />$ - <br />$ - <br />$ 20,000.00 <br />$ - <br />$ - <br />$ - <br />0.00% <br />$ 20,000.00 <br />$ <br />Quality Drywall <br />09-9250 <br />9A <br />Taping <br />Material <br />$ 4,000.00 <br />$ - <br />$ - <br />$ 4,000.00 <br />$ - <br />$ - <br />$ - <br />0.00% <br />$ 4,000.00 <br />$ <br />Quality Drywall <br />09-9250 <br />9A <br />EIFS <br />Labor <br />$ 15,000.00 <br />$ - <br />$ - <br />$ 15,000.00 <br />$ - <br />$ - <br />$ - <br />0.00% <br />$ 15,000.00 <br />$ <br />Quality Drywall <br />09-9250 <br />9A <br />EIFS <br />Material <br />$ 8,000.00 <br />$ - <br />$ - <br />$ 8,000.00 <br />$ - <br />$ - <br />$ - <br />0.00% <br />$ 8,000.00 <br />$ <br />Quality Drywall <br />09-9250 <br />9A <br />Allowance <br />$ 7,000.00 <br />$ - <br />$ - <br />$ 7,000.00 <br />$ - <br />$ - <br />$ - <br />0.00% <br />$ 7,000.00 <br />$ - <br />Mid -State Tile <br />09-9300 <br />9B <br />Tile Labor <br />$ 19,311.00 <br />$ - <br />$ - <br />$ 19,311.00 <br />$ - <br />$ - <br />$ - <br />0.00% <br />$ 19,311.00 <br />$ - <br />Mid -State Tile <br />09-9300 <br />9B <br />Tile Materials <br />$ 17,693.00 <br />$ - <br />$ - <br />$ 17,693.00 <br />$ - <br />$ - <br />$ - <br />0.00% <br />$ 17,693.00 <br />$ - <br />Mid -State Tile <br />09-9300 <br />9B <br />Bond <br />$ 800.00 <br />$ - <br />$ - <br />$ 800.00 <br />$ - <br />$ - <br />$ - <br />0.00% <br />$ 800.00 <br />$ - <br />Mid -State Tile <br />09-9300 <br />9B <br />Area B- Upper(212, 220, 221) <br />Labor <br />$ 8,307.00 <br />$ - <br />$ - <br />$ 8,307.00 <br />$ - <br />$ - <br />$ - <br />0.00% <br />$ 8,307.00 <br />$ - <br />Mid -State Tile <br />09-9300 <br />9B <br />Area B- Lower (150) <br />Material <br />$ 300.00 <br />$ - <br />$ - <br />$ 300.00 <br />$ - <br />$ - <br />$ - <br />0.00% <br />$ 300.00 <br />$ - <br />Twin City Acoustics <br />09-9510 <br />9C <br />ACT <br />$ 34,700.00 <br />$ - <br />$ - <br />$ 34,700.00 <br />$ - <br />$ - <br />$ - <br />0.00% <br />$ 34,700.00 <br />$ - <br />Carpet& Resilient(TED) <br />09-9680 <br />9D <br />Flooring <br />$ 52,125.00 <br />$ - <br />$ - <br />$ 52,125.00 <br />$ - <br />$ - <br />$ - <br />0.00% <br />$ 52,125.00 <br />$ - <br />Surface Pro's <br />09-9671 <br />9E <br />Resinous Flooring <br />$ 98,912.50 <br />$ - <br />$ - <br />$ 98,912.50 <br />$ - <br />$ - <br />$ - <br />0.00% <br />$ 98,912.50 <br />$ - <br />Virnig Painting <br />09-9900 <br />9F <br />Painting <br />$ 107,444.00 <br />$ - <br />$ - <br />$ 107,444.00 <br />$ - <br />$ - <br />$ - <br />0.00% <br />$ 107,444.00 <br />$ - <br />Precise Heating <br />15-1500 <br />22A <br />Performance Bond HVAC <br />$ 5,596.00 <br />$ - <br />$ - <br />$ 5,596.00 <br />$ - <br />$ 5,596.00 <br />$ 5,596.00 <br />100.00% <br />$ - <br />$ 279.80 <br />Precise Heating <br />15-1500 <br />22A <br />Performance Bond Plumbing <br />$ 2,143.00 <br />$ - <br />$ - <br />$ 2,143.00 <br />$ - <br />$ 2,143.00 <br />$ 2,143.00 <br />100.00% <br />$ - <br />$ 107.15 <br />Precise Heating <br />15-1500 <br />22A <br />PD HVAC <br />Material <br />$ 317,077.00 <br />$ - <br />$ - <br />$ 317,077.00 <br />$ - <br />$ - <br />$ - <br />0.00% <br />$ 317,077.00 <br />$ - <br />Precise Heating <br />15-1500 <br />22A <br />PD HVAC <br />Labor <br />$ 103,400.00 <br />$ - <br />$ - <br />$ 103,400.00 <br />$ - <br />$ - <br />$ - <br />0.00% <br />$ 103,400.00 <br />$ - <br />Precise Heating <br />15-1500 <br />22A <br />FD HVAC <br />Material <br />$ 240,627.00 <br />$ - <br />$ - <br />$ 240,627.00 <br />$ - <br />$ - <br />$ - <br />0.00% <br />$ 240,627.00 <br />$ - <br />Precise Heating <br />15-1500 <br />22A <br />FD HVAC <br />Labor <br />$ 79,400.00 <br />$ - <br />$ - <br />$ 79,400.00 <br />$ - <br />$ 15,261.00 <br />$ 15,261.00 <br />19.22% <br />$ 64,139.00 <br />$ 763.05 <br />Precise Heating <br />15-1500 <br />22A <br />PD Plumbing <br />Material <br />$ 83,618.00 <br />$ - <br />$ - <br />$ 83,618.00 <br />$ - <br />$ - <br />$ - <br />0.00% <br />$ 83,618.00 <br />$ - <br />Precise Heating <br />15-1500 <br />22A <br />PD Plumbing <br />Labor <br />$ 47,650.00 <br />$ - <br />$ - <br />$ 47,650.00 <br />$ - <br />$ - <br />$ - <br />0.00% <br />$ 47,650.00 <br />$ - <br />Precise Heating <br />15-1500 <br />22A <br />FD Plumbing <br />Material <br />$ 93,549.00 <br />$ - <br />$ - <br />$ 93,549.00 <br />$ - <br />$ - <br />$ - <br />0.00% <br />$ 93,549.00 <br />$ - <br />Precise Heating <br />15-1500 <br />22A <br />FD Plumbing <br />Labor <br />$ 58,780.00 <br />$ - <br />$ - <br />$ 58,780.00 <br />$ - <br />$ - <br />$ - <br />0.00% <br />$ 58,780.00 <br />$ - <br />Precise Heating <br />15-1500 <br />22A <br />ADD Alt#3 RTU Replacement <br />Material <br />$ 100,200.00 <br />$ - <br />$ - <br />$ 100,200.00 <br />$ - <br />$ - <br />$ - <br />0.00% <br />$ 100,200.00 <br />$ - <br />Precise Heating <br />15-1500 <br />22A <br />ADD Alt#3 RTU Replacement <br />Labor <br />$ 2,800.00 <br />$ - <br />$ - <br />$ 2,800.00 <br />$ - <br />$ - <br />$ - <br />0.00% <br />$ 2,800.00 <br />$ - <br />Summit Fire <br />15-1533 <br />21A <br />Police Labor <br />$ 22,500.00 <br />$ - <br />$ - <br />$ 22,500.00 <br />$ - <br />$ - <br />$ - <br />0.00% <br />$ 22,500.00 <br />$ - <br />Summit Fire <br />15-1533 <br />21A <br />Police Material <br />$ 12,100.00 <br />$ - <br />$ - <br />$ 12,100.00 <br />$ - <br />$ - <br />$ - <br />0.00% <br />$ 12,100.00 <br />$ - <br />Summit Fire <br />15-1533 <br />21A <br />Fire Labor <br />$ 11,500.00 <br />$ - <br />$ - <br />$ 11,500.00 <br />$ - <br />$ 11,500.00 <br />$ 11,500.00 <br />100.00% <br />$ - <br />$ 575.00 <br />Summit Fire <br />15-1533 <br />21A <br />Fire Material <br />$ 6,200.00 <br />$ - <br />$ - <br />$ 6,200.00 <br />$ - <br />$ - <br />$ - <br />0.00% <br />$ 6,200.00 <br />$ - <br />Klein Electric <br />16-1600 <br />26A <br />Mobilization <br />$ 17,328.00 <br />$ - <br />$ - <br />$ 17,328.00 <br />$ - <br />$ 1,733.00 <br />$ 1,733.00 <br />10.00% <br />$ 15,595.00 <br />$ 86.65 <br />Klein Electric <br />16-1600 <br />26A <br />Permit/Bond <br />$ 4,500.00 <br />$ - <br />$ - <br />$ 4,500.00 <br />$ - <br />$ 4,500.00 <br />$ 4,500.00 <br />100.00% <br />$ - <br />$ 225.00 <br />Klein Electric <br />16-1600 <br />26A <br />Exterior Temp Services/Job Trailer Temp Power <br />$ 1,500.00 <br />$ - <br />$ - <br />$ 1,500.00 <br />$ - <br />$ 1,500.00 <br />$ 1,500.00 <br />100.00% <br />$ - <br />$ 75.00 <br />Klein Electric <br />16-1600 <br />26A <br />Switchgear/Panels/Border States Electric <br />$ 4,737.00 <br />$ - <br />$ - <br />$ 4,737.00 <br />$ - <br />$ - <br />$ - <br />0.00% <br />$ 4:737.00 <br />$ - <br />Klein Electric <br />16-1600 <br />26A <br />Light Fixtures/Controls/Werener Electric Co. <br />$ 109,114.00 <br />$ - <br />$ - <br />$ 109,114.00 <br />$ - <br />$ - <br />$ - <br />0.00% <br />$ 109114.00 <br />$ - <br />Page 3 / 6 SPC East Sower - Terra Pay App <br />