Laserfiche WebLink
Terra Prq ect Number 20.700 <br />Terra <br />Elk River Public Safety Building Expansion <br />-oevrT^'-`'-T'-'=- City of Elk River <br />CONTINUATION SHEET AIA DOCUMENT G 703 <br />AIA Document G702, APPLICATION AND CERTIFICATION FOR PAYMENT, containing APPLICATION NO: 2 <br />Contractor's signed certification is attached. APPLICATION DATE: 10/14/20 <br />In tabulations below, amounts are stated to the nearest dollar. PERIOD TO: 11/30/20 <br />A_F <br />A.1 <br />B <br />C <br />CA <br />G2 <br />G3 <br />D E <br />F <br />G <br />H <br />I <br />SUBCONTRACTOR <br />ITEM <br />BID <br />DESCRIPTION OF WORK <br />SCHEDULED <br />CHANGE <br />BUDGET <br />REVISED <br />WORK COMPLETED <br />MATERIALS <br />TOTAL <br />% <br />BALANCE <br />RETAINAGE <br />VENDOR <br />NO. <br />PACK <br />VALUE <br />ORDERS <br />REVISION/ <br />SCHEDULED <br />PRESENTLY <br />COMPLETED <br />(G=C) <br />TO FINISH <br />FROM PREVIOUS <br />THIS PERIOD <br />EMPLOYEE <br />NO. <br />CONTINGENCY <br />VALUE <br />APPLICATION <br />STORED <br />AND STORED <br />(C -G) <br />COST <br />TRANSFER <br />(D+E) <br />(NOT IN <br />TO DATE <br />CODE <br />DOR E) <br />(D+E+F) <br />Patriot Erectors <br />05-5121 <br />5B <br />PD- Structural Steel <br />Labor <br />$ 8,362.00 <br />$ - <br />$ - <br />$ 8,362.00 <br />$ - <br />$ - <br />0.00% <br />$ 8,362.00 <br />$ - <br />Patriot Erectors <br />05-5121 <br />5B <br />PD- Steel Joist <br />Labor <br />$ 6,500.00 <br />$ - <br />$ - <br />$ 6,500.00 <br />$ - <br />$ - <br />0.00% <br />$ 6,500.00 <br />$ - <br />Patriot Erectors <br />05-5121 <br />5B <br />PD- Steel Roof Deck <br />Labor <br />$ 7,500.00 <br />$ - <br />$ - <br />$ 7,500.00 <br />$ - <br />$ - <br />0.00% <br />$ 7,500.00 <br />$ - <br />Patriot Erectors <br />05-5121 <br />5B <br />PD- Metal Fab <br />Labor <br />$ 4,500.00 <br />$ - <br />$ - <br />$ 4,500.00 <br />$ - <br />$ - <br />0.00% <br />$ 4,500.00 <br />$ - <br />Patriot Erectors <br />05-5121 <br />5B <br />PD- Metal Stairs <br />Labor <br />$ - <br />$ - <br />$ - <br />$ - <br />$ - <br />$ - <br />#DIV/01 <br />$ - <br />$ - <br />Patriot Erectors <br />05-5121 <br />5B <br />PD- Pipe &Tube Railings <br />Labor <br />$ - <br />$ - <br />$ - <br />$ - <br />$ - <br />$ - <br />#DIV/01 <br />$ - <br />$ <br />Patriot Erectors <br />05-5121 <br />5B <br />FD- Structural Steel <br />Labor <br />$ 2,780.00 <br />$ - <br />$ - <br />$ 2,780.00 <br />$ - <br />$ - <br />$ - <br />0.00% <br />$ 2,780.00 <br />$ <br />Patriot Erectors <br />05-5121 <br />5B <br />FD-Steel Joist <br />Labor <br />$ 2,000.00 <br />$ - <br />$ - <br />$ 2,000.00 <br />$ - <br />$ - <br />0.00% <br />$ 2,000.00 <br />$ - <br />Patriot Erectors <br />05-5121 <br />5B <br />FD-Steel Roof Deck <br />Labor <br />$ 4,000.00 <br />$ - <br />$ - <br />$ 4,000.00 <br />$ - <br />$ - <br />0.00% <br />$ 4,000.00 <br />$ <br />Patriot Erectors <br />05-5121 <br />5B <br />FD-Metal Fab <br />Labor <br />$ 1,750.00 <br />$ - <br />$ - <br />$ 1,750.00 <br />$ - <br />$ - <br />0.00% <br />$ 1,750.00 <br />$ <br />Patriot Erectors <br />05-5121 <br />5B <br />FD-Metal Stairs <br />Labor <br />$ 1,600.00 <br />$ - <br />$ - <br />$ 1,600.00 <br />$ - <br />$ - <br />$ - <br />0.00% <br />$ 1,600.00 <br />$ <br />Patriot Erectors <br />05-5121 <br />5B <br />FD- Pipe&Tube Railings <br />Labor <br />$ 1,500.00 <br />$ - <br />$ - <br />$ 1,500.00 <br />$ - <br />$ - <br />$ - <br />0.00% <br />$ 1,500.00 <br />$ - <br />Patriot Erectors <br />05-5121 <br />5B <br />Bond <br />$ 658.00 <br />$ - <br />$ - <br />$ 658.00 <br />$ - <br />$ - <br />0.00% <br />$ 658.00 <br />$ - <br />Century Construction <br />06-6100 <br />6A <br />Area A FD Addition Envelop <br />$ 11,000.00 <br />$ - <br />$ - <br />$ 11,000.00 <br />$ - <br />$ 3,000.00 <br />$ 3,000.00 <br />27.27% <br />$ 8,000.00 <br />$ 150.00 <br />Century Construction <br />06-6100 <br />6A <br />Area A FD Addition Interior <br />$ 10,200.00 <br />$ - <br />$ - <br />$ 10,200.00 <br />$ - <br />$ - <br />$ - <br />0.00% <br />$ 10,200.00 <br />$ - <br />Century Construction <br />06-6100 <br />6A <br />Area A FD Renovation <br />$ 17,000.00 <br />$ - <br />$ - <br />$ 17,000.00 <br />$ - <br />$ - <br />$ - <br />0.00% <br />$ 17,000.00 <br />$ <br />Century Construction <br />06-6100 <br />6A <br />Area C PD Addition Envelope <br />$ 18,000.00 <br />$ - <br />$ - <br />$ 18,000.00 <br />$ - <br />$ - <br />$ - <br />0.00% <br />$ 18,000.00 <br />$ <br />Century Construction <br />06-6100 <br />6A <br />Area C PD Addition Interior <br />$ 3,000.00 <br />$ - <br />$ - <br />$ 3,000.00 <br />$ - <br />$ - <br />$ - <br />0.00% <br />$ 3,000.00 <br />$ - <br />Century Construction <br />06-6100 <br />6A <br />Area C PD Renovation <br />$ 10,300.00 <br />$ - <br />$ - <br />$ 10,300.00 <br />$ - <br />$ - <br />$ - <br />0.00% <br />$ 10,300.00 <br />$ - <br />Century Construction <br />06-6100 <br />6A <br />Area B PD Phase 1 <br />$ 15,000.00 <br />$ - <br />$ - <br />$ 15,000.00 <br />$ - <br />$ - <br />$ - <br />0.00% <br />$ 15,000.00 <br />$ - <br />Century Construction <br />06-6100 <br />6A <br />Area B PD Phase 2 <br />$ 14,000.00 <br />$ - <br />$ - <br />$ 14,000.00 <br />$ - <br />$ - <br />$ - <br />0.00% <br />$ 14,000.00 <br />$ - <br />Century Construction <br />06-6100 <br />6A <br />Alternate #1 - LL Area B <br />$ 2,000.00 <br />$ - <br />$ - <br />$ 2,000.00 <br />$ - <br />$ - <br />$ - <br />0.00% <br />$ 2,000.00 <br />$ - <br />Century Construction <br />06-6100 <br />6A <br />Performance and Payment Bond <br />$ 4,500.00 <br />$ - <br />$ - <br />$ 4,500.00 <br />$ - <br />$ 4,500.00 <br />$ 4,500.00 <br />100.00% <br />$ - <br />$ 225.00 <br />Century Construction <br />06-6100 <br />6A <br />Allowance <br />$ 10,000.00 <br />$ - <br />$ - <br />$ 10,000.00 <br />$ - <br />$ - <br />$ - <br />0.00% <br />$ 10,000.00 <br />$ - <br />Century Construction <br />06-6100 <br />6A <br />Area A Materials <br />$ 12,500.00 <br />$ - <br />$ - <br />$ 12,500.00 <br />$ - <br />$ 3,000.00 <br />$ 3,000.00 <br />24.00% <br />$ 9,500.00 <br />$ 150.00 <br />Century Construction <br />06-6100 <br />6A <br />Area B Materials <br />$ 14,000.00 <br />$ - <br />$ - <br />$ 14,000.00 <br />$ - <br />$ - <br />$ - <br />0.00% <br />$ 14,000.00 <br />$ - <br />Century Construction <br />06-6100 <br />6A <br />Area C Materials <br />$ 12,500.00 <br />$ - <br />$ - <br />$ 12,500.00 <br />$ - <br />$ - <br />$ - <br />0.00% <br />$ 12,500.00 <br />$ - <br />Casework(TED) <br />06-6200 <br />6B <br />Casework <br />$ 83,750.00 <br />$ - <br />$ - <br />$ 83,750.00 <br />$ - <br />$ - <br />$ - <br />0.00% <br />$ 83,750.00 <br />$ - <br />Structural Applicators <br />07-7210 <br />7C <br />Fluid Applied Air Barriers <br />$ 14,696.00 <br />$ - <br />$ - <br />$ 14,696.00 <br />$ - <br />$ - <br />$ - <br />0.00% <br />$ 14,696.00 <br />$ - <br />John A Dalsin <br />07-7510 <br />7A <br />Roofing <br />$ 236,246.00 <br />$ - <br />$ - <br />$ 236,246.00 <br />$ - <br />$ - <br />$ - <br />0.00% <br />$ 236,246.00 <br />$ - <br />Lake Area Roofing <br />07-7412 <br />7B <br />Metal Wall Panels <br />$ 17,881.00 <br />$ - <br />$ - <br />$ 17,881.00 <br />$ - <br />$ - <br />0.00% <br />$ 17,881.00 <br />$ - <br />Waumadee Creek <br />07-7900 <br />7D <br />Sealants <br />$ 39,684.00 <br />$ - <br />$ - <br />$ 39,684.00 <br />$ - <br />$ - <br />$ - <br />0.00% <br />$ 39,684.00 <br />$ - <br />Mid -Central Door <br />08-8200 <br />8A <br />Doors and Frames <br />$ 86,245.00 <br />$ - <br />$ - <br />$ 86,245.00 <br />$ - <br />$ - <br />$ - <br />0.00% <br />$ 86,245.00 <br />$ - <br />Crawford Doors <br />08-8361 <br />8B <br />OH Doors <br />$ 124,800.00 <br />$ - <br />$ - <br />$ 124,800.00 <br />$ - <br />$ - <br />$ - <br />0.00% <br />$ 124,800.00 <br />$ - <br />Heartland Glass <br />08-8800 <br />8C <br />Aluminum, Glass and Glazing <br />$ 67,934.00 <br />$ - <br />$ - <br />$ 67,934.00 <br />$ - <br />$ - <br />$ - <br />0.00% <br />$ 67,934.00 <br />$ - <br />Quality Drywall <br />09-9250 <br />9A <br />Mobilization <br />$ 5,000.00 <br />$ - <br />$ - <br />$ 5,000.00 <br />$ - <br />$ - <br />$ - <br />0.00% <br />$ 5,000.00 <br />$ - <br />Pace 2 / 6 SPC East Sower - Terra Pay App <br />