Laserfiche WebLink
<br />Contractor’s design professional, provided the submittals bear such professional’s seal and signature when submitted <br />to the Architect. The Architect’s review shall be for the limited purpose of checking for conformance with information <br />given and the design concept expressed in the Contract Documents. The Architect shall be entitled to rely upon, and <br />shall not be responsible for, the adequacy and accuracy of the services, certifications, and approvals performed or <br />provided by such design professionals. <br />§ 3.6.4.4 Subject to Section 4.2, the Architect shall review and respond to requests for information about the Contract <br />Documents. The Architect shall set forth, in the Contract Documents, the requirements for requests for information. <br />Requests for information shall include, at a minimum, a detailed written statement that indicates the specific Drawings <br />or Specifications in need of clarification and the nature of the clarification requested. The Architect’s response to such <br />requests shall be made in writing within any time limits agreed upon, or otherwise with reasonable promptness. If <br />appropriate, the Architect shall prepare and issue supplemental Drawings and Specifications in response to the <br />requests for information. <br />§ 3.6.4.5 The Architect shall maintain a record of submittals and copies of submittals supplied by the Contractor in <br />accordance with the requirements of the Contract Documents. <br />§ 3.6.5 Changes in the Work <br />(Paragraphs deleted) <br />§ 3.6.5.1 The Architect may order minor changes in the Work that are consistent with the intent of the Contract <br />Documents and do not involve an adjustment in the Contract Sum or an extension of the Contract Time. Subject to <br />Section 4.2, the Architect shall prepare Change Orders and Construction Change Directives for the Owner’s approval <br />and execution in accordance with the Contract Documents. <br />§ 3.6.5.2 The Architect shall maintain records relative to changes in the Work. <br />§ 3.6.6 Project Completion <br />(Paragraphs deleted) <br />§ 3.6.6.1 The Architect shall: <br />.1 conduct inspections to determine the date or dates of Substantial Completion and the date of final <br />completion; <br />.2 issue Certificates of Substantial Completion; <br />.3 forward to the Owner, for the Owner’s review and records, written warranties and related documents <br />required by the Contract Documents and received from the Contractor; and, <br />.4 issue a final Certificate for Payment based upon a final inspection indicating that, to the best of the <br />Architect’s knowledge, information, and belief, the Work complies with the requirements of the <br />Contract Documents. <br />§ 3.6.6.2 The Architect’s inspections shall be conducted with the Owner to check conformance of the Work with the <br />requirements of the Contract Documents and to verify the accuracy and completeness of the list submitted by the <br />Contractor of Work to be completed or corrected. <br />§ 3.6.6.3 When Substantial Completion has been achieved, the Architect shall inform the Owner about the balance of <br />the Contract Sum remaining to be paid the Contractor, including the amount to be retained from the Contract Sum, if <br />any, for final completion or correction of the Work. <br />§ 3.6.6.4 The Architect shall forward to the Owner the following information received from the Contractor: (1) consent <br />of surety or sureties, if any, to reduction in or partial release of retainage or the making of final payment; (2) affidavits, <br />receipts, releases and waivers of liens, or bonds indemnifying the Owner against liens; and (3) any other <br />documentation required of the Contractor under the Contract Documents. <br />§ 3.6.6.5 Prior to the expiration of one year from the date of Substantial Completion, the Architect shall, without <br />additional compensation, conduct a meeting with the Owner to review the facility operations and performance. <br />ARTICLE 4 SUPPLEMENTAL AND ADDITIONAL SERVICES <br />§ 4.1 Supplemental Services <br />§ 4.1.1 The services listed below are not included in Basic Services but may be required for the Project. The Architect <br /> ™ <br />AIA Document B101 Copyright © 1974, 1978, 1987, 1997, 2007 and 2017 by The American Institute of Architects. All rights reserved. The “American <br /> – 2017. <br />Init. <br /> Institute of Architects,” “AIA,” the AIA Logo, and “AIA Contract Documents” are registered trademarks and may not be used without permission. This document was <br />11 <br />produced by AIA software at 10:15:59 ET on 11/23/2020 under Order No.9712742774 which expires on 08/13/2021, is not for resale, is licensed for one-time use <br />® <br />/ <br />only, and may only be used in accordance with the AIA Contract Documents Terms of Service. To report copyright violations, e-mail copyright@aia.org. <br />User Notes: (1800630329) <br />135 <br />