My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
09-17-2020 HPC MIN
ElkRiver
>
City Government
>
Boards and Commissions
>
Heritage Preservation Commission
>
HPC Minutes
>
2011-2020
>
2020
>
09-17-2020 HPC MIN
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/30/2020 2:09:47 PM
Creation date
11/30/2020 2:09:33 PM
Metadata
Fields
Template:
City Government
type
HPM
date
9/17/2020
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Heritage Preservation Conunission Meeting <br />Ell: River City Hall <br />September 17, 2020 <br />funds from ERMU can also be sought. He stated the council will receive this <br />information October 5. <br />Mr. Carlton explained COVIDI9 extended the grant timeline until Fall 2021. The <br />contract states the contractor will give a 30 -day notice to begin work and once <br />starting will have a maximum of 45 days to complete work. He indicated additional <br />work needed to be done based upon the analysis done this summer and those items <br />included additional screening required on the east side near the townhomes due to <br />the lead-based paint, replacement of rust jacking plates, additional steel structural <br />work is required, and re -grading the base around the tower and even out the <br />sediment around the entire site. <br />Commissioner Mauren asked questions regarding the completion date to plan a <br />public event. <br />Commissioner Mortensen asked if the contractor was not approved. <br />Mr. Carlton explained Kodet will be reviewing the submitted bid documents and <br />because Elevation Painting was the apparent low bidder, there should not be any <br />reason for them not being approved unless some concern is found. <br />5.2 Discuss Website Articles <br />Mr. Carlton asked if the commission were fine with the draft article he sent which <br />submitted by Steve Rohlf. He stated he heard from a few and can incorporate those <br />comments to finalize the article. The commission agreed. <br />Chair Lindberg and Commissioner Mauren discussed changing the population figure <br />in the article. Commissioner Mauren stated Mr. Rohlf mentions the population figure <br />from an article published in 2001. Chair Lindberg stated he will obtain the census <br />figure from official census records and provide that to Mr. Carlton. <br />Mr. Carlton asked if there were any other articles available. <br />Chair Lindberg stated he will have a few to submit. <br />Commissioner Mauren indicated he will have an article written based upon a <br />documentary script and will submit it by year end. <br />5.3 Adopt HPC Bylaws <br />Mr. Carlton indicated he wanted the commission to do one final review of the <br />bylaws as updated at the last meeting, with the change in the number of seven <br />commissioners, with five being from Elk River and two being from either Elk River <br />or from outside the community. <br />Moved by Commissioner Mauren and seconded by Commissioner Griffiths to <br />approve the Heritage Preservation Bylaws with the change in 1.5) <br />
The URL can be used to link to this page
Your browser does not support the video tag.