My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
8.1. SR 11-16-2020
ElkRiver
>
City Government
>
City Council
>
Council Agenda Packets
>
2011 - 2020
>
2020
>
11-16-2020
>
8.1. SR 11-16-2020
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/13/2020 3:24:31 PM
Creation date
11/13/2020 2:20:27 PM
Metadata
Fields
Template:
City Government
type
SR
date
11/16/2020
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
74
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Architectural Design Services and Construction Support for the Expansion of the Elk River <br />Public Safety Building and Fire Station No. 3 Design/Construction <br />3. Review plans and specifications in detail with the Building Committee and authorities having <br />jurisdiction. <br />4. Analyze opportunities for energy efficiency in the design process. <br />5. List the specification, coordination and pricing of soft costs (furniture, fixtures, and <br />equipment) as an alternate fee in the proposal. <br />For the execution of this project, the successful firm is to provide services in each of the following <br />phases: Schematic Design, Design Development, Construction Documents, Bidding, and Construction <br />Administration. <br />General Instructions <br />Carefully read the information contained in this RFP and submit by certified mail a complete response <br />following all requirements, specifications, and directions to: <br />City of Elk River <br />Attn: Chief Dickinson / Chief Nierenhausen <br />13065 Orono Parkway NW <br />Elk River, MN 55330 <br />The submittals are to be received at the offices of the City of Elk River no later than 4:30 <br />p.m. on December 31, 2019. <br />Do not submit proposals to any other person or location by any other method. Note - <br />proposal must include: <br />1. Cover letter <br />2. Signed Respondent Proposal (Attachment A) <br />3. Reference list <br />4. Firm background and qualifications (Attachment B) <br />5. At least four examples of constructed public safety facilities that were designed by respondent. <br />Though not required, successful experience with remodeling of public safety facilities is <br />preferred. Therefore, any examples of this type of project should also be included. <br />6. Stated understanding of the project scope and your approach to integrating input. Describe in <br />detail your approach to the design process and working with the city for a product to present to <br />the City Council for approval of a final design and to authorize advertisement for bids. <br />Late submission: Late submissions will not be considered. <br />Unsigned submission: The Respondent's Proposal (Attachment A) must be signed by an authorized <br />representative of your company. Unsigned submissions will not be considered. <br />Required Pre -Proposal Meeting <br />A site visit will be held on November 1, 2019, at 1:00 p.m. in the Emergency Operations Center (13073 <br />Orono Pkwy, Elk River, MN). The site visit is mandatory and will provide an opportunity to ask <br />questions regarding the proposal requirements. <br />
The URL can be used to link to this page
Your browser does not support the video tag.