My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
8.1. SR 11-16-2020
ElkRiver
>
City Government
>
City Council
>
Council Agenda Packets
>
2011 - 2020
>
2020
>
11-16-2020
>
8.1. SR 11-16-2020
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/13/2020 3:24:31 PM
Creation date
11/13/2020 2:20:27 PM
Metadata
Fields
Template:
City Government
type
SR
date
11/16/2020
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
74
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PROJECT APPROACH <br />BKV <br />G R O U P <br />the design team will consciously adopt and internalize these goals, objectives, <br />expectations, and visions so that every decision we make aligns with our client's <br />best interests. <br />We clearly establish team member roles and responsibilities and publish a list of <br />contact information that can be referenced throughout the project. Finally, we <br />address schedule head-on by identifying all the project milestones and the critical <br />path tasks to establish an overall schedule that does not have to shift out as new <br />information arises. With these components in place, each individual should feel <br />that the team has listened to their concerns and addressed them in a manner <br />most appropriate for the good of the project. <br />MANAGE THE SCHEDULE <br />The schedule established during kickoff meeting an is reviewed at each workshop <br />to update the client on progress and make sure the entire team is working on the <br />precursors for the next critical milestones. <br />Taking schedule a step further, BKV Group has developed a Project Management <br />Plan (PMP), which lists and assigns a duration to each task the design team needs <br />to complete for each phase. This document helps us define the number of staff <br />members needed to complete the work within the project schedule. Based on <br />actual task completion, the PMP is updated throughout the phase and staffing <br />is adjusted if required. The PMPs for every project in the office link together to <br />provide management with an overview of projected staffing trends for the next six <br />months, which informs how we hire or adjust project schedules that are flexible. <br />MANAGE THE BUDGET <br />Our team has had a track record of developing projects that are on budget, <br />we have been successful in doing this through collaboration with the City, <br />Construction Manager and entire design team. Proactive review of the budget is <br />most successful when the estimator can reference more detail in early stages. We <br />utilize Building Information Modeling (BIM) even in the earliest phases. This results in <br />accurate counts of doors, windows, equipment, etc. that tie into a cost estimate. <br />Once a conceptual design and building assemblies are established during <br />schematic design, we use our BIM model with assembly construction cost data to validate the estimate with the <br />CM. The design is then checked in the DID and CD phases to confirm that the budget is maintained. We work with <br />the CM to price what is shown in the construction documents, checking those numbers against material takeoffs <br />from the BIM model and using any discrepancies to tighten our documentation. We also identify with the client and <br />CM possible bid alternates, this allows for flexibility during bidding. This level of detail and strategy has allowed BKV <br />Group to boast of our historic record of projects bidding between 0% and 5% below our estimates. <br />PROVIDE CLEAR AND TIMELY COMMUNICATION <br />Communication is critical to a successful project. We meet with the core team at the start to define a <br />communication plan for the project that includes expectations for meeting frequency, meeting minute dispersal, <br />project update emails, phase deliverables, and public outreach goals and strategies. <br />The communication plan is followed through with the entire design team and reviewed on a regular basis. All <br />phone calls, requests, and emails will receive a response within one business day of their receipt, and all members <br />of the design team are committed to being directly accessible to the owner's team throughout the project. We use <br />agendas to keep meetings on track and to allow all participants to prepare beforehand, and we use minutes to <br />track options, pros and cons, decisions and action items. <br />The nature of architecture means that a change to any aspect of the project has repercussions for other <br />systems. For each decision, the positives and negatives of each option with regards to cost, durability, energy <br />ENRICHING LIVES AND STRENGTHENING COMMUNITIES 1 48 <br />
The URL can be used to link to this page
Your browser does not support the video tag.