My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
4.5. SR 11-16-2020
ElkRiver
>
City Government
>
City Council
>
Council Agenda Packets
>
2011 - 2020
>
2020
>
11-16-2020
>
4.5. SR 11-16-2020
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/13/2020 12:06:27 PM
Creation date
11/13/2020 11:33:01 AM
Metadata
Fields
Template:
City Government
type
SR
date
11/16/2020
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
20
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PROJECT TASKS <br />The scope of special testing and inspection services for the project (Cost Proposal) will consist of: <br />SOIL TESTING: Four (4) soil samples are to be collected and returned to our soil laboratory for a <br />standard laboratory proctor test (ASTM D698) to determine maximum dry density. One (1) grain size <br />analysis test (Gradation) (ASTM C136) is to be conducted in accordance with the American Society <br />of Testing and Materials' procedures. Our engineering technicians will be on -site to conduct <br />observations of the excavation bottom to verify complete removal of unsuitable material to reach <br />suitable material and that excavations are kept from freezing. Periodic observation of the backfill <br />process and nuclear density tests (ASTM D6938) will be conducted to verify that all subgrade and <br />backfill material used consists of suitable soils and is properly placed and compacted. A total of fifty- <br />six (56) nuclear density tests are planned for the building and parking lot areas. <br />CONCRETE TESTING AND INSPECTIONS: A representative from our agency will attend the pre - <br />installation meeting for the cast -in -place concrete. The building related quality control services <br />consisting of determining air content, temperature, and slump of the concrete placed on -site will be <br />conducted on twenty (20) occasions (at a rate of one per 25 cubic yards and every 50 cubic yards <br />thereafter). In addition, at the time of the on -site concrete tests, four (4) specimens of the concrete <br />will be cast on -site, field cured for 24 hours, and then returned to our lab for standard curing and <br />compression (two (2) at 7 days and two (2) at 28 days) with an additional four (4) specimens to be <br />field cured and tested for compression (two (2) at 7 days and two (2) at 28 days) in our concrete lab. <br />The specimens will then be compressed as required to determine that the strength of the in -place <br />material is within MN/DOT and the American Concrete Institute standards and project specifications. <br />Continuous inspection of the concrete formwork and steel reinforcement (rebar) will be conducted to <br />verify that it is in accordance with the construction documents. Placement of the concrete will be <br />conducted. Verification that proper cold and hot weather practices are followed will also be provided. <br />MASONRY TESTING AND INSPECTIONS: A representative from our agency will attend the pre - <br />installation meeting for masonry construction. Tests and inspections will be conducted to ensure <br />compliance of masonry construction. Inspections related to masonry wall construction will include <br />mortar preparation and placement, grout preparation and placement, embed plate installation, and <br />reinforcing bar placement. The testing and inspection of non -load bearing walls and infills is not <br />required for this project. The sampling and testing of masonry grout will follow the guidelines of <br />ASTM C1019. Eight (8) grout tests and sets of specimens are planned to be taken throughout the <br />duration of the project. A set of four (4) grout samples will be collected during each day of grout <br />placement. These samples will be cured for 24 hours on site then collected by a representative to <br />transport to our facility for curing and compression at 7 and 28 days. <br />The sampling and testing of masonry mortar will follow the guidelines of ASTM C780. Three (3) <br />mortar tests and sets of specimens are planned to be taken throughout the duration of the project. A <br />set of three (3) mortar cubes will be collected at the time of each of the ordered tests. These <br />
The URL can be used to link to this page
Your browser does not support the video tag.