§ A.2.3 Substantial Completion <br />§ A.2.3.1 Subject to adjustments of the Contract Time as provided in the Contract Documents, the Construction Manager <br />shall achieve Substantial Completion of the entire Work: <br />(Check one of the following boxes and complete the necessary it for-mation) <br />[ ] Not later than ( ) calendar days from the date of commencement of the Work. <br />[ X ] By the following date: October 15, 2021 <br />§ A.2.3.2 Subject to adjustments of the Contract Time as provided in the Contract Documents, if portions of the Work are <br />to be completed prior to Substantial Completion of the entire Work, the Construction Manager shall achieve Substantial <br />Completion of such portions by the following dates: <br />Portion of Work Substantial Completion Date <br />§ A.2.3.31fthe Construction Manager fails to achieve Substantial Completion as provided in this Section A.2.3, liquidated <br />damages, if any, shall be assessed as set forth in Section 6.1.6 of the Agreement. <br />ARTICLE A.3 INFORMATION UPON WHICH AMENDMENT IS BASED <br />§ A.3.1 The Guaranteed Maximum Price and Contract Time set forth in this Amendment are based on the Contract <br />Documents and the following: <br />§ A.3.1.1 The following Supplementary and other Conditions of the Contract: <br />Document Title Date Pages <br />§ A.3.1.2 The following Specifications: <br />(Either list the Specifications here, or refer to an exhibit attached to this Amendment.) <br />Specifications Dated September 15, 2020 prepared by BKV Group <br />Addendum #1 Dated September 29, 2020 prepared by BKV Group <br />Addendum 42 Dated October 2, 2020 prepared by BKV Group <br />Addendum 43 Dated October 6, 2020 prepared by BKV Group <br />Addendum 44 Dated October 9, 2020 prepared by BKV Group <br />Section Title Date Pages <br />§ A.3.1.3 The following Drawings: <br />(Either list the Drawings here, or refer to an exhibit attached to this Amendment.) <br />Drawings Dated September 15, 2020 prepared by BKV Group <br />Addendum #1 Dated September 29, 2020 prepared by BKV Group <br />Addendum 42 Dated October 2, 2020 prepared by BKV Group <br />Addendum 43 Dated October 6, 2020 prepared by BKV Group <br />Addendum 44 Dated October 9, 2020 prepared by BKV Group <br />Number <br />Title Date <br />§ A.3.1.4 The Sustainability Plan, if any: <br />(If'the Owner identified a Sustainable Objective in the Owner's Criteria, identify the document or documents that <br />comprise the Sustainahility Plan by title, date and number of pages, and include other identifying infbrmation. The <br />Sustainahility Plan identifies and describes the Sustainable Objective; the targeted Sustainable Measures; <br />implementation strategies selected to achieve the Sustainable Measures; the Owner's and Construction Manager's roles <br />Init. AIA Document A133— — 2019 Exhibit A. Copyright 9 1991, 2003, 2009, and 2019 by The American Institute of Architects. All rights reserved. The "American <br />Institute of Architects," "AIA," the AIA Logo, and "AIA Contract Documents' are registered trademarks and may not be used without permission. This document was 3 <br />produced by AIA software at 11:52:13 CT on 10/15/2020 under Order No.6421824392 which expires on 04/24/2021, is not for resale, is licensed for one-time use <br />only, and may only be used in accordance with the AIA Contract Documents® Terms of Service. To report copyright violations, e-mail copyright@aia.org. <br />User Notes: (1196584039) <br />