$6,290,219.00 ), subject to additions and deductions by Change Order as provided in the Contract Documents. <br />§ A.1.1.2 Itemized Statement of the Guaranteed Maximum Price. Provided below is an itemized statement of the <br />Guaranteed Maximum Price organized by trade categories, including allowances; the Construction Manager's <br />contingency; alternates; the Construction Manager's Fee; and other items that comprise the Guaranteed Maximum Price <br />as defined in Section 3.2.1 of the Agreement. <br />(Provide itemized statement below or reference an attachment.) <br />See Attached Low Bid Summary — Exhibit 1 <br />§ A.1.1.3 The Construction Manager's Fee is set forth in Section 6.1.2 of the Agreement. <br />§ A.1.1.4 The method of adjustment of the Construction Manager's Fee for changes in the Work is set forth in Section <br />6.1.3 of the Agreement. <br />§ A.1.1.5 Alternates <br />§ A.1.1.5.1 Alternates, if any, included in the Guaranteed Maximum Price: <br />Item <br />Price <br />Alternate #1 <br />—Basement EOC Room <br />$10,340 <br />Alternate 43 — <br />RTU Replacement <br />$103,885 <br />Alternate 44 — <br />High Speed Doors <br />$46,000 <br />§ A.1.1.5.2 Subject to the conditions noted below, the following alternates may be accepted by the Owner following <br />execution of this Exhibit A. Upon acceptance, the Owner shall issue a Modification to the Agreement. <br />(Insert below each alternate and the conditions that must he met. for the Owner to accept the alternate.) <br />Item <br />Price <br />Conditions for Acceptance <br />§ A.1.1.6 Unit prices, if any: <br />(Identify the item and state the unit price and quantity limitations, if any, to which the unit price will he applicable.) <br />Item Units and Limitations Price per Unit ($0.00) <br />Unit Price 41: Remove Unsuitable Material Cubic Yards $15.00 <br />Unit Price 42: import and Place Select Cubic Yards $15.00 <br />Granular Material <br />ARTICLE A.2 DATE OF COMMENCEMENT AND SUBSTANTIAL COMPLETION <br />§ A.2.1 The date of commencement of the Work shall be: <br />(Check one of the following boxes.) <br />[ X ] The date of execution of this Amendment. <br />[ ] Established as follows: <br />(Insert a date or a means to determine the date of commencement of the Work) <br />If a date of commencement of the Work is not selected, then the date of commencement shall be the date of execution of <br />this Amendment. <br />§ A.2.2 Unless otherwise provided, the Contract Time is the period of time, including authorized adjustments, allotted in <br />the Contract Documents for Substantial Completion of the Work. The Contract Time shall be measured from the date of <br />commencement of the Work. <br />Init. AIA Document A133— — 2019 Exhibit A. Copyright © 1991, 2003, 2009, and 2019 by The American Institute of Architects. All rights reserved. The "American <br />Institute of Architects," "AIA," the AIA Logo, and "AIA Contract Documents' are registered trademarks and may not be used without permission. This document was 2 <br />produced by AIA software at 11:52:13 CT on 10/15/2020 under Order No.6421824392 which expires on 04/24/2021, is not for resale, is licensed for one-time use <br />only, and may only be used in accordance with the AIA Contract Documents® Terms of Service. To report copyright violations, e-mail copyright@aia.org. <br />User Notes: (1196584039) <br />