Laserfiche WebLink
<br />EXHIBIT H <br />GENERAL & SITE-SPECIFIC REQUIREMENTS <br /> <br />D. CONTRACTOR is not responsible for fixtures that are found to be damaged prior to commencement <br />of its Scope of Work. <br /> <br />E. All manufacturers’ warranties (and related information) will be transferred to CLIENT at project <br />close-out. <br /> <br />F. With respect to the specific lighting scope - CONTRACTOR will remove and lawfully recycle / dispose <br />of existing lamps and PCB ballasts. All ballasts that are determined to be non-PCB shall be disposed <br />of with non-hazardous waste. Noted items will be carefully recycled and disposed of through a <br />licensed recycling firm in accordance with all state and federal guidelines. Certificates verifying the <br />proper disposal and recycling of PCB containing materials will be provided by the vendor. <br /> <br />G. Lighting levels, if existing is identified to be over-lit per recommended standards, may be reduced. <br /> <br />H. CONTRACTOR is not responsible for any pre-existing electrical code violations or electrical system <br />deficiencies. <br /> <br />16.0 IC-134 <br />SUBCONTRATOR working in the State of Minnesota must comply with the withholding laws set forth in the <br />State. The tool used for this compliance is the IC-134 form. Upon completion of the project SUBCONTRACTOR <br />all lower tier subcontractors shall be required to complete the form prior to final payment. The form is available <br />from the State and can be applied for online. <br />EXHIBIT H Page 6 of 6 <br /> <br />