My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
8.2 SR 10-19-2020
ElkRiver
>
City Government
>
City Council
>
Council Agenda Packets
>
2011 - 2020
>
2020
>
10-19-2020
>
8.2 SR 10-19-2020
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/23/2020 4:07:47 PM
Creation date
10/16/2020 9:22:09 AM
Metadata
Fields
Template:
City Government
type
SR
date
10/19/2020
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
90
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />EXHIBIT D <br />FACILITY OPERATING PARAMETERS & <br />UTILITY SAVINGS CALCULATION METHODS <br /> <br />OPERATIONAL AND MAINTENANCE SAVINGS <br />The first-year annual operational savings identified in the Annual Operational Savings Table below are Stipulated <br />Operational Savings for the First Guarantee Year documented by the calculations and methodologies described <br />below and are not subject to measurement or verification. <br /> <br />These savings have been reviewed and analyzed by the Parties and may include but are not limited to repair and <br />maintenance cost reductions; deferred maintenance backlog cost reductions; and other long term operating <br />cost savings. In each subsequent Guarantee Year, the Stipulated Operational Savings in below table shall be <br />escalated at a rate of 3.2% per year to determine the Stipulated Savings from operating savings for such <br />Guarantee Year. The Client agrees and accepts that upon Substantial Completion of the Project, the Stipulated <br />Operational Savings set forth below shall be deemed achieved and included, with appropriate escalation as set <br />forth herein, in the Annual Savings determined for such Guarantee Year. <br /> <br />Annual Operational & Maintenance Savings <br /> <br /> <br /> <br /> <br />Notes <br />FIM/Building Stipulated Savings <br />Engineering Estimate <br />City Wide Lighting Improvements - Lighting update in <br /> <br />city buildings <br />$ 7,448 <br /> <br />Total Operational Cost Stipulated Savings in First <br /> <br />Guarantee Year: $ 7,448 <br /> <br /> <br /> <br />The above values are based on CONTRACTOR’s estimate of annual costs (maintenance & repair) associated with <br />these FIM’s and includes both internal and external costs related to the proposed FIM’s. The Engineering <br />Estimate above are based on experience, age, physical condition / state of the systems and equipment, site <br />evaluations, discussions with Client personnel, and review of existing costing associated with maintenance of <br />these items. <br />EXHIBIT D Page 27 of 27 <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.