My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
7.2 SR 10-05-2020
ElkRiver
>
City Government
>
City Council
>
Council Agenda Packets
>
2011 - 2020
>
2020
>
10-05-2020
>
7.2 SR 10-05-2020
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/28/2021 1:57:44 PM
Creation date
10/2/2020 1:24:56 PM
Metadata
Fields
Template:
City Government
type
SR
date
10/5/2020
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
64
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Transportation/ Circulation <br />Access to and from the site will occur at the one existing access on Industrial Boulevard. Internal <br />circulation is around the east side of the building to the rear of the building where the loading doors are <br />located. <br />The property is in an industrial park where large vehicle traffic occurs daily. There are no sidewalks for <br />pedestrian traffic. <br />Parking <br />Manufacturing, fabricating general industrial.• six stalls plus one off street parking space for eacb 500 square feet of floor <br />area. <br />The manufacturing floor area of the subject building is 1,530 square feet requiring 6 plus 3 parking stalls <br />for a total of 9 parking stalls. <br />Nightclub, tavern or bar. one parking space for every 50 square feet of floor area. <br />The tap room floor area of the subject building is 2,250 square feet requiring 45 parking stalls. <br />Office building: one parking space for each 300 square feet of floor area. <br />The office space floor of the subject building is 4,500 square feet requiring 15 parking stalls. <br />A total of 69 parking stalls are required based on the proposed project. The site has 32 striped parking <br />stalls and what appears to be room for approximately 42 additional stalls, for a total of approximately 74 <br />stalls. When they occupy the entire building for their tap room and brewery, the site will require around <br />80-85 parking stalls. At that time, they will need to provide the required parking or apply for a variance <br />to deviated from the parking requirements. <br />The applicant has indicated Industrial Boulevard has parking but other than in the core downtown <br />district, street parking has not been utilized to meet parking requirements. With the applicant's initial <br />plans, the required parking can be installed on their property. Street parking may be utilized for overflow <br />parking when the required on -site parking is full. <br />Patio Space <br />The applicant is proposing several patio areas on the property. One fenced patio area will be north of the <br />parking/circulation area and is located on grass. A second is proposed in the paved area north of the <br />building/loading area. Two areas are also shown in the grassy areas west and south of the building. <br />State Statue §340A.410, Subd. 7 states: "A licensing authority may issue a retail alcoholic beverage license <br />only for a space that is compact and contiguous". The various patio areas are not compact and <br />contiguous. A site plan showing a single compact and contiguous space and how this space will be <br />permanently delineated will be required. <br />The project will require a licensed architect to provide signed drawings, with code review, for any work <br />completed in and/or on the building, and shall include any proposed or future outdoor seating. <br />Landscaping <br />The ordinance requires 26 trees for the property. The exiting tree inventory satisfies this requirement. <br />
The URL can be used to link to this page
Your browser does not support the video tag.