My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
4.5. PCSR 09-22-2020
ElkRiver
>
City Government
>
Boards and Commissions
>
Planning Commission
>
Planning Packets
>
2011-2020
>
2020
>
09-22-2020
>
4.5. PCSR 09-22-2020
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/18/2020 12:35:13 PM
Creation date
9/18/2020 12:28:29 PM
Metadata
Fields
Template:
City Government
type
PCSR
date
9/22/2020
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
26
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
which none are marked ADA accessible. This lot will be modified but will retain 25 stalls, one of <br />which will be ADA Accessible. <br /> Is there proposed screening of the site? <br />The existing fencing around the police parking lot will be extended to capture the relocated lot, and <br />will consist of brick piers and tight-weave chain link to match the existing. <br /> Proposed building materials <br /> How do they comply with applicable design standards? <br />The existing Public Safety Building uses utility brick, 4” tall rockface CMU block, and EIFS in two <br />different colors. It also has accents of white steel and cast stone. The proposed additions seek to <br />complement this palette. To reduce overall costs at the rear of the building, the project proposes to <br />enclose the Squad Garage with Architectural Precast Wall Panels colored to match the existing brick. <br />The Apparatus Bay addition will consist of brick piers between bay doors with EIFS above to match <br />the existing colors and profiles. The corners at the south wall will be rockface CMU to match <br />existing. The south elevation features a large clerestory window similar to the existing building, but <br />uses gray vertical metal panels over a brick base to complement the library across Orono Parkway. <br />Where existing overhead doors are removed at the Apparatus Bay, the openings will be infilled with <br />EIFS on the west side to match the existing, and with Curtain Wall on the east side with a mullion <br />pattern to complement the adjacent apparatus doors. <br /> Signage – (at time of installation, a separate permit is required for each sign) <br />The site already includes several signs, both building-mounted and freestanding, and most will not <br />be affected by the project. Only two signs are of note. The first will be a relocation of the City of <br />Elk River logo on the southwest corner of the Apparatus Bays. This will be removed and relocated <br />in a similar position, but ~41’ closer to Orono Parkway. This sign will not be lit. The second sign <br />will be backlit lettering on the south wall of the Apparatus Bays with the words “Fire Station No. 2” <br />with a height of 2’-0” and a width of ~27’-0”. <br /> Is there outdoor storage? No <br />
The URL can be used to link to this page
Your browser does not support the video tag.