My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
8.1. SR 09-21-2020
ElkRiver
>
City Government
>
City Council
>
Council Agenda Packets
>
2011 - 2020
>
2020
>
09-21-2020
>
8.1. SR 09-21-2020
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/18/2020 10:34:13 AM
Creation date
9/18/2020 9:56:16 AM
Metadata
Fields
Template:
City Government
type
SR
date
9/21/2020
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
38
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
§ 3.1.14 Other Preconstruction Services <br />Insert a description of any other Preconstruction Phase services to be provided by the Construction Manager, or <br />reference an exhibit attached to this document <br />(Describe any other Preconstruction Phase services, such as providing cash flow projections, development of a project <br />information management system, early selection or procurement of subcontractors, etc.) <br />§ 3.2 Guaranteed Maximum Price Proposal <br />§ 3.2.1 At a time to be mutually agreed upon by the Owner and the Construction Manager, the Construction Manager <br />shall prepare a Guaranteed Maximum Price proposal for the Owner's and Architect's review, and the Owner's <br />acceptance. The Guaranteed Maximum Price in the proposal shall be the sum of the Construction Manager's estimate of <br />the Cost of the Work, the Construction Manager's contingency described in Section 3.2.4, and the Construction <br />Manager's Fee described in Section 6.1.2. <br />§ 3.2.2 To the extent that the Contract Documents are anticipated to require further development, the Guaranteed <br />Maximum Price includes the costs attributable to such further development consistent with the Contract Documents and <br />reasonably inferable therefrom. Such further development does not include changes in scope, systems, kinds and quality <br />of materials, finishes, or equipment, all of which, if required, shall be incorporated by Change Order. <br />§ 3.2.3 The Construction Manager shall include with the Guaranteed Maximum Price proposal a written statement of its <br />basis, which shall include the following: <br />.1 A list of the Drawings and Specifications, including all Addenda thereto, and the Conditions of the <br />Contract; <br />.2 A list of the clarifications and assumptions made by the Construction Manager in the preparation of the <br />Guaranteed Maximum Price proposal, including assumptions under Section 3.2.2 <br />.3 A statement of the proposed Guaranteed Maximum Price, including a statement Of the estimated Cost of <br />the Work organized by trade categories or systems, including allowances; the Construction Manager's <br />contingency set forth in Section 3.2.4; and the Construction Manager's Fee; <br />.4 The anticipated date of Substantial Completion upon which the proposed Guaranteed Maximum Price is <br />based; and <br />.5 A date by which the Owner must accept the Guaranteed Maximum Price. <br />§ 3.2.4 In preparing the Construction Manager's Guaranteed Maximum Price proposal, the Construction Manager shall <br />include a contingency for the Construction Manager's exclusive use to cover those costs that are included in the <br />Guaranteed Maximum Price but not otherwise allocated to another line item or included in a Change Order. <br />§ 3.2.5 The Construction Manager shall meet with the Owner and Architect to review the Guaranteed Maximum Price <br />proposal. In the event that the Owner or Architect discover any inconsistencies or inaccuracies in the information <br />presented, they shall promptly notify the Construction Manager, who shall make appropriate adjustments to the <br />Guaranteed Maximum Price proposal, its basis, or both. <br />§ 3.2.6 If the Owner notifies the Construction Manager that the Owner has accepted the Guaranteed Maximum Price <br />proposal in writing before the date specified in the Guaranteed Maximum Price proposal, the Guaranteed Maximum <br />Price proposal shall be deemed effective without further acceptance from the Construction Manager. Following <br />acceptance of a Guaranteed Maximum Price, the Owner and Construction Manager shall execute the Guaranteed <br />Maximum Price Amendment amending this Agreement, a copy of which the Owner shall provide to the Architect. The <br />Guaranteed Maximum Price Amendment shall set forth the agreed upon Guaranteed Maximum Price with the <br />information and assumptions upon which it is based. <br />§ 3.2.7 The Construction Manager shall not incur any cost to be reimbursed as part of the Cost of the Work prior to the <br />execution of the Guaranteed Maximum Price Amendment, unless the Owner provides prior written authorization for <br />such costs. <br />§ 3.2.8 The Owner shall authorize preparation of revisions to the Contract Documents that incorporate the agreed -upon <br />assumptions and clarifications contained in the Guaranteed Maximum Price Amendment. The Owner shall promptly <br />furnish such revised Contract Documents to the Construction Manager. The Construction Manager shall notify the <br />AIA Do—ent A133' - 2019. Copyright © 1991, 2003, 2009, and 2019 by The American Institute of Architects. All rights reserved. The <br />"AmC+rt car it stn at' of 1ich to ts,' `AIA,' the AIA Logo, and `AIA Contract Docin-rit are registered tr dema ks and may not b ased 8 <br />without �� rm Ls,ion. This draft was produced by AIA software at 13:58:42 ET on 06/29/2020 under Order No.2067434383 which expires on <br />04/02/2021, is not for resale, is licensed for one-time use only, and may only be used in accordance with the AIA Contract Documents® Terms <br />of Service. To report copyright violations, e-mail copyright@aia.org. <br />User Notes: (1834312825) <br />
The URL can be used to link to this page
Your browser does not support the video tag.